Building permit intelligence · Boston, MA
354-364 Longwood Av has 292 municipal building permits on file in Ward 4. The latest recorded activity was a electrical low voltage permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 4 mapped permits within 2 km of this address.
Description: Furnish & Install (96) LCM's & (11) VAV's.
Install light fixtures on floors 2,3,&4th floor
HVAC equipment replacement on Level 9 in existing vivarium. Includes HVAC, HVAC controls, carpentry, and electrical. Relocation of (9) or less sprinkler heads
temp fire alarm system being installed for this demo phase job. -7th floor electrical FA demolition
7th floor electrical demolition @ 360 Longwood Ave, Boston, MA 02115
4 mapped permits within 2 km, shown on the intelligence map above.
9 other addresses on Longwood Av with municipal permit records in Boston.
This address has 292 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 354-364 Longwood Av is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 354-364 Longwood Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Interior demolition of existing damaged plumbing. Installing new plumbing in place to match existing.
Nurse call low voltage additions
Floor 1 exam suite electrical demo and renovation (+1) 100A/3P 120/208V panelboard
Fire alarm demo and renovations
HVAC control wiring
LOW VOLTAGE - 360 Longwood Ave - DFCI LC9 ARF Expansion
Demolition ONLY of the existing office space on 7th floor of the Longwood Center. Scope includes demo of the existing office space: MEPs and finishes. Turning up sprinkler heads, i…
Renovation of existing space includes new finishes and MEPs.
(2) System 10 BTU, (1) FCU - Phase 1 Compressed Air
Connect CAT 6 and alarms to new RO Skid - Phase 1
Install new RO skid and remove old skid
Replace 4 commercial compressors, 2 Air dryers, and 1 water pump skid
Replacement of RO Water Skid Equipment in M1 Level (10th floor). Scope includes plumbing, HVAC, and electrical work. Relocation of less than 9 sprinkler heads.
Equipment replacement of Compressed Air & Nitrogen Equipment on M1 (10th floor). Scope of work includes plumbing, HVAC, electrical work. Sprinkler relocations of less than 9 heads
Demolition of plumbing work on floors 1-7
Demo of existing first floor finishes and MEPs. New construction includes new finishes and MEPs but permit will be applied for in long form at a later date.
Phased approval project: Includes renovation/protection work for the existing southern façade of the Longwood Center Building located at 360 Longwood Ave, Boston MA 02215 (to later…
Flat Roof Top Dimensions 1@ 7'-0" wide x 7'-0" projection Vestibule Dimensions 2 @ 9'-0" height x 7'-0" projection 1 @ 7'-0" wide x 9'-0" height Single Door Included
ASSIST WITH REMOVAL OF TAMPERS/FLOWS. WIRE IN 2 TAMPERS AND ENSURE RE-PROGRAMMING
Installation of a new FireDos foam proportioning system supply coverage to Room 234.
Renovation of lab (Actual Address is 360 Longwood Ave.)
Expansion of Animal Research Facility on 9th Floor. Existing space is offices. Scope of work includes new interior partitions, new architectural finishes (gypsum, flooring, ACT, mi…
Renovation of 8500 square feet on 9th floor to a vivarium
Renovation of 8500 square feet on 9th floor to a vivarium
Demolition of 3 sinks (Actual Address is 360 Longwood Ave.)
Demolition ONLY of part of 9th floor. Scope includes demo of the existing office space: MEPs & finishes. Turning up heads, install temporary heat loop. General demo and make safe.…
Demolition of small lab space and Install Linear heat detection cable for future renovation
Installation of linear heat detection cable for renovation , install temp A/V devices
Scope includes demolition of the existing office space. Demolition of MEP currently in place, turning up heads, installing temporary heat loop. General demo and make safe.
lighting retrofit, replace 5 fixtures and 1 switch
Research, Laboratories, Restaurant, Retail, Underground Parking;Certificate;for Research Only Space - 5th FloorALT1452310 Issued 5/18/2023 &; SF1419108 Issued 12/30/2022
Job #17526 National Development Install & wire (1) VFD.
L23046- Wire and install telecommunications devices on 5th floor
Low voltage wiring for HVAC BMS controls package and device installation.
