Building permit intelligence · Boston, MA
306 Northern Av has 232 municipal building permits on file in Ward 6. The latest recorded activity was a intext permit dated Jun 17, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 2 mapped permits within 2 km of this address.
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Generators
Generators
Generators
2 mapped permits within 2 km, shown on the intelligence map above.
7 other addresses on Northern Av with municipal permit records in Boston.
This address has 232 permit records in PropertyLabs' public history and is located in Ward 6. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 306 Northern Av is dated Jun 17, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 306 Northern Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Generators
Generators
Generators
Generators
Generators
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Temporary Service
Temporary Service
Special Events
Special Events
Other
Other
Other
Other
Special Events
Other
Other
Special Events
Special Events
Demolition - Interior
Demolition - Interior
Other
Other
Plumbing
Plumbing
amendment to ALT1263721, changes to foundation plan for first floor freezer area, as per plans, no additional cost.eplan
Other
Other
Gas
Gas
New 2nd floor production room build out
Install new RPZ and sewer abatement meter, as requried by Boston Water & Sewer
To provide temp power distribution via land service for Harpoon October Fest on 10/4-6/2024
Install temporary 40x200, 80x160, 30x60, 20x60, (2) 30x30, 15x20, (2) 10x20, (3) 10x10, 9x20 tents & (2) 12'x24'x30" & 12'x 32'x32" stage used for Harpoon Brewery's Octoberfest. In…
Temporary electrical service derived from existing land service to be utilized for all aspects of the 2024 Harpoon Fest on May 17-May 19, 2024.
Install temporary 80x160, 40x200, 9x20, 10x10 tents and 42x20 & 12x32 stage to be used for private function. Installed 5/20. Removed by 5/24. Event date 5/22/24.
Install temporary 40x200, 30x60, 20x30, 30x30, (3) 10x20, 20x60, 9x30, 9x20, 10x10 tents and 12'x32'x30" stage used for Harpoonfest. Installed as early as 5/11. Removed by 5/24. Ev…
Install 30x60 tent used for outdoor brewery seating. Installed as early as 3/22. Removed by 10/4. Tent will have no sides.
Temporary electrical service for the Harpoon St Pats festival on March 8-9, 2024
Install temporary 40x200,80x140,20x80,30x80,20x150,10x10,(2) 10x20,30x30,15x20 tents and temporary 12x24x30" &; 12x32x30" stages for Harpoon St. Patricks day festival. Installed as…
Install (17) temporary 170,000BTU heaters each connected to (1) 100lb propane tank. Installed 3/5. Removed by 3/12.
Connect outside show tap box to existing exterior electrical panel Temporarily
Temp power distro for Harpoonfest on 9/29-30/2023
Install temporary 30x60 used for outdoor brewery seating. Installed 10/9. Removed 11/6. No sides
Install temporary 40x200, 60x160, 30x60, (2) 30x30, 20x110, 20x60, 15x20, (2) 10x20, (5) 10x10, 9x30 tents and 12'x32'x30" and 12'x24'x30" stages to be used for Harpoon Brewery's O…
Provide 1 x 30kW and 2 x 50kW diesel portable generators and all outdoor rated portable electrical distribution equipment from 9/9 (install) through 9/10/23 (install, event and rem…
Erecting a 22 meter tent for a theatrical production called, "Mr. Swindle's Traveling Peculiarium
Stages for Harpoon Summerfest. 12' x 32' x 30" and 12' x 24' x 30" Install 5/17/23. Remove by 5/23/23. Stages in conjunction with tents permitted on SF1462289.
Temporary electrical distribution for Harpoonfest at the Harpoon Brewery from May 19-21, 2023
Install temporary 20x40 tent used for outdoor seating at Harpoon Brewery. Installed 5/22. Removed by 9/26/23.
Install temporary 40x200, 20x60, (2) 40x80, (2) 30x30, 15x20, 10x20, 10x30, 9x30, 9x20 and (2) 10x10 tents to be used for Harpoon Brewery's Summerfest. Installed by 5/18/23. Remove…
Temporary power distribution for the Harpoon Brewery's St Patrick's Day Festival.
