Permit history for 80 8TH St S
- CommercialIssuedProject value hiddenJul 16, 2026
Tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 111 sprinklered: yes Tenant: Si…
- MechanicalIssuedProject value hiddenJul 15, 2026
HVAC alterations include modifying the existing distribution system through the current air handling units, reusing existing VAV boxes and adding two new VAV boxes to suit the new…
- PlumbingIssuedProject value hiddenJun 15, 2026
Install Waste, Vent, & Water for (1) Break Room Sink, (1) Water Heater, (1) Dishwasher, (1) water dispenser, & (1) coffee
- CommercialIssuedProject value hiddenJun 9, 2026
office alterations on 33rd floor. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes architect: hustad
- MechanicalClosedProject value hiddenMay 29, 2026
Replace 7 diffusers and add 1 diffuser. Level 30 Madia Law. BLDG1181727
- CommercialIssuedProject value hiddenMay 12, 2026
Remodel portion of office suite -ACW certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes Tenant: CARLTON F…
- CommercialClosedProject value hiddenMay 12, 2026
T/I SUITE 3075 const type: IA occupancy: B 2020 MSBC occupant load: 39 architect: 17408 - Hustad, Mary B
- CommercialIssuedProject value hiddenApr 3, 2026
36th floor white box demo and remodel bathrooms. separate permits required for buildout of tenant space(s) certificate of occupancy required: no const type: 1a occupancy: b 2020 MS…
- MechanicalClosedProject value hiddenApr 1, 2026
Relocate one diffuser. Add 3 diffusers and seven RA grilles. Relocate diffusers and add R.A. grill in rooms 2245, 22050 B and 22050 C. R.A grills in Rooms 2245, 2249, 2250, and 225…
- MechanicalIssuedProject value hiddenMar 30, 2026
Installing new ductwork for main distribution and two VAV boxes per approved plans.
- CommercialIssuedProject value hiddenMar 23, 2026
Remodel portion of office space -ACW certificate of occupancy required: no special inspections required: no const type: IA 2020 MSBC Tenant: Taft Floor(s): 1 architect: Mary Hustad
- CommercialClosedProject value hiddenMar 6, 2026
Suite #3435 interior improvements certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 63 sprinklered: no Ten…
- CommercialClosedProject value hiddenDec 23, 2025
REMOVE INTERNAL STAIRCASE. INFILL FLOOR. (JJL) certificate of occupancy required: no special inspections required: yes AET const type: IA occupancy: B 2020 MSBC occupant load: 32ND…
- MechanicalClosedProject value hiddenDec 18, 2025
Suite 1100. rework supply branch ducts and diffusers for office remodel.
- PlumbingClosedProject value hiddenNov 20, 2025
replace breakroom sink, install coffee maker,#1100
- PlumbingClosedProject value hiddenNov 19, 2025
New sinks - Perkins & will Replace existing sink with new sink Use existing hot water source Install beverage faucet at sink
- MechanicalClosedProject value hiddenNov 13, 2025
HVAC alterations adding one VAV boxe to suit the new floor layout, GRDs, and all associated ductwork per approved plans.
- CommercialClosedProject value hiddenNov 5, 2025
office remodel - suite 1600. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes
- CommercialClosedProject value hiddenOct 30, 2025
#300. INTERIOR REMODEL. (JJL) certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 77 sprinklered: yes Tenan…
- CommercialClosedProject value hiddenOct 21, 2025
Tenant Improvement - North Half of 11th Floor, Suite 1100 - Zimmerman Reed certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 M…
- MechanicalClosedProject value hiddenOct 15, 2025
BLDG1148619 No drawings. I spoke with Pat (project manager for modern). He told me their work was only for replacing the diffusers above the teller area, with new. I was told exist…
- PlumbingIssuedProject value hiddenSep 25, 2025
IDS Center-16th Floor break room-Sink, dishwasher, ice maker
- MechanicalClosedProject value hiddenSep 18, 2025
HVAC alterations include modifying the existing distribution system through the current air handling unit, adding VAV boxes, one water source heat pump to suit the new floor layout…
- PlumbingClosedProject value hiddenSep 12, 2025
Tenant build out of vacant space on 43rd floor. Break room and mother's room.