Low voltage wiring for critical alarms and device installation
[DFCI] HVAC controls installation under lab and office space fitout for life sciences tenant. Installation of control panels and terminal unit controls. Site is Longwood Center Lev…
Dana-Farber Cancer Institute - 5th Floor -; ;Interior renovation of existing commercial 23,000 square foot lease space. Scope of work includes a new Architectural, MEP, Fire Alarm…
Renovation of a new laboratory
DFCI Longwood Center LC3 & LC8 NMR: Renovation adding BMS control devices and wiring in existing space. HVAC scope is limited to controls for (2) VAV and (3) occupancy sensors, plu…
Partial renovation of the 5th floor to labs
Partial renovation of 5th floor to labs
E23007 Electrical demolition of fifth floor office space.
Interior architectural and above ceiling MEP demolition of an existing office space back to a core and shell space. This demolition project is to prepare the space for a new lab re…
Low Voltage - LC 8 Microscopy Card Reader
Research, Laboratories, Restaurant, Retail, Underground Parking;;Certificate For RestaurantSF1381735 Issued 9/19/2022, ALT1358942 Issued 11/9/2022
Outdoor Seating for Anna's Taqueria in front of the building (5 Tables and 10 Chairs)
minor Interior renovation, flooring, tile, paint, wainscott, electrical, plumbing, fire alarm hood supression and alarm .(Outdoor seating will be on a Use of Premise permit;U491395…
Install 8 data drops to new rack at Anna Taqueria's first floor
Final Gas Connections to various equipment in a commercial kitchen.
Demolition, make safe and reinstallation of kitchen hand sink, final connections to kitchen appliances.
Dana Farber Cancer Institute - Logan Research Building LC5. Selective non structural demolition and installation of rated smoke barrier from deck to floor above and fire stop for f…
Replace existing kitchen equipment with new. Replace pendant fixtures with surface mount fixtures
Replace existing kitchen hood and Ansul system with new
Install (1) double sided internally illuminated oval sign, "Annas Taqueria" and install (2) single sided translucent faces in existing lightbox signs, "Anna's Taqueria"; BPDA Desig…
Interior makesafe and minor demo of nonstructural walls, and layout/framing ahead of ALT1358942 being issued.
L22043- Wire and install 16 telecom locations on the 8th floor.
Interior renovations to room on third floor. Includes new furniture, finishes, paint, flooring, and minor MEP cosmetic upgrades
Renovation of Admin Offices and NMR room. Renovations include finishes such as paint, carpet, millwork, flooring, and other minor changes.
Renovations to existing Microscopy Room and procedure room. This includes new specialties, finishes, Flooring, Millwork, Painting, and minor MEP finish work.
Renovation of admin and NMR office on 8th floor
Renovation to Microscopy room on 8th floor
Add 1 smoke detector on 8th floor
Renovation of small space on 3rd floor
Level B1 add (2) door holders
360 Longwood Sim Lab LC5701 Extend 208 volt 20 amp power circuit to new location 10 feet away. Install new breaker. CH-179X
Research, Laboratories, Restaurant, Retail, Underground Parking;Certificate for;Restaurant at 360 Longwood Ave with Outdoor Patio and Pickup Window.Alt1144139 Issued 8/11/21 &; SF1…
Sweetgreen -; Interior renovation for new Restaurant of 2,672 sf on Ground Floor at 360 Longwood Avenue. There will be no internal or external structural changes and tenant will us…
Fitout of Sweetgreen Restaurant Space
Renovation of existing space to Sweetgreen restaurant inside Longwood Medical Center
Renovation of existing space in longwood Medical Center to Sweetgreen restaurant
Renovation of existing space to Sweetgreen inside Longwood Medical Center
Research, Laboratories, Restaurant, Retail, Underground Parking;Certificate for the Dana Farber Cancer Institute - B1;Level LabsALT976113 issued: 8/5/19
TO BEGIN WORK UNDER ALT 1144139 WHILE IN REVIEW NO ZONING REQUIERED SWEETGREENS RESTAURANT COST ALSO REFLECTED IN ALT 1144139
Install Critical Alarms (CAMS) system to monitor Research Freezers and refrigerators to DFCI Critical Alarms monitoring System.
Job #15288 360 Longwood Ave Furnish & install centralized 20 KVA UPS for Siemens BMS panel backup power.