Install temporary 40x200, 80x140, 20x150, 20x80, 30x80, 10x30, (2) 30x30, 15x20, (2) 10x20 tents and 12'x24'x30" & 12'x32'x30" stages. Used for Harpoon Brewery's St. Patrick's Day…
Reinforce Truss 12W with LVL's and wire rope
Install (19) temporary 170,000BTU propane heaters used to heat temporary tents for Harpoon Brewery's St. Patrick's day events. Installed 3/2. Removed 3/7/2023. Event dates 3/3 & 3/…
New electrical service for new street control cabinet to be installed on Northern Ave.
Temporary electrical distribution for Harpoon's Octoberfest at the parking lots outside the Harpoon Brewery
Providing a tent for a theatrical performance called Mr. Swindle's Traveling Peculiarium
Connect outside show tap box to existing exterior electrical panel Temporarily
Install temporary 40x200, 60x160, 30x60, (2) 30x30, 20x60, (2) 20x30, 15x20, (3) 10x20, (2) 10x10, 9x30 tents and 12'x24'x30", (2) 12'x32'x30" stages. Installed by 9/28. Removed by…
Install temporary 30x60 tent to be used for outdoor brewery seating. Installed 5/23/22. Removed 11/4/22.
Temporary electrical service to be utilized for the Harpoonfest Events from May 20-22 2022.
Install 40x200, 20x60, (4) 40x60, 40x80, (2) 30x30, 15x20, (2) 10x20, 9x30, 9x20, (2) 10x10, 30x80, 20x90 tents and (2) 12x24x30" stages for Harpoon Fest. Installed 5/16. Removed 5…
New refrigerated packaging room in an existing interior space and refrigerated extension to existing fish house processing space, both enclosures are inside the existing building.e…
Temporary Electrical distribution for Harpoon St. Patrick's Festival
Install temporary 40x200, 80x140, 20x80, 30x80, 20x150, 10x30, (2) 30x30, 15x20, (2) 10x20 tents to be used for Harpoon Festiva, install 12 x 28 stage.l. Installed as early as 2/28…
Install (19) temporary 170,000BTU heaters. Each connected to (1) 100lb propane tank to be used to heat temporary tents for Harpoon Fest. Installed as early as 2/28/22. Removed by 3…
Temporary electrical service derived from exiting special events disconnect located inside Harpoon Brewery. Service to be used for all aspects of Oktoberfest held at Harpoon Brewer…
Install temporary 40x200, (2) 30x60, (2) 30x30, (2) 20x60, (2) 20x30, 15x20, (2) 10x20, (3) 10x10, 9x30 tents and 12'x24'x30" and 12'x32'x30" stages. Installed by 9/30/2021. Remove…
Install temporary 40x200, 30x60, (2) 30x30,(2) 20x60, 15x20, (2) 10x20, (2) 10x10, 9x30 tents to be used for Harpoon Summer Fest. Installed by 7/22/2021. Removed by 7/26/2021. Even…
Installation of temporary power for Harpoon Fest at the Harpoon Brewery on July 22, 23, and 24. Power to be derived from existing event camlock 100A service from inside the buildin…
Furnish and install new reinforced EPDM roof membrane at existing converted elevator penthouse roof.
First floor two refrigeration room extensions, three compressors, six fan coil units, 3-60 480v feeds
Install temporary 30x60 tent to be used for Harpoon Brewery Seating. Installed 5/25/2021. Removed by 10/5/2021.
Install temporary 30x60 tent to be used as outdoor brewery seating. Installed by 3/30/2021. Removed by 10/5/2021.
Three 285 Amp to a 800 Amp MDP panel and 112.5 KVA transformer and panel
Install temporary 40x80 and 10x20 tents to be used for additional brewery seating. Installed 11/4/2020. Removed 3/5/2021.
To provide generator and temporary heat for a tent at Harpoon Brewery from November 5, 2020, to March 5, 2021.
Interior renevations to modernize seafood processing space.EPLAN
Install (2) temporary 30x60 tents to be used for Patio seating at Harpoon brewery. Installed 6/1/2020. Removed by 9/9/2020.
