50 6TH St S
Building permit intelligence · Minneapolis, MN
50 6TH St S has 94 municipal building permits on file in Downtown West. The latest recorded activity was a mechanical permit dated Jun 30, 2026. Permits at this address represent $33M in total declared construction value. PropertyLabs also identified 7 mapped permits within 500 m of this address.
- At this address
- 94
- Nearby (500 m)
- 7
- Latest activity
- Jun 30, 2026
- Total permitted value
- $33M
Permit activity timeline
- MechanicalIssuedProject value hiddenJun 30, 2026
Relocate the existing low-pressure ductwork from the existing FVAV and VAVs. Add eggcrate diffusers to the offices. There is no known low-pressure steam work, as confirmed during t…
- PlumbingIssuedProject value hiddenJun 17, 2026
Run new waste, vent, and water for new break room sink with water heater
- CommercialIssuedProject value hiddenJun 8, 2026
Office Remodel - Suite 1300 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 46 sprinklered: yes architec…
- MechanicalClosedProject value hiddenApr 24, 2026
relocate GRD's .#1390
- PlumbingClosedProject value hiddenMar 20, 2026
Provide and install new sink, water connections to dishwasher and refrigerator. Provide and install new distribution piping to new fixtures - Cast iron waste and vent and soldere…
- CommercialClosedProject value hiddenMar 6, 2026
Tenant Improvement of newly demised office -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant load: 31 sprin…
- CommercialIssuedProject value hiddenFeb 11, 2026
Remodel
- CommercialIssuedProject value hiddenJan 22, 2026
Remodel
- CommercialIssuedProject value hiddenDec 9, 2025
LOBBY RENOVATION AT LEVEL 1 AND LEVEL 2. STRUCTURAL WORK IS NOT INCLUDED WITH THIS PERMIT. (JJL) *********A STEEL STRUCTURAL FRAME IS REQUIRED TO SUPPORT MONITORS/DISPLAYS. THIS WI…
- PlumbingClosedProject value hiddenMay 8, 2025
Install 1 storm and 1 overflow drain and install flow meter
- CommercialClosedProject value hiddenMay 5, 2025
LEVEL 22. INSET TERRACE. (JJL) *******************REVISION AFTER ISSUANCE. - NEW FIRE PROOFING APPROVED MATERIALS (K-13) APPROVED 8/8/25 (JJL) certificate of occupancy required: no…
- CommercialClosedProject value hiddenMay 5, 2025
certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 214 sprinklered: yes Tenant: NA Floor(s): 1 architect:…
- MechanicalClosedProject value hiddenMay 2, 2025
Rework existing HVAC for new tenant layout. Provide new diffusers and grilles to match existing at new rooms.
- PlumbingClosedProject value hiddenApr 24, 2025
FOR SUITE 1413 RESTROOMS - PULL AND RESET WITH NEW FIXTURES. MOVE HANDICAP TOILET IN MENS RESTROOM. All plumbing shall be installed in accordance with the 2020 Minnesota State Plum…
- MechanicalClosedProject value hiddenApr 1, 2025
HVAC system, using existing building air handling units and installing fan powered and VAV boxes, exhaust fan, heat pump unit, GRDs and all associated ductwork per approved plans.
- PlumbingClosedProject value hiddenMar 21, 2025
22ND FLOOR - RESTROOM FIXTURES - Demo Fixtures and modify plumbing in order to install 12 water closets, 3 urinals, 8 lavatories and 2 water heaters All plumbing shall be installed…
- PlumbingClosedProject value hiddenMar 17, 2025
5 sinks, 5 instant hot water heaters for sinks
- CommercialClosedProject value hiddenMar 12, 2025
T/I SUITE 2300 const type: IA occupancy: B 2020 MSBC sprinklered: yes architect: 59613 - Santema, Jolene Lorraine @ BDH
- PlumbingClosedProject value hiddenMar 10, 2025
21ST FLOOR - RESTROOM FIXTURES - Demo Fixtures and modify plumbing in order to install 12 water closets, 3 urinals, 8 lavatories and 2 water heaters All plumbing shall be installed…
- CommercialClosedProject value hiddenMar 5, 2025
remodel bathrooms on 21st floor.
- CommercialClosedProject value hiddenMar 5, 2025
remodel bathrooms, corridor, and elevator lobby on 22nd floor.