Low Voltage - LC 9 AED Alarm (LS-0444024)
LCB1 fit out with new Security wiring. Single office/suite space.
Dana Farber Cancer Institute updates to existing wall signage for the purpose of re branding, BPDA Approved. Loc E-22-non illuminated aluminum pan sign with acrylic logo and letter…
LCB1 fitout with new Tel/Data wiring. Single office/suite space.
Research, Laboratories, Restaurant, Retail, Underground Parking Certificate for Longwood Center Research Building 8th floor. ALT885882 issued 12/20/18 &; SF827823 issued 5/7/18;
Level B1 Lab/Office renovation at 354-364 Longwood.
Level B1 Lab/Office Renovation at 354-364 Longwood Ave. Boston MA 02215.
6th floor drylab renovation at 354-364 Longwood Ave.
DFCI - LC6 - DryLab, low voltage HVAC control wiring - AP, 197602 - work being done at #360 Longwood Avenue.
Dana Farber Cancer Institute - B1;Level -; Fit out of Laboratory support space on Level B-1. Install racks, drywall partitions, Painting, tiles, break area, MEP's, ;FF&;E. Minor re…
S19-841, connect jumpers, receptacles and plug in base feeds for office workstations @ 360 Longwood Ave .
Dana Farber Cancer Institute Longwood Center Level B-1. Begin work under ALT 976113 F/T Pending. Demolition, framing and rough work.
provide wiring for 3 environmental rooms for Dana Farber on the 8th floor
Upgrades to existing DANA FARBER CANER INSTITUTE LC-6 Office Lab Area. No chnages to egress or life safety systems, Upgrades to existing finishes FF&E. All work in full compliance…
Minor interior changes to Dana Faber LC-6 area in preperation for renovations
Longwood 6 ASI-24, Misc low voltage HVAC control wiring - NPB, 185857
Low Voltage - Door 6100A - security system - 360 Longwood
Job# 18-0046-10 360 Longwood Ave L6-Lab
8th Floor office security office and lab fitout at 354-364 Longwood Ave.
12th & 14th Floor office tel/data reno and fitout at 354-364 Longwood Ave.
8th Floor Office Tel/Data office and lab fitout at 354-364 Longwood Ave.
6th floor office and lab
6th floor deci small lighting and power
Upgrade laboratory bench mill-work, paint, tile for user.
DFCI Longwood L8, Misc low voltage HVAC control wiring - AP, 186762
Minor renovation to DFCI Room 4121 Tissue Culture Room. no changes to life safety system or egress.
Dana-Farber Cancer Institute - Longwood Center Research Bldg - 8th Floor -; Renovations of Research Laboratory space, and associated Office and support spaces.;;Work includes :; De…
Installing temp heats on floor 8. (DFCI)
Laboratory Fit-Out ***ADDRESS IS 360 LONGWOOD AVE. - SYSTEM DOESN'T GIVE THAT OPTION***
Low Voltage -350 Longwood Ave- LG-GC Access Control
Research, Laboratories, Restaurant, Retail, Underground Parking Certificate for TDFCI - Longwood Center - 6th floor ALT783758 issued 1/16/18
8th Floor Office & Lab Fitout at 354-364 Longwood Ave.
8th Floor Office and Lab Fitout at 354-364 Longwood Ave.
Begin build out of Laboratory pending Fast Track ALT885882
Research, Laboratories, Restaurant, Retail, Underground Parking Certificate For:;Office space for Research Lab and associated meeting space 9th floor - Only Alt780663 - 1/30/18 ;
Replace 4 backflow preventers.
S18-889, connect jumpers, receptacles and plug in base feeds for office workstations @ 360 Longwood Ave, 6th floor for Dana Farber.
Research, Laboratories, Restaurant,Retail,Underground Parking; Certificate for; Office and lab space -7th.fl.-Only Alt 786104 issued 1/8/18
Audio Visual Installation
Provide wiring for 3 environmental rooms at Dana Farber
Install new security devices to an existing security system on the sixth floor.
Installation of 110 Cat 6A Locations and (1) Fiber Optic Cable (D180212)
S18-700, install jumpers, receptacles and plug in base feeds for office workstations @ 360 Longwood Ave., 7th floor.
6th floor freezer alarms
Build temporary construction office and begin build out of Wet Lab as shown on ALT plans pending.