- CommercialClosedProject value hiddenSep 5, 2025
interior remodel of the 43rd floor of the IDS center. Scope includes Finishes, Mechanical, Electrical, and Plumbing for new floor plan. We are currently soliciting budgets from sub…
- PlumbingClosedProject value hiddenSep 5, 2025
Demo one sink, reinstall new at existing rough in
- PlumbingClosedProject value hiddenAug 26, 2025
Install dishwasher - Suite 3950
- MechanicalClosedProject value hiddenJun 20, 2025
Installing GRDs and all associated ductwork per approved plans.
- MechanicalClosedProject value hiddenJun 5, 2025
Modify distribution on (3) existing VAVs. Provide all new GRDs including(12) diffusers and (6) RAGs.
- CommercialClosedProject value hiddenJun 4, 2025
T/I - 13TH FLOOR const type: IA occupancy: B 2020 MSBC occupant load: 246 architect: 23558 - Walz, Jeffrey Lee @ LITTLER
- PlumbingClosedProject value hiddenJun 2, 2025
Replace Dishwasher
- CommercialClosedProject value hiddenMay 23, 2025
REMODEL SUITE 3850 & 3860 - "EXPANSION OF A TENANT SUITE INTO AN AJOINING VACANT SUITE" const type: IA occupancy: B 2020 MSBC architect: 17408 - Hustad, Mary B @ NELSON
- CommercialClosedProject value hiddenMay 23, 2025
Remodel US Bank Skyway Level certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 46 sprinklered: yes 20% acc…
- PlumbingClosedProject value hiddenFeb 18, 2025
dishwasher #300
- MechanicalClosedProject value hiddenFeb 13, 2025
Hydronic piping for new AHU, VAV and FCU installations on Skyway Level for Associated Bank per approved plans
- PlumbingClosedProject value hiddenFeb 11, 2025
FOR SKYWAY/ASSOCIATED BANK - PLUMBING FIXTURES - Buildout of vacant space on skyway level for Associated Bank. New Restrooms, janitor closet and break room
- CommercialClosedProject value hiddenFeb 10, 2025
full interior build out certificate of occupancy required: yes. Changing M to B const type: 1-A occupancy: B 2020 MSBC occupant load: 95 sprinklered: yes Tenant: Associated Bank Fl…
- MechanicalClosedProject value hiddenJan 23, 2025
Installing new air handling unit, 13 VAV boxes, exhaust fans, GRDs and all associated ductwork per approved plans.
- CommercialClosedProject value hiddenDec 2, 2024
T/I - REMODEL SUITE 281 const type: IB occupancy: B 2020 MSBC sac: __2.39 charges __2.39 credits = __0.00 net met council letter dated __11/14/24 architect: 58155 - Coats, Jason Le…
- PlumbingClosedProject value hiddenOct 10, 2024
New single user restroom on 35th floor.
- CommercialClosedProject value hiddenSep 30, 2024
35TH FLOOR. INTERIOR RENOVATION OF BANK OF AMERICA OFFICE SPACE. NO CHANGE IN USE OR STRUCTURAL CHANGES. (JJL) certificate of occupancy required: no special inspections required: n…
- MechanicalClosedProject value hiddenSep 10, 2024
REPLACE CHILLER
- PlumbingClosedProject value hiddenSep 9, 2024
Restroom remodel - Install 7 new lavatory fixtures, 2 new instant water heaters, relocate 2 toilets
- CommercialClosedProject value hiddenJul 8, 2024
T/I REMODEL const type: IA occupancy: B 2020 MSBC sprinklered: yes & no architect: 17408 - Hustad, Mary B
- CommercialClosedProject value hiddenJul 2, 2024
INTERIOR IMPROVEMENTS AT 30TH FLOOR CORRIDOR. NO CHANGE TO EXITING (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSB…
- MechanicalClosedProject value hiddenMar 22, 2024
Installing new exhaust run to restroom and tying to existing system.