Install a new 120/208v, 150 amp, 3 phase, 4 wire, Nema 3r Panelboard for the Outdoor Beer Garden to be located in the front parking lot of Harpoon Brewery. Install 8 GFCI double du…
Install temporary 40x200, 80x140, 20x80, 30x80, 20x150, 10x30, 10x20, 15x18, 30x50, 25x25, 9x60 tents and a 12'x30'x30" Stage.
Temporary electrical distribution for the 'Haproon Mac and Cheese Challenge' event on March 5th, and the 'Harpoon St. Patrick's Festival' on March 6th and 7th of 2020.
Harpoon Brewery -; To use Outdoor space as a Seasonal;Outdoor Patio w/ 25 picnic benches and 50 cocktail tables -- no construction work to be done - see plans filed
Install (17) temporary 170,000BTU propane heaters and (3) 80,000BTU propane heaters used to heat temporary tents. Installed as early as 3/2/2020. Removed 3/10/2020. Event dates 3/5…
Renovation of interior space to create modernize seafood processing area
Temporary electrical distribution for the Harpoon Octoberfest event at the Harpoon Brewery on October 4th, 5th and 6th of 2019.
Install 40x200, 20x60, 40x80, (3) 40x60, (2) 20x30, 30x50, 15x20, 9x30, (2) 9x20, (6) 10x10, temp tents, and (3) 12'x32'x30" Stages for Octoberfest. Installed 10/3-10/5, removed by…
Temporary generator power and electrical distribution for Harpoonfest event at the Harpoon Brewery.
Install 40x200, 20x60, (3) 40x60, 40x80, 30x50, 15x20, 9x30, (2) 9x20, (3) 9x10 temp tents, and 12'x32'x30", 12'x24'x30" temp stages for Harpoon Summer Fest. Installed 5/5-5/16, re…
Temporary electrical distribution for the 2019 Harpoon St. Patrick's Festival events on March 8th and 9th of 2019.
Install 40x200, 80x140, 20x80, 30x80, 20x150, 10x20, 15x18, 30x50, 25x25, 9x60 temporary tents, and 12'x32'x30" temporary stage. Installed 3/4-3/7, removed by 3/12, event dates 3/7…
Install (17) 170,000BTU, and (3) 80,000BTU heaters for temporary tent. Installed 3/4-3/7 removed by 3/12, event dates 3/7-/9
Seminar Room, Refrigerated, Storage of Fish, Light MFGR Product Design, Brewing, Print Plant &; Parking Certificate For: Mezzanine -1st fl. - only Alt791254 - 2/9/18
Install new 120/240 volt 60 amp service for Cellular Antenna. Antenna draws 6 amps. Pole 3458/9
Temporary electrical distribution for the Harpoon Octoberfest event at the Harpoon Brewery on September 27th through 29th of 2018.
Install 80x160, 40x200, 20x60, 20x20, 10x10, 40x80, 30x60, 30x50, 15x20, (3) 9x20, and (4) 9x10 temp tents, and (2) 12'x24'x30", 12'x32'x30" temp stages for Octoberfest. Installed…
Truss Reinforcements.
Two geotechnical soil borings to approximately 90 feet deep. Work will be on the pavement areas of the property.
install 40x200, 20x60, (3) 40x60, 40x80, 30x50, 15x20,9x30, (2) 9x20, (3) 9x10 temporary tents, and 12'x32'x30", 12'x24'x30" temporary stages. Installed 5/14, removed by 5/26, even…
At Parcel V1, Install a complete parking lot light system, electric vehicle charging stations, and provide power to guard shack. Underground conduit in duct bank.
Temporary electrical distribution services for the Harpoonfest event at the Harpoon Brewery on May 18th and 19th of 2018.
Wire &; Install 480 volt 3 phase 100 amp feed for control cabinet. Furnish &; Install 9- 4ft lights under new mezzanine. Suite #2 Harpoon Brewery.
Installation of 1 new Speaker/Strobe on newly expanded Mezzanine level.