B&W Hospital 7th Floor, Misc low voltage HVAC control wiring - PAG, 185664
DANA FARBER CANCER INSTITUTE LOW VOLTAGE ELECTRICAL L6 LAB FIT OUT BACKBONE CABLING FROM NEW L6 IDF TO EXISTING L4 IDF AND EXISTING L2 MDF HORIZONTAL CABLING ON L6 LAB, 2 IDF BUILD…
7th floor
tel data raceway only and cable tray
longwood center 7th floor 220500 sq ft renovation lighting power fire alarm installation teldata and control work by others
tel data raceway only
9th floor fire alarm
office sp ace dana farber
Plumbing work associated with renovation to level 7 of Longwood center, OBI expansion.
1@600 amp off existing bus 1@ 400amp off existing bus 1@400 stanby off existing gen and bus 6th floor tent fit up of shell space for dfci lighting and power ats standby swich
Build out of the 6th floor at 360 Longwood Center. Labs and offices. Teldata raceways only.
Build out of the 6th floor at 360 Longwood Center. Labs and offices.
Laboratory Fit-out
DFCI - Longwood Center - 9th Floor - Construction of;new Office space for a Computational Research Lab and associated meeting space.; Work includes :; new drywall partitions, ACT,…
DFCI - Longwood Center - 6th Floor - Build out of;new Laboratory Space.; Work includes :; demolition of existing Lab space, construct new Lab space including new Bathrooms, Confere…
Tenant fit-up office and lab space approximately 30,000 sf LPR ;
Install temporary fire alarm on 6th Floor.
Begin work on Dana Farber Dry Laboratory on floor 9 pending Issuance of FT ALT. All fee's paid on the ALT.
Dana Farber selective demolition, layout, coring and framing of new laboratory space on floor 6 pending issuance of ALT780663 all fees and costs paid;on that permit.;
Research, Laboratoriies, Restaurant,Retail,Underground Parking doc#alt494634; Certificate for the restaurant (Clover) Longwood Center - Ground Floor ALT561676 issued: 561676
installation of lightbox in interior of Clover Food Lab. Signage parameters and design for project have been approved by BZA/BRA under PDA No. 71, certificate of consistency, dated…
Build temporary construction office on floor 6
Research, Laboratoriies, Restaurant,Retail,Underground Parking Temporary Certificate for the restaurant (Clover) Longwood Center - Ground Floor.; TCO to expire on 11/27/2017;pendin…
Demolition , renovation and construction of Dana Farber research laboratory pending ALT under review. Fee reflected on long form.
Research, Laboratories, Restaurant, Retail, Underground Parking Certificate for the Base Building, 7th floor and Suite 2 Office Space ALT684173 Issued 4/6/17 &; ALT688795 Issued 4/…
S17-775, install jumpers, receptacles and plug in base feeds for office workstations @ 360 Longwood Ave 7th floor.
2) signs 60" x 23" x 4.375" mounted inside windows. Illuminated faces reading "B.Good Food With Roots" 1) exterior round double face 18" diameter 6" deep hanging blade sign. Illumi…
Installation of 68 voice/data locations and Fiber Optics Installation (D170252)
installation of low voltage automation system at 360 Longwood Avenue, 7th Floor
7th Floor Core & Shell Modifications to Lighting and Power
7th Floor Core & Shell Modifications to Fire Alarm
7th Floor Tenant Office Fit Up Fire Alarm modifications
7th Floor Tenant Office Fit Up Temp Electrical
7th Floor Tenant Office Fit Up of Electrical Power, Lighting upgrades
Extend Core shell tenant services from core
Extend Core shell tenant services from core
BWH Cardiology Plumbing Fit-Out
Brigham &; Women Hospital; - 7th Floor: Interior renovation for tenant fit-up for Suite #2. ;
Demise floor seven to create multi-tenant occupancy and common egress corridors ;
Low Voltage - LMC- Room 3224-3229 Card Reader Add
Research, Laboratoriies, Restaurant,Retail,Underground Parking Certificate for the 9th Floor/DANA FARBER DRY LAB ALT590867 issued: 5/24/16
ASSIST WITH THE INSTALATION OF NEW NMR EQUIPTMENT IN "NMR CORE ROOM 3301" FLOOR 3, RELOCATE EXISTING X 5 SPRINKLER HEADS, NO FIRE ALARM AND MINOR FINISHES. EQUIPEMENT INSTALLED BY…
Low Voltage - Longwood Center-4th Floor Lab Card Reader Adds
Low Voltage - Longwood Center-9th Floor Dry Lab Project (Card Readers)
Install Siemens HVAC Controls - Floor 9 Dry Lab Area
Low Voltage - LC-3317 Card Reader Add
Add sink and future toilet room piping to the 9th floor
Low voltage wiring for HVAC controls and main cable install for internet connection.