- CommercialClosedProject value hiddenFeb 14, 2025
WOLD ARCHITECTS. INTERIOR REMODEL LEVEL 21 and 22. LIFT ADDED WITH NEW STAIRS. LOBBY DOORS ON LEVEL 21 TO MEET 2024 IBC PER 1010.2.14. CAIM ATTACHED. (JJL) certificate of occupancy…
- PlumbingClosedProject value hiddenFeb 6, 2025
Demo as needed and install waste, vent and water including 4 coffee waters. Install 7 sinks & 7 instant water heaters, 3 toilets, 3 lavs & 3 instant water heaters.
- CommercialClosedProject value hiddenJan 14, 2025
Demolition and shell prep for future tenant improvement - 22nd Floor certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC oc…
- MechanicalClosedProject value hiddenOct 10, 2024
- CommercialClosedProject value hiddenSep 26, 2024
SUITE #2250. DEMO ONLY. (JJL) certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 53 sprinklered: yes Tenan…
- CommercialClosedProject value hiddenSep 5, 2024
REMODEL "DATA ROOM" 26TH FLOOR const type: IA occupancy: B 2020 MSBC architect: 23558 - Walz, Jeffrey Lee
- MechanicalClosedProject value hiddenAug 5, 2024
REWORK EXISTING DUCTWORK AND DIFFUSERS
- PlumbingCancelledProject value hiddenAug 5, 2024
STE 1390/ NEW SINK WITH WASTE, VENT, CW & HW PIPING
- PlumbingClosedProject value hiddenJul 29, 2024
STE 1390/ SINK w/WASTE, VENT, CW & HW PIPING
- CommercialClosedProject value hiddenJul 2, 2024
REMODEL OFFICE - SUITE 1390 const type: IA occupancy: B 2020 MSBC architect: 11902 - Norback, David Charles
- CommercialClosedProject value hiddenJul 2, 2024
REMODEL RESTROOMS const type: IA occupancy: B 2020 MSBC sprinklered: YES architect: 17408 - - Hustad, Mary B
- PlumbingClosedProject value hiddenJun 24, 2024
REMOVE EXISTING RESTROOM FIXTURES & REMODEL PLUMBING FOR NEW FIXTURE LAYOUT. INSTALL NEW PLUMBING FIXTURES.
- PlumbingClosedProject value hiddenJun 7, 2024
crawford merz #1460 reset new sink add coffee line
- CommercialClosedProject value hiddenMay 9, 2024
SUITE 1460 TENANT IMRPOVEMENTS. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant load: 28 sprinklered: ye…
- PlumbingClosedProject value hiddenNov 2, 2023
food/SK coffee-Plumbing remodel project
- CommercialClosedProject value hiddenOct 3, 2023
Remodel existing coffee shop into a different coffee shop - Suite 290 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC o…
- CommercialClosedProject value hiddenSep 19, 2023
SUITE 2100. DEMO ON 21ST FLOOR. NO CONSTRUCTION PERMITTED. (JJL) ARCHITECT: JILL MARIE WINKLER #46846
- MechanicalClosedProject value hiddenAug 4, 2023
HVAC system installing new smoke removal system in 20th floor due to removal of 21st floor, relocating existing VAV boxes, GRDs and all associated ductwork. Refer to attached drawi…
- MechanicalClosedProject value hiddenApr 3, 2023
Demo 4 CRAC units and adding new fan powered box GRDs and all associated ductwork. Refer to attached drawings.
- PlumbingClosedProject value hiddenMar 6, 2023
Suite 1500 plumbing for new mothers room
- CommercialClosedProject value hiddenFeb 7, 2023
Tenant Remodel - Suite #1500 certificate of occupancy required: no special inspections required: yes const type: 1A occupancy: B 2020 MSBC sprinklered: yes Tenant: Dorsey & Whitney…
- PlumbingClosedProject value hiddenOct 27, 2022
restroom remodel
- CommercialClosedProject value hiddenOct 6, 2022
9TH FLOOR - REMODEL COMMONS RESTROOMS certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinkl…
- PlumbingClosedProject value hiddenMay 12, 2022
dishwasher
- CommercialClosedProject value hiddenMay 9, 2022
INSTALLATION OF ROOF ANCHORS (MAA) ENGR: FRANK KRECH 57530
- PlumbingClosedProject value hiddenJan 13, 2022
Remodel of core restrooms - 13th and 14th floors
- MechanicalClosedProject value hiddenMar 8, 2021
Replacement of 4 linear diffusers.
