Building permit intelligence · Boston, MA
282 Walnut Av has 18 municipal building permits on file in Ward 12. The latest recorded activity was a sol permit dated Apr 14, 2026. Permits at this address represent $50K–$100K in total declared construction value. PropertyLabs also identified 6 mapped permits within 2 km of this address.
Solar Panels
Solar Panels
Solar Panels
Solar Panels
Remove one full bathroom in basement.
Kitchen remodeling, replace all cabinets, countertop, sink, tiles
6 mapped permits within 2 km, shown on the intelligence map above.
4 other addresses on Walnut Av with municipal permit records in Boston.
This address has 18 permit records in PropertyLabs' public history and is located in Ward 12. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 282 Walnut Av is dated Apr 14, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 282 Walnut Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Replace three stairway at rear porches only( three floors).
install wiring for hot water heater and lighting and receptacles in the basement area.
INSTALL WIRING FOR FOUR WASHERS AND GAS DRYERS WITHIN THE BASEMENT AREA. INSTALL SEVERAL LIGHTS
replace two gas stoves and install four gas dryer
two kitchen plumbing replacement, and one laundry room with four washing machines
build new laundry room in Basement, 11’x15’. 2”x4’ wall, R15 insulation on wall, plumbing and wiring
replace existing local smoke / carbon-dioxide detectors within units 2, 4, and 6 where required.
install 15 cable and phone jacks in the bedrooms and living rooms within units 2, 4, and 6
install new receptacles where needed within units 2,4,and 6 replace all existing plugs and switches with new ones, replace light fixtures where required and change recessed light t…
Unit#2 &unit#4 kitchen remodeling Both kitchens replace cabinets and countertop, tiles.
replace kit sink and dish washer
move a gas stove out to let the contractor fix the floor, then put it back and reconnect it.
Short Form Bldg Permit · INSUL · Jul 20, 2026