Building permit intelligence · Boston, MA
450 Walnut Av has 78 municipal building permits on file in Ward 12. The latest recorded activity was a erect permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 5 mapped permits within 2 km of this address.
Erect
Low Voltage
Fire Alarm
Low Voltage
Fire Alarm
Electrical
5 mapped permits within 2 km, shown on the intelligence map above.
4 other addresses on Walnut Av with municipal permit records in Boston.
This address has 78 permit records in PropertyLabs' public history and is located in Ward 12. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 450 Walnut Av is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 450 Walnut Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Electrical
Electrical
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
Plumbing
Fire Alarm
City of Boston
Fire Alarm
Plumbing
City of Boston
City of Boston
Fire Alarm
Plumbing
City of Boston
Electrical
Electrical
Temporary Service
Temporary Service
Temporary Service
Temporary Service
Temporary Service
Temporary Service
Plumbing
Plumbing
Plumbing
Plumbing
Erect
Erect
Erect
Erect
Erect
Erect
Erect
AT RISK/FOUNDATION &; FRAMING STEEL for new construction of White Stadium - East Grandstand, including construction of a 5000-seat grandstand, canopy, support wings, track and fiel…
Temporary 12x60 Construction office trailer and 36x60 triple wide office trailer for Bond Building construction for White stadium west grandstand project, trailer to be maintained…
TRIPLE WIDE Construction Field Office Trailer with TEMP Generator CONNECTION. White Stadium East Grandstand Abatement, Demolition and Site Enabling Work. - GENERATOR INSTALL AND (3…
Temporary Triple Wide (36'x60') Construction Field Office Trailer for Bond Building Construction for City of Boston - White Stadium - East Grandstand Construction project. Trailer…
NEW EVERSOURCE FEEDER TO METER AND DISCONNECT, CONTINUE NEW SECONDARY TO (3) # 1, (1) #6G TO TEMP TRAILER. DISCONNECT GENERATOR. 125a (3) # 1, (1) #6G TO TEMP TRAILER. DISCONNECT G…
Demolition of the west grandstand. Original facade to remain. Remove of foundation is included in areas of demolitionDig Safe#20250802977
Demolition of the existing EAST Grandstand only and misc. site improvements at White Stadium to make way for a new structure. The demolition of the WEST Grandstand is not a part of…
Temporary electric service for future construction project at White Stadium EAST grandstand.
GENERATOR INSTALL AND (3) # 1, (1) #6G TO TEMP TRAILER. Temporary Construction Field Office Trailer 12' x 60' with Generator. White Stadium East Grandstand Abatement, Demolition an…
Temporary Construction Field Office Trailer 12' x 60' with Generator and Holding Tank to Support White Stadium East Grandstand Abatement, Demolition and Site Enabling Work.
TEMP POWER DUCT BANK, FROM EXISTING EVERSOURCE MANHOLE, (1) 5'' C FOR EVERSOURCE PRIMARY, (2) 4" C AND INSTALL OF SECONDARY CABLE NOTED ABOVE. TERMINATE TO TEMP POWER SHACK FOR CON…
Drill 5 test borings for new stadium facility.
Supplying temp power from the generator for plugs and music.
At White Stadium: Erect temporary stage 24'w x 16'd x 2'h with 2 sets of stairs, 24'x4' ada ramp and rear railing; for Boston Public Schools Graduation Ceremonies Jun 5-21, 2023. c…
Supplying temp power from the generator for plugs and music.
Adding new outlets for water bottle filler stations with new circuits from existing panels.
Installation of 6 bottle filling units at White Stadium on first floor. Bottle Fill Initiative
Installing a temporary frame tent without walls at White Stadium for the Boston Fire Department 2022 Team Program. Installing on or about 07/11/22 and removing on or about 08/26/22…
Temporary tents for film production. 40 X 80 60 X 120
Temp generator power for film production. (AND ONLY TEMP GENERATOR POWER) 5-16-2022 " White Stadium"
ELECTRICAL MAINTENANCE FOR THE WHITE STADIUM. CITY OF BOSTON - NO PERMIT FEE.
Installing a 16x40 frame tent with no walls for the Boston Fire Department Teen Program. Install on or about 07/06/21 and remove on or about 08/17/21.
ground the generator for the event
Using a Temporary generator, provide power to a commercial being filmed at White Stadium at Franklin Park
INSTALL NEW SECURITY/CARD ACCESS AT WHITE STADIUM. NO PERMIT FEE--SEE CITY OF BOSTON LETTER
Replacement of Exterior Doors, Frames, and Hardware. Installation of New Security and Card Access Systems.
Temp Generator Power for film production 4-14-16 ( Base Camp)
Installation of new sports lighting - 100 Fixture.
Short Form Bldg Permit · INSUL · Jul 20, 2026