Low Voltage - Door Contact
Research, Laboratories, Restaurant, Retail, Underground Parking doc#alt494634 Certificate for the VIVARIUM LAB - 9th FLOOR ATL515758 issued: 9/18/15 &; A523361 issued: 11/2/15
Renovate the FA system in the dry lab, ninth floor, DFCI.
Renovate the dry lab on the ninth floor, DFCI.
Low Voltage - Card Reader Add
DANA FARBER DRY LAB FITOUT FLOOR 9. NO CHANGES TO EGRESS NEW M/E/P/ SYTEMS. ALL WORK IN FULL COMPLIANCE WITH 780CMR,527CMR,521CMR.
Research Laboratoriies, Restaurant,Retail,Underground Parking doc#alt494634 C/O-For Research Laboratory;- 3th.fl. Only alt 497363;issued 7/29/15;
Low Voltage - Dark Room Card Reader Add
Tenant fitout for restaurant space.
Tenant fitout for restaurant space. Work to be done 360 Longwood Ave.
New Resturant
New Restaurant
Research, Laboratories, Restaurant, Retail, Underground Parking C/O-For Offices -;;5th Floor alt 494634 issued 8/7/15, A 507746 issued 9/4/15
Longwood Center - Ground Floor - Clover Food Lab Restaurant -; Interior build-out of;a Restaurant space.; Work includes :; new Kitchen, new Bathrooms, new Booths, all new millwork,…
Low Voltage - 9th Floor - Animal Research Facility - Security System
REPAIR WATER DAMAGE DRYWALL DUE TO FROZEN SPRINKLER LINE.
Electronic Security and Surveillance system and device installaion
Provide wiring for 1 environmental room Dana Farber 9th floor
Functional and spatial mock-up of clinical space including OR, NICU, CICU, Patient Rooms and misc. support space to be constructed in an existing shell-space on the 6th floor of 36…
Install wiring within office cubicles on 5th floor for Children's Hospital at 360 Longwood Ave.
Wire and install tel/data outlets on the 5th floor.
installation of 1 new electrically heated air curtain (460v/3PH) 31 amps, 24kW
Low Voltage - Card Reader
Install Building Automation System - Tenant DFCI 9th Floor Vivarium
Low Voltage Controls for Building Automation- DFCI Level 3 Lab fit out section of floor 3
LOW VOLTAGE WIRING 360 LONGWOOD AVE, DANA FARBER CANCER INSTITUTE JOB NUMBER 15-0366-10
floors 9-10-11 generator
Wire one temperature controlled environmental room
Amendment to ALT 515758-----Installation of an additional stand-by power generator for base build and viva rim laboratory support (NOT LIFE SUPPORT OR FIRE PROTECTION). All work wi…
Low Voltage - Access Control/ Card Reader Add 3rd Floor
Install tenant portion of FA System on the 9th floor.
Install electrical fitout for the ninth floor.
S1962 - Control Wiring for 10 VCV's, 10 VVE's, 1 Heat Pump, 4 CO2 Sensors, 3 FTR Valves, 1 Leak Detector, 1 Fume hudd, and the Laser Cutter Exhaust System.
S1957 - Control Wiring for 47 VAV's, 1 CV, 34 Reheat Coils, 33 FTR, 60 Exh. VAV/CV, 16 CO2 Sensors, 3 Heat Pumps, 2 FPB, 2 Cross COnnect Dampers, 6 AFMS, 2 CHW Temp Sensors, 2 HW T…
Install tempered water, non potable hot water, non potable cold water, CO2, Reverse Osmosis Deionized Water (RODI), Vaccuum, Lab Waste, lab vent and high purity Nitrogen piping and…
9th floor
Tenant fitout on the 5th floor.
Add FA for tenant fitout on the fifth floor to a base building FA System.