Install 40x200, 80x140, 20x80, 30x80, 20x150,10x20, 15x18, 30x50, 25x25,9x60 temporary tents, and 12'x32'x30" stage for St. Patricks Day. Installed on 3/5-3/7 removed by 3/13, even…
Temporary electrical distribution at the Harpoon Brewery for the 'Mac & Cheers' event on March 8th and the 'St. Patrick's Festival' on March 9th and 10th of 2018.
Extension of existing interior steel mezzanine including new concrete footings
Seminar Room, Refridgerated, Storage of Fish, Light MFGR Product Design, Brewing Print Plant &; Parking Certificate for the;Covered Loading Dock. ALT677689 issued: 4/20/17
Install 80x160, 40x200, 20x60, 20x20, 40x80, 30x60, 30x50, 15x20, 9x30, (2) 9x20, (4) 9x10 temporary tents, and (2) 12'x24'x30", (1) 12'x32'x30"stages for Octoberfest. Installed 9/…
Temporary electrical distribution for the Harpoon Octoberfest event at the Harpoon Brewery on September 28th, 29th and 30th.
; Use of outside paved area for Friday and weekend Beer Garden space. This will be a weather dependent, uncovered space with picnic tables. No structural changes involved. No Tents…
install outlets on loading dock and power for future doors
Install 40x200, 20x60, (3) 40x60, 40x80, 30x50, 15x20, 9x30, (2) 9x20, (3) 9x10 temporary tents, and 12'x32'x30", 12'x24'x30" stages. Installed on 5/13 removed by 5/27
Enclosing existing covered loading dock
Temporary electrical distribution services for the Harpoonfest events at the Harpoon Brewery on May 18th through May 21st of 2017.
Replacement of damaged 80" wide double out swing entry doors with new automated sliders. New 80" wide doors incorporate emergency egress breakaway functionality on both active and…
Harpoon Brewery is enclosing their loading dock and adding 4 overhead doors and 1 exit door. We're installing 1 pull station at new door and 1 ceiling mount speaker/strobe over loa…
Install (1) 40x200, (1) 80x140, (1) 20x80, (1) 30x80,(1) 20x150, (1) 10x20, (1) 15x18, (1) 30x50, (1) 25x25, (1) 9x20 temporary tent, and (1) 12'x32'x30" stage for Harpoon`s St Pat…
Install (17)170k & (3)80k BTU propane heaters,w/ (29)100lb tanks Installed on 2/27&removed by 3/7
Temporary electrical distribution for the Harpoon Brewery St Patrick' Day Festival on March 3rd and 4th of 2017.
Installation of new metal interior roof access stair to allow maintenance of HVAC equipment.
COOLER EXPANSION - ELEVEN 96" LED FIXTURES
FIRST FLOOR NORTH END OF BUILDING - AREA 12 - PACKING AREA RELOCATE TWO OVERHEAD DOORS
FIRST FLOOR - NORTH END OF BUILDING - PACKING/SHIPPING AREA
Install (1) 80x160, (1) 40x200, (1) 20X60, (1) 20X20, (1) 40x80, (1) 30x60, (1) 30x50, (1) 15x20, (1) 9x30, (2) 9x20, and (4) 9x10 temporary tents, and (2) 12'x24'x30", and (1) 12'…
Temporary electrical distribution for the Harpoon Octoberfest event at the Harpoon Brewery on September 30th and October 1st of 2016
First floor Rear - Expansion new refrigeration panels and Fire Alarm
Temporary electrical distribution for the harpoonfest event at the Harpoon brewery on May 20th and 21st of 2016.