- CommercialClosedProject value hiddenMar 1, 2021
INTERIOR REMODEL, ADD LIFT AT SUITE 100 (MAA) certificate of occupancy required: NO const type: 1A occupancy: B,M 2020 MSBC occupant load: 27 sprinklered: yes elevator review __YES…
- MechanicalClosedProject value hiddenFeb 4, 2021
replacement of 7 diffusers.
- CommercialClosedProject value hiddenJan 14, 2021
Lobby Renovations - 1st & 2nd Floors certificate of occupancy required: no ***** special inspections required: no***** const type: 1A ***occupancy: B ***2020 MSBC***** sprinklered:…
- CommercialClosedProject value hiddenJan 11, 2021
SECOND FLOOR SUITE 260. DEMOLITION OF RETAIL SPACE. CUT OPENINGS INTO EXISTING SPACE. NEW WALL AND FLOOR FINISHES. NEW CABINETS. ARCHITECT: SCOTT BLANK #51092 - SEH ENGINEER: KRIST…
- CommercialClosedProject value hiddenMay 5, 2020
Elevator Lobby Door Replacement - 10th Floor Doors shall meet the requirements for a smoke and draft control door assembly tested in accordance with UL 1784. Installation of smoke…
- PlumbingClosedProject value hiddenJan 28, 2020
FOR SUITE 1410 - WATER HEATER AND BREAKROOM SINK
- MechanicalClosedProject value hiddenJan 21, 2020
Provide and install new GRDs for open ceiling plan, air balance
- CommercialClosedProject value hiddenDec 16, 2019
buildout spec office suite on 14th floor - suite 1410. sck***** approx. 2300 sq ft*****
- PlumbingClosedProject value hiddenNov 5, 2019
- CommercialClosedProject value hiddenOct 23, 2019
INTERIOR BUILDOUT OF APPROX 1900 SQ FT - SUITE 1370. SCK**** certificate of occupancy required: no ***** const type: 1A ***occupancy: B ***2015 MSBC***** sprinklered: yes ***** arc…
- MechanicalClosedProject value hiddenSep 11, 2019
INSTALL 2 NEW CRAC UNITS SERVING NEW UPS DATA ROOM PER ENG. DRAWINGS / 19TH FLOOR
- CommercialClosedProject value hiddenAug 5, 2019
REMODEL SERVER ROOM OF EXISTNG OFFICE TENANT SPACE IN MIXED-USED COMMERCIAL BUILDING. AAJ#1. certificate of occupancy required: NO mechanical plans required for certificate of occu…
- MechanicalClosedProject value hiddenApr 11, 2019
REWORK DUCTS, DIFFUSERS & RETURNS ONLY / NO NEW EQUIPMENT / FOR SUITE #1418
- CommercialClosedProject value hiddenMar 20, 2019
SUITE 1418, UPLAND REAL ESTATE. EXISTING BUSINESS EXPANDING. ADDING NEW OFFICES, AND MISC WALLS. ALL WALLS NON-COMBUSTIBLE CONSTRUCTION. ADJUST SPRINKLERS AS NECESSARY. (JJL)******…
- MechanicalClosedProject value hiddenFeb 22, 2019
REWORK DUCTS FOR EXISTING OFFICE SPACE / NO NEW EQUIPMENT
- CommercialClosedProject value hiddenJan 23, 2019
suite 1405 remodel. EXISTING BUSINESS SPACE BEING REMODELED. NON COMBUSTIBLE CONSTRUCTION. NO STRUCTURAL WORK. (JJL) certificate of occupancy required: no mechanical plans required…
- MechanicalClosedProject value hiddenDec 24, 2018
12TH FLOOR VAV AND ALTERATIONS PER PLANS / 373 CFM OUTSIDE AIR REQUIRED FOR VENTILATION
- CommercialClosedProject value hiddenDec 3, 2018
APPROX 3,380 SF OFFICE REMODEL REMOVING PORTION OF WALL TO JOIN TO EXISTING TENANT SPACE SUITE 1200 (JAG) certificate of occupancy required: no mechanical plans required for certif…
- PlumbingClosedProject value hiddenNov 27, 2018
12th floor breakroom sink with water heater
- MechanicalClosedProject value hiddenNov 1, 2018
22ND FLOOR - REWORK EXISTING HVAC - NO NEW EQUIPMENT
- MechanicalClosedProject value hiddenSep 19, 2018
Changing one 1.5 Ton Liebert Mini Mate Unit for data closet. Verify the unit meet the minimum efficiency of 13 SEER.