Installtion of two freestanding sings on sidewalk for MASCO: Sign 01: Vehicular Directional sign location on Longwood Ave. Sign 02: Pedestrian Map sign location on Brookline Ave. A…
Renovation of Animal Facility
Gas Pipe to New Boilers
Pret A Manger Install 8 Cameras. Wiring by others
Replace Indirect Water Heater/Storage Tank
Research, Laboratoriies, Restaurant, Retail, Underground Parking doc#alt377518 Certificate of Occpancy for the DANA FARBER CANCER INSTITUTE LABORATORY, FLOOR 4 ALT460075, issued: 4…
9th floor
9th floor
Longwood Center - 5th Floor - Modification of existing plumbing. 40,000 sq ft tenant office fit out on vacant floor.
Longwood Center - 5th Floor - Revisions to existing plumbing in interior workshop for imaging and printing space on the 5th floor of 360 Longwood ave.
VIVARIUM LAB - 9th FLOOR: INTERIOR FITOUT OF VIVARIUM LAB ABD ASSOCIATED OFFICES WITH MEP/FA/FP. ALL WORK WILL BE IN FULL COMPLIANCE WITH 780CMR,527CMR,521CMR. LPR
360 Longwood Ave, Bond Brothers for Dave S
Research, Laboratoriies, Restaurant, Retail, Underground parking and Restaurant with take out.; Certificate of Occuancy for;Restaurant with Take Out; SF490609, issued: 7/2/15 &; AL…
INSTALL 6 SIGNS PER SUBMITTED DRAWINGS FOR PRET A MANGER
9th floor
fitout of 3rd floor
fit out of 3rd floor.
Longwood Center - 5th Floor -; Interior fitout workshop for Imaging and Printing space on the 5th floor of 360 Longwood ave. Work includes installing new walls, ceilings, and all f…
Low Voltage - 2nd Floor Card Reader
CONNECT 5 SIGNS TO EXISTING ELECTRICAL FEEDS
Research, Laboratoriies, Restaurant, Retail,Underground Parking and Restaurant w/take-out; Certificate of Occupancy for the restaurant (b. good) ALT452122, issued: 5/4/15 ;
LOW VOLTAGE WIRING AT 360 LONGWOOD AVE - DANA FARBER CANCER INSTITUTE UNABLE TO SELECT 360 AS AN ADDRESS - PLEASE VALIDATE JOB NUMBER 15-0167-10
Longwood Center - 5th Floor -; 40,000 sq ft Tenant Office fit out on vacant floor.;;Work to include :; new metal stud partitions, drywall, ACT, all new carpet and tile and all new…
884028 - BCH Longwood 5th Floor Enabling - Installing the waste piping for future fixtures.
REVOVATIONS TO LABORATORY SPACE ON FLOOR 3 DANA FARBER CANCER INSTITUTE LONGWOOD RESEARCH BUILDING AS PER PLANS. SPRINKLER and FA. ALL WORK WILL BE IN FULL COMPLIANCE WITH 780CMR,5…
Pret a Manger -; Change of Occupancy to include a new Restaurant for 65 indoor seating and 34 outdoor seasonal seats and Takeout ( 36A ) on Ground Floor. Build out of existing empt…
Pret A Manger new speaker strobes, strobe only devices, pull stations and smokes
Pret A Manger 1st Floor Retail. New power, lighting, panel boards and service feeders.
1st Floor Reno
Fire Alarm adds for tenant fit out.
Low voltage work associated with tenant fit up - B Good Restaurant.