- PlumbingClosedProject value hiddenJan 24, 2024
SUITE 240: NEW UNISEX RESTROOM AND BREAKROOM SINK
- CommercialClosedProject value hiddenJan 16, 2024
REMODEL "BREAK AREA", NEW "RESTROOM", NEW "WELLNESS ROOM" SKYWAY LEVEL OF IDS const type: IA occupancy: B 2020 MSBC architect: Skibell, Susan L. - 55667 engineer: SAC (0 charges) 1…
- MechanicalClosedProject value hiddenDec 14, 2023
Suite 1900-FWHT. 2 new VAV systems, add transfer ducts, relocate/modify 6 existing VAV's,1 new exhaust fan connecting to existing building exhaust. Mechanical plans uploaded. BLDG1…
- CommercialClosedProject value hiddenDec 5, 2023
office remodeling - floor 19. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sac: _0_ charges met council letter dated _10/31/23_ architect: foley
- PlumbingClosedProject value hiddenNov 30, 2023
Partial remodel of tenant space on 19th floor for Fabyanske, Westra, Hart and Thomson. Addition of 2 unisex restrooms and a breakroom area.
- CommercialClosedProject value hiddenOct 11, 2023
CONCRETE REPAIR IN PARKING GARAGE. (JJL) ENGINEER: BKBM - CHRISTOPHER PLESSEL #26837 SPECIAL INSPECTIONS: TO BE PERFORMED BY BKBM PER ENGINEER 10/6/23
- CommercialClosedProject value hiddenSep 8, 2023
Interior demolition of full suite in preparation of full interior build out. skyway level suite at corner of nicollet and 7th.
- PlumbingExpiredProject value hiddenAug 28, 2023
Replace dishwasher
- PlumbingClosedProject value hiddenAug 17, 2023
#4535. replace one breakroom sink
- CommercialClosedProject value hiddenJul 7, 2023
DEMOLITION OF EXISTING CONNECTING STAIR BETWEEN 19TH AND 20TH FLOORS. INFILL OF DECK. (JJL) certificate of occupancy required: no ***** special inspections required: yes - AMERICAN…
- CommercialClosedProject value hiddenJun 15, 2023
combine two office suites, 4535 4542 certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: 45th floor is not sprinklere…
- PlumbingClosedProject value hiddenJun 6, 2023
3) new sinks and appliances for Riverbridge on 15th floor.
- PlumbingClosedProject value hiddenJun 6, 2023
Relocate existing sink and add a standpipe for Phase 2 of expansion/remodel project for PNC Bank on 14th floor.
- MechanicalClosedProject value hiddenMay 31, 2023
Plans available in Elms.
- CommercialClosedProject value hiddenMay 19, 2023
Suite #3000 new demising wall and corridor extension after suite demo certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinkle…
- CommercialClosedProject value hiddenMay 17, 2023
remodel at suite #1500 (JJL) certificate of occupancy required: no ***** special inspections required: no***** const type: I-A ***occupancy: B ***2020 MSBC***** occupant load: 58 I…
- CommercialClosedProject value hiddenApr 18, 2023
demo and infill stairs certificate of occupancy required: no special inspections required: yes const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes Floo…
- CommercialClosedProject value hiddenApr 7, 2023
SUITE 3450 MATTEL COMPANY EXPANSION certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: 34th is not sprinkler protect…
- PlumbingClosedProject value hiddenMar 14, 2023
Remodel of existing restrooms on 33rd Floor - New lavatories, new flush valves
- MechanicalClosedProject value hiddenMar 7, 2023
40 replacement VAV's, all new difussers, revision of existing duct layout ducts for new vavs and 5 new transfer fans per attached drawings. Floors 30 and 31
- CommercialClosedProject value hiddenFeb 16, 2023
INTERIOR REMODEL AT LEVEL 30 AND 31 (MAA) const type: 1 A occupancy: B 2020 MSBC occupant load: 75 AT LEVEL 30 AND 132 ON LEVEL 31 sprinklered: YES Tenant: LATHROP GPM Floor(s): sa…
- CommercialClosedProject value hiddenFeb 9, 2023
INTERIOR REMODEL (MAA) REVISION AFTER ISSUANCE 05.01.2023 ADD KITCHEN AND REMOVE FEW OFFICES FOR COLLEBORATION const type: I A occupancy: B 2020 MSBC occupant load: 69 sprinklered:…
- PlumbingClosedProject value hiddenFeb 9, 2023
14TH FLOOR/PNC BANK - MOTHER'S ROOM - nstall (1) sink for mother's room as part of expansion/remodel project for PNC Bank on 14th floor.