- PlumbingClosedProject value hiddenSep 11, 2018
FOR 22ND FLOOR WELLNESS ROOM - SINK AND ELECTRIC ON-DEMAND WATER HEATER
- CommercialClosedProject value hiddenSep 4, 2018
SELECT DEMO AND REMODEL TO APPROX 9,000 S.F AT 22ND FLOOR FOR OFFICE EXPANSION. (DMH#1) FINISH FOR SMALL OFFICES AND SMALL CONFERENCE ROOM. PROVIDE NEW ELEVATOR LOBBY DOORS FOR EGR…
- CommercialClosedProject value hiddenAug 10, 2018
Prelim Demo for Tenant Expansion - All Existing Fire Separations to be Maintained certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B…
- MechanicalClosedProject value hiddenMay 31, 2018
suite 1400 - rework new ductwork and diffusers per plans
- PlumbingClosedProject value hiddenMay 8, 2018
FOR SUITE 1400 - RELOCATE BREAKROOM SINK AND INSTALL POINT OF USE WATER HEATER(ELECTRIC)
- MechanicalClosedProject value hiddenMay 3, 2018
SUITE 2350 - REWORK DIFFUSERS AND DUCTWORK TO ACCOMODATE REMODEL
- CommercialClosedProject value hiddenMay 1, 2018
REMODEL TO 11,305 SQ.FT OFFICE SPACE, SUITE #2350. TWO TENANTS ON FLOOR. PREVIOUS DEMO PERMIT ISSUED. (DMH#1) OPEN & SMALL OFFICES AND CONFERENCE ROOMS. UPDATE ELEVATOR LOBBY DOORS…
- CommercialClosedProject value hiddenApr 25, 2018
REMODEL SUITE # 1400 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: CIBC Floor(s): 14 archite…
- PlumbingClosedProject value hiddenApr 19, 2018
SINK/DISHWASHER/ELEC WATER HEATER
- MechanicalClosedProject value hiddenApr 13, 2018
new vav's ducts and diffusers for 11th floor
- CommercialClosedProject value hiddenApr 2, 2018
SELECT INTERIOR DEMO ONLY TO APPROX HALF OF 23RD FLOOR FOR FUTURE OFFICE REMODEL/EXPANSION. (DMH#1) Const type: 1-A Occupancy: B 2015 MSBC sprinklered: YES Tenant: WM AGILE Floor(s…
- PlumbingClosedProject value hiddenMar 23, 2018
FLOOR #11 BASIN 2 FLOOR DRAINS ELEC WATER HEATER 2 SINKS URINAL TOILET WATER DISPENSER DISHWASHER COFFEE MAKER
- CommercialClosedProject value hiddenMar 8, 2018
FULL FLOOR OFFICE SUITE REFRESH NOT INVOLVING CORE AT APPROX 31,689 SF 11TH FLOOR (JAG) certificate of occupancy required: no special inspections required: no const type: 1-A occup…
- CommercialClosedProject value hiddenNov 20, 2017
DECOMMISSION FIRE SHUTTERS AND BUILD WALLS AT RECEPTION AREA. CLOSELY SPACED SPRINKLERS AND DRAFT CURTAIN REQUIRED AT FLOOR OPENING TO 28TH FLOOR.