Interior construction of a coffee shop/restaurant Pret A Manger, in new food court of the Longwood Center. ALT426604 to follow reflecting full cost. No structural, storefront, life…
Low Voltage Access Control
B-Good Restaurant Longwood Ave, Misc. Low Voltage HVAC Control Wiring - PAG 152382
Low Voltage - Security System Install
Install (1) 26"x12" double sided spot lit blade sign with aluminum mounting arms and (2) 24"x50" Single sided lit signs to be on inside of space facing out at windows. "b.good"
Tenant Fit Bu - B Good Restaurant. Heat, Light, Power and Fire Alarm
4th floor
4th floor
4th floor
INSTALLATION OF 7 LABORATORY SINKS AND 1 SHOWER FOR THE RENOVATION AT THE CANCER RESEARCH CENTER PER THE ENGINEERED DRAWINGS
Gas to Kitchen Equipment
Plumbing to new restaurant fixtures
b.good Restaurant - Change of Occupancy to include a new Ground Floor Restaurant with Takeout Use.; There will be 46 indoor seats.; Restaurant;Build out of the existing space as pe…
Research, Laboratoriies ,Restaurant, Retail, Underground Parking and Restaurant with seating and take out Certificate of; Occupancy for Caffe Nero SF446285, issued: 2/6/15 &; ALT43…
DANA FARBER CANCER INSTITUTE LABORATORY RENOVATIONS FLOOR 4, NEW BENCHS, FLOORING, HVAC, PLUMBING, ELECTRICAL, CEILINGS, FLOORING, FIRE ALARM, SPRINKLER. ALL WORK WILL BE IN FULL C…
BEGIN LAYOUT AND WALLS FOR DANA FARBER LEVEL 4 LABORATORY WORK UNDER ALT 460075 UNDER REVIEW. ALL FEE'S PAIN UNDER ALT PERMIT.
Cafe Nero 360 Longwood - Misc. Low Voltage HVAC Control Wiring AP152018
Caffe Nero - Change of Occupancy to include a new Restaurant for 34 indoor seating and Takeout ( 36A ) on Ground Floor. Build out of existing empty space as per plans.
Install all new fixtures
This is a space for Caffe Nero on the first floor of the building. We will be installing a new 400 amp 277/480 volt 3 phase 4 wire service. There will be two 100 amp 120/208 volt p…
Installation of fire alarm system in Caffe Nero space on first floor of the building. We will be installing three speaker/strobe units, one strobe only and one pull station.
Interior construction of a coffee shop, Caffe Nero, in new food court of the Longwood Center. ALT435892 to follow with full remaining cost reflected on the ALT of $450,000. No stru…
360 Longwood Electrical Maintenance
Install wiring within office cubicles on 2nd, 3rd and 4th floors for Dana Farber cancer Center at 360 Longwood Ave.
Legal Occupancy:; Research, Laboratoires, Restaurant , Retail, Underground parking C/O-For; Research Building;-;Floors B1 - 4;-;floors.New;Offices, Conference rooms, Laboratory Spa…
1 st floor nstar shutdown for warrenty work
Research, Laboratory, Clinic, Offices, Restaurant, Retail and Underground Parking Garage C/O-For Base Bldg/Core;&; Shell , Common Areas, Underground Parking Garage- ;Bsmt thru 12th…
Install letter set signs to existing canopies (3): one over front entrance, one on Brookline Ave elev, one on Pilgrim Rd elev. To read: "Longwood Center". works to be done by licen…
Install wiring for 7 environmental clean rooms
S14-166, Card access wiring for 47 doors at the Dana Farber Longwood Center Research project.
14-0023-10 DANA FARBER 354-364 LONGWOOD AVE
Installation of a Siemens Buildind Automation System on all floors for Core & Shell
Installation of a Siemens Building Automation System on Floor 2,3,4 for Dana Farber
Longwood Center Shell & Core floors B3 to 2nd floor. Installing 50 Devices Tel/Data
Longwood Center Shell & Core on B3 to Penthouse Level. Installing 130 Devices Security
B1-M2 AND ROOF MEDICAL RESEARCH
B1-M2 AND ROOF
B1-M2 AND ROOF
B1-M2 AND ROOF
Plumbing laboratory Fit-out
DFCI - Longwood Center Research Building;-; Lab fitout on Floors B1 - 4;-; Tenant infill of several floors and partial floors.; Work to include;new drywall for all new Offices, Con…
remodel electrical; new 100 amp feeder
re rough plumbing
renovate sushi bar new equipment ,electrical ,plumbling,tile ,paint
Preform gas fitting for research laboratories.
Preform plumbing work for research laboratories. Building has a total of 14 floors (3 underground).
INSTALL NEW COUNTERS AND REFRIGERATION WORK AT EXISTING SUSHI ARIGATO TAKE OUT
1 st floor
new medical building
Erect a new 11-story building (9-stories of occupied space with 2-stories mechanical) plus penthouse for Research, Laboratory, Clinic, Offices, Restaurant, Retail and Underground P…