- MechanicalClosedProject value hiddenFeb 7, 2023
HVAC modification adding two new VAV boxes, relocating one VAV box, GRDs and all associated ductwork. Refer to attached drawings.
- PlumbingClosedProject value hiddenFeb 2, 2023
Tenant remodel for Lathrop GPM on Floors 30 & 31.
- MechanicalClosedProject value hiddenJan 17, 2023
Minor duct modify for existing duct system. Contractor showed corridor wall as 3D wall type non rated. Plans attached.
- PlumbingClosedProject value hiddenDec 27, 2022
WATER COOLER 14TH FLOOR CORRIDOR
- MechanicalClosedProject value hiddenDec 13, 2022
Minor revisions on two VAV distribution , relocating 6 diffusers, adding transfer air duct, installing exhaust fan for IT room. Refer to attached drawings.
- CommercialClosedProject value hiddenDec 13, 2022
TENANT BUILDOUT OF SUITE 3850 IN THE IDS TOWER const type: 1A occupancy: B 2020 MSBC sprinklered: yes Tenant: accesso Floor(s): 38th architect: Hustad, Mary B. - 17408 engineer:
- CommercialClosedProject value hiddenDec 12, 2022
14TH FLOOR - NEW WALLS-CORRIDOR EXTENSION, ELEVATOR LOBBIES, WELLNESS ROOM DB appvd post-issue revisions with upload date 12/22/22 certificate of occupancy required: no special ins…
- MechanicalClosedProject value hiddenNov 3, 2022
Buildout tenant area. Plans attached.
- PlumbingClosedProject value hiddenOct 11, 2022
Remodel/buildout - 42nd floor -Okabena
- CommercialClosedProject value hiddenOct 7, 2022
TI AT 42ND FLOOR (MAA) certificate of occupancy required: NO const type: I A occupancy: B 2020 MSBC occupant load: 121 sprinklered:YES Tenant: OKABENA Floor(s): 42ND architect: KIM…
- CommercialClosedProject value hiddenSep 28, 2022
(DMH - ProjectDox) OFFICE DEMO AND REMODEL TO 13,259 SQFT NORTH HALF OF 26TH FLOOR. EXISTING SEPARATE TENANT AT SOUTH SIDE. NO CHANGE IN EXITS OR CORRIDORS. Const type: 1-A Occupan…
- MechanicalClosedProject value hiddenSep 13, 2022
HVAC alteration reusing existing 14 VAV boxes and adding three new VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.
- CommercialClosedProject value hiddenSep 8, 2022
remodel common area 26th floor certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load: 164 sprinklered: yes sac…
- PlumbingClosedProject value hiddenAug 22, 2022
RESTROOMS AND CORRIDORS ON 26TH FLOOR
- PlumbingClosedProject value hiddenAug 22, 2022
RENOVATION OF SUITE 2600 FOR TAFT ON 26TH FLR
- MechanicalClosedProject value hiddenAug 22, 2022
HVAC system modification, adding (5) new diffusers, relocating (3) diffusers and adding (3) new RA grilles.
- MechanicalClosedProject value hiddenAug 15, 2022
Remove/re-install: (5) exhaust grilles, (2) linear diffusers, (2) 2x2 diffusers. Replace (2) 6' linears in lobby. Add (2) return air grilles.
- PlumbingClosedProject value hiddenAug 8, 2022
FOR 28TH FLOOR - PLUMBING FIXTURES FOR PANTRY
- CommercialClosedProject value hiddenJul 18, 2022
office alterations in suite 2800. certificate of occupancy required: no sprinklered: yes Tenant: DLA Piper architect: walz #23558
- MechanicalClosedProject value hiddenMay 3, 2022
HVAC system alteration, adding new 15 VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.