Install (1) 40x200x10, (1) 20x60x10, (2) 40x60x10, (1) 40x80x10, (1) 40x60x8, (1) 30x50x8, (1) 15x20x8, (1) 9x30x10, (1) 9x20x10, (3) 9x10x8 temporary tents, and (1) 12'x32'x30", (…
Modification of existing fish handling and storage spaces by adding non-structural insulated panels to improve cooler efficiency and maintain required levels of refrigeration. Tota…
Install Temporary 40'x200', 80'x140', 20'x80', 30'x80', 20'x150',10'x20',15'x18', 30'x50' Tents, and a 12'x32'x30" Stage. Install beginning 2/29/16, remove by 3/8/16
Temporary electrical distribution for the Harpoon Brewery St. Patrick's Festival on March 4th and 5th of 2016.
install 17, 170,000 BTU heaters with 100lb Propane tank each to heat temporary tents. Install begins on 2/29, removed by 3/8/2016
We will be removing a concrete loading dock that is attached to the Nagle Fish Company to lay pipe.
ProvideShoring as required Demolish 2 existing Trusses Provide and install two new Trusses per engineered Drawings provided by Structures North Consulting Engineers
Seminar Rooms, Refrigerated Storage of Fish, Lt Mfg,Product Design, Brewery, Printing Plant, Parking,;Office; Certificate of Occupancy for;the 3 new floors (office space &; 2 stora…
Install staging for Octoberfest. Install begins: 9/27/15. Remove by: 10/6/15. (2) 12' x 24' x 30" Stages, (1) 12' x 32' x 30" stage, and (1) 8' x 48' Ramp.
Temporary electrical distribution for the Harpoon Brewery Octoberfest event on October 2nd and 3rd of 2015.
Install temporary tents on 9/27 -10/2/2015 and remove 10/6/2015. (1) 40x200; (1) 20x60; (2) 40x60; (1) 40x80; (1) 30x60; (1) 20x40; (1) 20x20; (1) 30x50; (1) 15x18; (1) 16x16; (2)…
Install receptacle outlets and lighting in converted elevator shaft being made into storage areas.
Build 3 new floors into a 14x12 abandoned elevator shaft
Install temporary tents on 5/7/15 and remove by 5/23/15. Tents: (1)40x200; (1)20x60; (2)40x60; (1)40x80; (1)30x50; (1)15x20; (1)9x30; (1)9x20; (4)9x10.
Temporary generator power and electrical distribution at the harpoon Brewery as part of the Summerfest Festival event on May 15th and 16th of 2015.
Instal 17 170,000 BTU propane fired unit heaters to heat temporary tents for St. Patricks day festival
Install temporary tents for Harpoon St. Patrick's day festival on 3/2/15, remove by 3/10/15: (1) 40' x 200', (1) 80' x 140', (1) 20' x 80', (1) 30' x 80', (1) 20' x 150', (1) 10' x…
Temporary electrical distribution for the Harpoon St. Patrick's Festival at the Harpoon Brewery on March 6th and 7th of 2015.
Legal Occupancy:; Seminar Rooms, Refrigerated Storage of Fish, Lt. Mfg, Product Design, Brewery, Printing plant, Parking doc#alt207152 COO for the Harpoon Brewery (increase capacit…
Temporary generator power for the Harpoon Oktoberfest event at the Harpoon Brewery on October 3rd and 4th of 2014.
Install (1) 40' x 200', (1) 20' x 60', (2) 40' x 60', (1) 40' x 80', (1) 30' x 60', (1) 20' x 40', (1) 20' x 30', (1) 20' x 20', (1) 15' x 30', (1) 9' x 30', (1) 9' x 20' temporary…
On lower roofs remove epdm and bur systems. Install polyiso mechanically. Install bonded pvc roof system. On upper roof remove existing epdm membrane only. Install layer of polyiso…
Harpoon Brewery - No physical construction. To increase Occupancy from 300 to 398 persons based on preexisting conditions
Install temporary tents for harpoon summerfest. (1) 40' x 200', (1) 20' x 60', (2) 40' x 60', (1) 40' x 80', (1) 20' x 30', (1) 20' x 20', (1) 15' x 30', (1) 9' x 30', (1) 9' x 20'…
Temporary electrical distribution for the Harpoonfest event at the harpoon Brewery on May 16th and 17th of 2014.
Temporary electrical service and distribution for the Harpoon St. Patrick's Day Festival at the Harpoon brewery on March 7th and 8th of 2014.
