Building permit intelligence · Boston, MA
290 Northern Av has 131 municipal building permits on file in Ward 6. The latest recorded activity was a other permit dated Jul 1, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 2 km of this address.
Other
Other
Other
Special Events
Special Events
Special Events
4 mapped permits within 2 km, shown on the intelligence map above.
7 other addresses on Northern Av with municipal permit records in Boston.
This address has 131 permit records in PropertyLabs' public history and is located in Ward 6. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 290 Northern Av is dated Jul 1, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 290 Northern Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Special Events
Special Events
Special Events
Special Events
Other
Other
Other
Other
Other
Other
Other
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Other
Other
Generators
Generators
Other
Other
Upgrade Fire Alarm Panel Power & Lighting For New Fire Command Room
Fire Alarm
Fire Alarm
Electrical
Electrical
Other
Other
Other
Other
Other
Other
Special Events
Special Events
Other
Other
Other
To provide temp power and electric heaters fir Graduations at the Pavilion from 5/04 to 5/25/2023
Erect 9x70 and 15x30 tents on 5/5/23, removal on 5/7/23.
Install new 200A service to conex box for tel/data equipment. Will consist of 1 new 200A service, 1 meter, 2 panels, 1 transformer 150KVA, 6 outlets, 4 lights and 1 smoke detector.
Temporary electrical service derived from a Twin 300kw generator for the purpose of providing power for lighting service for concert at Leader Bank Pavilion on Monday September 19,…
Erect 40x40, 30x100, 20x60, 15x30, (3) 10x20, 10x10 and 9x70 tents on 9/6/22, removal on 9/8/22.
Erect 9x70 and 15x30 tents on 6/10/22, removal on 6/14/22.
Replace pvc piping with cast iron and copper.
Install a 100A single phase service from the existing power equipment at the Blue Hills Bank Pavilion facility to support the Owners Trailer for the Parcel K project across the str…
Erect 9x70 and 15x30 tents on 6/8/19. Removal on 6/10/19.
Erect 20x80 and 9x60 tents on 5/23/19. Removal on 5/26/19.
Erect 20x80, 9x60, 9x70 and 15x30 tents on 5/10/19. Removal on 5/20/19.
replacing 200 amp feeder with a 250 underground pipe. adding 100 amp 3 phase panel to feed 2 led screens on both sides of stage. feeding 2 led screens with control box supplied by…
Temporary generator power and electrical distribution to power electric heaters as part of various Commencement activities at the RTBP Pavilion from May 8th through May 20th of 201…
Install telephone and data wiring.
Erect (9) 10x10 and 25x35 tents on 9/22/18. Removal on 9/22/18.
Erect 30x40 and (2) 15x30 tents on 9/12/18. Removal on 9/14/18.
Erect 9x100 tent on 6/2/18. Removal on 6/4/18.
Erect 20x80 and 9x60 tents on 5/23/18. Removal on 5/26/18.
Erect 20x80, 9x100 and 9x60 tents on 5/17/18. Removal on 5/21/18.
Gas piping for kitchen equipment
Erect 9x100 tent on 5/11/18. Removal on 5/13/18.
Temporary generator power and electrical distribution to power electric stage heaters during commencement activities at the Blue Hill Bank Pavilion from May 12th through May 21st o…
Install granite steps for a sloped walkway at entrance as well as railings
Installation of plumbing fixtures for new concession stands at Blue Hills Bank Pavillion.
Wire new concession stands and install 8 new panels
Install ground rods and ground footings. Repair damaged conduit, strip out electrical panels and devices to be be replaced
Replace existing concessions stands, box office and concessions commissary facilities with modular sea-crate container concessions stands, box office and concessions commissary fac…
Erect 9x70 tent on 8/18/17. Removal on 8/21/17.
Erect 30x40 and (2) 15x30 tents on 7/11/17. Removal on 7/12/17.
Site Lighting
Set 2 temporary generators to power mobile cell site
Erect 9x70 tent on 6/2/17. Removal on 6/5/17.
Erect 20x80, 9x70 and 9x60 tents on 5/18/17. Removal on 5/27/17.
Install power to new catering, changing rooms
installing 3 toilets and 3 lav's in a trailer
Temporary generator power and electrical distribution services for electric stage heaters for use during concerts and commencement activities at the Blue Hill Bank Pavilion from Ma…
replace 3 - 8x20 trailers with 3 - 8x20 recycled containers - one has bathroom/shower trailer - the other 2 are offices, dressingroom for visiting production people.
Erect 9x70 tent on 8/20/16. Removal on 8/22/16.
Erect 9x70 tent on 6/4/16. Removal on 6/6/16.
Install a new roof on the mens and ladies room.
Erect 20x80, 9x70 and 9x60 tent on 5/18/16. Removal on 5/23/16.
Temporary generator power and electrical distribution for Commencement activities at the Blue Hill Bank Pavilion from May 17th through May 23rd of 2016.
Remove and replace devices and fixtures for tent top replacement
put new cover tent fabric material on existing structure
remove and replace fabric of existing concert tent
Erect 9x70 tent on 8/16/15. Removal on 8/17/15.
Back up generator
back up generator
Erect 20x20 tent on 6/30/15. Removal on 7/1/15.
Erect 10x20 tent on 6/8/15. Removal on 9/19/15.
Erect 9x70 tent on 6/6/15. Removal on 6/8/15.
Replace 25 led fixtures on the large truss arch on the tent.
Erect 20x80, 9x70 and 9x60 tents on 5/14/15. Removal on 5/23/15.
Temporary generator and electrical distribution services at the Bank of America Pavilion as part of commencement activities from May 15th through May 17th of 2015.
Service to parking lot lighting.
To Erect (4) 10x10 Temporary Tents on 8/10/14/. Removed on 8/11/14
Erect 9x70 tent on 8/15/14. Removal on 8/17/14
Temporary construction service.
The construction of a new sheet pile wall.
Temporary generator and power distribution for video trucks as part of event at the Blue Hill Bank Pavilion on July 18th of 2014.
Erect 12x22 tent on 6/23/14. Removal on 6/26/14.
Erect 20x20 tent on 6/2/14. Removal on 6/3/14.
Erect 9x70 tent on 5/30/14. Removal on 6/2/14.
Erect 10x20 tent on 5/19/14. Removal on 10/1/14.
Elge to install (8) toilets, (5) lavs, (1) urinal and (2) floor drains on the first floor.
Temporary generator power and electrical distribution for Commencement activities at the Blue Hill Bank Pavilion From may 6th through May 19th.
Erect 20x80, 9x70 and 9x60 tents on 5/8/14. Removal on 5/24/14.
Relocate feeder and install new 200 amp load center for VIP bath trailor
exploratory excavation for VIP restrooms
Erect 20x30, 20x20 and 10x10 tents on 9/28/13. Removal on 9/29/13.
Erect 20x20 tent on 9/17. Removal on Thursday 9/19.
Erect 9x70 tent on 8/24/13. Removal on 8/26/13.
Erect 20x80 tent on 8/3/13. Removal on 8/5/13.
Erect 10x20 tent on 5/27/13. Removal on 10/1/13.
Erect 9x70 tent on 5/31/13. Removal on 6/3/13.
Erect 20x20 tent on 5/28/13. Removal on 5/29/13.
Erect 20x80, 9x70 and 9x60 tents on 5/9/13. Removal on 5/21/13.
CCTV Install 3 devices Exact address 290 Northern Ave, Fleet Boston Pavilion, Boston, MA 02210
Erect 20x20 tent on 5/30/12. Removal on 5/31/12.
Install lights and fan in vip tent