- PlumbingClosedProject value hiddenOct 10, 2017
FOR 8TH FLOOR BREAKROOM - SINK, INSTANT HOT WATER HEATER AND FLOOR DRAIN FOR ICE MACHINE
- MechanicalClosedProject value hiddenMar 29, 2017
DELOITE (FLOORS 27-29) - HVAC FOR REMODEL-RELOCATE SUPPLY & RETURNS, REPLACE 2 A/C UNITS AND RELOCATE PIPING
- CommercialClosedProject value hiddenMar 23, 2017
INTERIOR REMODEL OF FLOORS 22,24,25,26 certificate of occupancy required no special inspections required yes PENETRATIONS const type: 1A occupancy: B 2015 MSBC occupant load: FLOOR…
- PlumbingClosedProject value hiddenMar 14, 2017
Replace 22 fixtures on floors 22, 24, 25, and 26 - Food flag
- MechanicalClosedProject value hiddenMar 8, 2017
FLOORS 22 - 26/ HVAC ALTS FOR NEW FLOOR PLANS INVOLVING NEW FPVAVS, VAVS FIRE DAMERS, DUCTWORK HEATPUMPS AND CONNECTION TO CORE WATER
- CommercialClosedProject value hiddenJan 27, 2017
interior remodel B-R/R BUSINESS OCCUPANCY REMODEL OR REPAIR INTERIOR REMODEL OF 27-29TH FLOORS. STAIR INFILL DONE UNDER BIRE 3105641. ELEVATOR LOBBIES TO HAVE MEANS OF EGRESS AT AL…
- MechanicalClosedProject value hiddenJan 9, 2017
9TH FLOOR/HINES AMENITIES CENTER -VENTILATION WORK INCLUDES - ADD 3 NEW VAV ZONES, RELOCATE SUPPLIES AND RETURN GRILLES 9TH FLOOR/HINES AMENITIES CENTER -VENTILATION WORK INCLUDES…
- MechanicalClosedProject value hiddenJan 9, 2017
9TH FLOOR/ADVANCED CAPITAL(TENANT -WORK INCLUDES - REZONE EXISTING SYSTEMS, RELOCATE SUPPLY & RETURNVENTILATION 9TH FLOOR/ADVANCED CAPITAL(TENANT -WORK INCLUDES - REZONE EXISTING S…
- CommercialClosedProject value hiddenJan 5, 2017
demo NON-STRUCTURAL INTERIOR DEMO AT FLOORS 27-29. ADDITIONALS PLANS, PERMITS AND APPROVALS REQUIRED FOR REMODELING AND FINISHES. CERTIFICATE OF OCCUPANCY REQUIRED: NO CONST TYPE:…
- PlumbingClosedProject value hiddenDec 30, 2016
(7) PLUMBING FIXTURES- FLOORS 27,28 & 29 (7) PLUMBING FIXTURES- FLOORS 27,28 & 29
- PlumbingClosedProject value hiddenDec 8, 2016
27 fixtures for tenant build out 9th floor 27 fixtures for tenant build out 9th floor
Development activity near 50 6TH St S
7 mapped permits within 500 m, shown on the intelligence map above.
- 80 8TH St S259 m away
Commercial · Jul 16, 2026
- 80 8TH St S259 m away
Mechanical · Jul 15, 2026
- 120 6TH St S266 m away
Plumbing · Feb 11, 2026
- 365 Nicollet Mall272 m away
Plumbing · Jul 15, 2026
- 21 3RD St N358 m away
Plumbing · Jul 10, 2026
- 121 Washington Ave S #1817454 m away
Mechanical · Jul 10, 2026
- 215 8TH St S491 m away
Mechanical · Jul 15, 2026
50 6TH St S in the Minneapolis permit market
This address has 94 permit records in PropertyLabs' public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
- City address-linked rows
- 398,514
- City, trailing 90 days
- 7,714
- City, trailing 30 days
- 2,522
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 20, 2026.
Permit questions about 50 6TH St S
- Are there building permits at this address?
- 50 6TH St S has 94 municipal building permits on record, with the latest activity dated Jun 30, 2026.
- What construction activity is nearby?
- 7 mapped permits were found within 500 m of 50 6TH St S.
- What is the declared permit value?
- Permits recorded at 50 6TH St S represent $33M in total declared construction value.
About this address record
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 50 6TH St S is dated Jun 30, 2026. Municipal records can be corrected or updated after publication.
Sources and data notes
- Published by Minneapolis, MN via Minneapolis Open Data.
- Municipal sources remain authoritative for permit status and details.
- Declared values may be applicant-reported and are not independently verified.
- Permit issuance does not confirm that construction has started.
- Records may be delayed, revised, or incomplete relative to the municipal source.
- Spot an error? Contact us with a correction.
Contractors and applicants associated with these permits
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 50 6TH St S in the PropertyLabs platform, along with alerts when new permits are filed at this address.