Install (17) propane fired temporary unit heaters to heat temporary tents on 3/3/14 and remove by 3/11/14
Install temporary tents for Harpoon St. Patrick's day festival on 3/3/14, remove by 3/11/14: (1) 40' x 200', (1) 80' x 140', (1) 20' x 80', (1) 30' x 80', (1) 20' x 150', (1) 9' x…
Installing 2 new Back flow preventers.
Install temporary tents for Harpoon Octoberfest. (1) 40' x 200', (1) 20' x 60', (2) 40' x 60', (1) 40' x 80', (1) 30' x 60', (1) 20' x 40', (1) 20' x 30', (1) 20' x 20', (1) 15' x…
Temporary electrical distribution for the harpoon Brewery's Oktoberfest event on October 4th and 5th of 2013.
Furnish and install (2) 3" raceways and (1) 200A feeder from the MSWB to a 200a NEMA 3R disconnect for a 60 ton temp chiller. Chiller furnished by owner, final connections by owner…
Install (1) 20' x 40' temporary tent on 6/14/13 and remove by 6/17/13
Legal Use and Occupancy is Seminar Room, Refrigerated Storage of Fish, Light Manufacturing, Product Design, Print Plant and Parking Certificate Of Use and Occupancy for Bar, Visito…
;Amend permit ALT175217 to Upgrades and additions to Fire Alarm System. Per Plan
Temporary power for the Harpoon Brewery's Harpoonfest event on May 17th and 18th of 2013.
Install (1) 40' x 200', (1) 20' x 60', (2) 40' x 60', (1) 40' x 80', (1) 20' x 30', (1) 20' x 20', (1) 15' x 30', (1) 9' x 30', (1) 9' x 20', (1) 4' x 10', (5) 9' x 10' temporary t…
Seminar Rooms, Refrigerated Storage of Fish, Lt Mfg, Product Design, Brewery, Printing plant, Parking and walkway Alt175217 issued 12/3/2012 TEMP COO for Walkway ONLY (To Expire in…
add 24 speaker strobes, replace 10 conventional pulls with addressable devices, and add 6 strobe only
Wiring of beer making machines. Wire two electric infared heaters. wire lowvoltage to machines. Furnish & Install 400amp 480/277 volt three phase service with one 400 amp 480v0lt m…
Temporary electrical distribution as part of the Harpoon St. Patrick's Festival on March 1st and 2nd of 2013.
Install (1) 40' x 200', (1) 80' x 140', (1) 20' x 80', (1) 30' x 80', (1) 20' x 150', (1) 9' x 20', (1) 20' x 20', (1) 15' x 30', (1) 20' x 30', (1) 4' x 10' temporary tents on Feb…
Install (17) 170,000 BTU temporary unit heaters to heat temporary tents
Install (4) cat5 cables with IP cameras and (2)70 volt speakers.
seminar rooms, refrigerated, storage of fish light mfgr, product design, brewing, print plant, parking, Bar /visitor center C/O-For Bar/Visitor Center-only alt 137851, issued 7/17/…
Installation of new mezzanine structure, as per plans, related fire protection
add new fire alarm devices to new tour path
INSTALLING A CODE REQUIRED UL FIRE ALARM DIGITAL RADIO COMMUNICATOR FOR THE BASE BUILDING FIRE ALARM SYSTEM TO MONITOR VIA A UL 3RD PARTY, ALL FIRE ALARM SYSTEM ALARM, TROUBLES AND…
To demo and make safe misc. wiring affecting new cat walk installation. To supply and install electrical devices as per plans.
The construction of a structural steel walkway above the operations of Harpoon Brewery. Primarily structural steel and glass.Sprinkler and fire alarm.;Plans filed.
Installing new waste water drain and vent system for canning line.
Amend Permit ALT137851;Interior office fit out including non bearing drywall partitions, carpet, paint, ceilings and finishes per plans.
add 200 amp 480 Volt panel.
Wire a 1Mega Watt Generator to existing building loads during the switchboard change (see E186116). Generator in place 10/22-26/12.
Installation of a new 250kW CHP(Co-generation Plant; 8.5' height) and fan unit(3' height);to retrieve the energy from the hot waters;;Concrete pads(7'x17' &; 22'x10');outside of th…
Furnish and install power and controls for the new 250kw CHP Co-Generation Plant. Install (1) new control panel, wire field instruments, install (1) 1.5hp VFD, install feeder condu…
Furnish and install a new replacement 5000A 480V 3P 4W Switchgear for facility. The new switchgear will be center fed and equipped with 2 mains and 2 utility meter compartments. Ex…
Installation of a new 3" carbon steel gas service to new 250kW CHP skid.
Install 17 tents: (1) 40' x 200', (1) 20' x 60', (2) 40' x 60', (1) 40' x 80', (1) 30' x 60', (1) 20' x 40', (1) 20' x 30', (1) 20' x 20', (1) 15' x 30', (1) 4' x 10', (1) 9' x 30'…
Temporary electrical service and distribution for the Harpoon Brewery's Octoberfest event on September 28th and 29th of 2012.
Gas renovations.
Plumbing renvoations.
install new FCI fire alarm system with voice evacuation. new devices throughout 8000 square foot space.
run cat5e for telephones and internet
Tenant fitout of Visitors center of Harpoon Brewery. Intall outlets, lights, fire alarm.
Make safe Demo existing space of Harpoon Brewery and install temporary lighting and power.
Interior fit up of bar/visitor center including interior partions, new walls, floor, and ceiling finishes, elevator and connecting stairs, new storefront and windows, and upgrade M…
Furnish and install raceways and conductors to support (1) new 3hp motor and starter, wire solenoid valve body and associated controls. Install new feeder for spent grain control p…
Install (1) 60'x80', (1) 40'x80', (3) 10'x10', (1) 40'x200', (1) 20'x20', (1) 20'x30', (1) 4'x10', (1) 15'x30', (1) 20'x150', (1) 10'x30', (1) 10'x20' temporary tents and (2) 12'x2…
Temporary power for the Harpoonfest event at the Harpoon Brewery on may 18th and 19th of 2012.
Install (10) temporary tents for St. Patricks Day festival; (1) 40'x200', (1) 80'x140', (1) 20'x80', (1) 20'x150', (1) 9'x20', (1) 20'x20', (1) 15'x30', (1) 20'x30', (1) 4'x10', (1…
Install (17) temporary 170,00BTU heaters each with (1) 100-lbs propane tank. (9) of the heaters will have an additional 100-lbs propane tank connected. (26) 100-lbs tanks in total.…
Temporary electrical distribution services for the Harpoon Brewery's St. Patrick's Festival on March 2nd and 3rd of 2012.
Install temporary 40' x 120' tent for Harpoon Beer-B-Q. Install 11/11/11 and remove by 11/15/11.
Install (3) 170,000 BTU heaters each with (2) 100 lbs propane tanks to heat temporary tent. Install 11/11/11 and remove by 11/15/11.
Temporary electrical distribution for a Boston Food Bank fundraiser at the Harpoon Brewery on November 13th of 2011.
Seminar rm, refrigerated storage of fish, light mfgr, product design, brewing , print plant &; parking C/O-For Brewing-only;,;; alt 15103, issued 4/12/2010 *temporary certificate-e…
Temporary electrical services for the "Harpoon Oktoberfest" event at the Harpoon Brewery on September 30th and October 1st of 2011.
Install temporary tents: 18Mx60M, 6'x12', (2)40'x60', 40'x80', 30'x60', 20'x40, 9'x80', 20'x30', 20'x20', 15'x30', 4'x10', 9'x30', 9'x20', (4)9'x10'. Stages: (3) 12'x32'x30" Ramps:…
Amendment to permit #ALT15103. Add handrail on existing 1 foot to 3 foot high exterior concrete platform. Add steel catwalk to access beer processing tanks.
Install temporary tent 40'x60' for Brewers BBQ. Install: 8/4/11 Remove: 8/5/11
WIRE FOR NEW BEER KEG LINE AND LIGHTING
Temporary electrical service for Harpoon Festival at the Harpoon Brewery on May 20th and 21st of 2011. Power to be installed beginning on May 16th.