- MechanicalClosedProject value hiddenApr 19, 2022
Adding transfer fan (200 cfm). Demo (5) registers, relocate one register, add four new diffusers, add 4 new return grilles per attached sketch.
- PlumbingClosedProject value hiddenApr 19, 2022
Renovation of Restrooms on 42nd floor.
- PlumbingClosedProject value hiddenApr 19, 2022
Remodel of 46th floor for Fulcrum. Addition of 2 sinks.
- PlumbingClosedProject value hiddenApr 19, 2022
Build out of suite on 38th floor for MedTrace. Add (1) Sink.
- CommercialClosedProject value hiddenApr 14, 2022
remodel 46th floor offices. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes Tenant: fulcrum sac: _0_ charges met council letter dated _…
- CommercialClosedProject value hiddenMar 24, 2022
SUITE 3875 - BUILD OUT OF WHITEBOX SUITE certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load of Suite: 31 sp…
- MechanicalClosedProject value hiddenMar 14, 2022
HVAC system of 42nd floor of IDS center, adding main duct work and two VAV boxes with associated GRDs. The existing induction system to remain. Refer to attached drawings.
- MechanicalClosedProject value hiddenMar 14, 2022
HVAC system alteration, rezoning VAV boxes, adding transfer fan, GRDs and all associated ductwork. Refer to attached drawings.
- CommercialClosedProject value hiddenFeb 17, 2022
RANDSTAD SUITE 2600. TENANT IMPROVEMENT. (JJL) certificate of occupancy required: no ***** special inspections required: no***** const type: IA ***occupancy: B ***2020 MSBC***** oc…
- PlumbingClosedProject value hiddenFeb 17, 2022
26th floor 2 sinks
- PlumbingClosedProject value hiddenFeb 17, 2022
Sinks and floor drains for a doughnut shop.
- CommercialClosedProject value hiddenFeb 17, 2022
Tenant Improvement - Suite 4200 - INTERIOR DEMO ONLY certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: Parti…
- CommercialClosedProject value hiddenJan 11, 2022
43rd Floor - Vanilla Shell - Includes infill of existing floor opening certificate of occupancy required: no special inspections required: yes const type: 1A occupancy: B 2020 MSBC…
- PlumbingClosedProject value hiddenDec 20, 2021
bathrooms on 43rd floor
- MechanicalClosedProject value hiddenDec 8, 2021
43rd floor's Main duct work and adding two VAV boxes per attached plans.
- CommercialClosedProject value hiddenNov 24, 2021
Tenant Remodel - Suite 1550 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes (15th floor) architect: Ma…
- MechanicalClosedProject value hiddenNov 8, 2021
Relocating 3 diffusers and adding one. Adding 2 grilles and 2 transfers. Adding one transfer fan for IT room.
- MechanicalClosedProject value hiddenNov 8, 2021
HVAC system to accommodate for new layout, using existing system and adding 5 VAV boxes, revising duct work, GRD's and all associated ductwork. Refer to attached drawings.
- PlumbingClosedProject value hiddenNov 1, 2021
kitchen equipment replacement - no new piping in walls or below floor. No plan review required.
- CommercialClosedProject value hiddenOct 26, 2021
SUITE 3710-Interior demolition and remodel certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 81 sprinkler…
- PlumbingClosedProject value hiddenOct 12, 2021
Remodel of 38th floor restrooms. Replace existing lavatory fixtures. Install instant water heaters. Revise toilets for accessibility.
- PlumbingClosedProject value hiddenOct 12, 2021
Build out of spec suites on 38th floor. There will be 4 break room areas with sinks.
- CommercialClosedProject value hiddenSep 28, 2021
UNPRADES TO INTERIOR SPACE. 38TH FLOOR. 5 SUITES ON THE FLOOR BEING RENOVATED. NO STRUCTURAL WORK. NO CHANGE TO EXITING. (JJL) certificate of occupancy required: no ***** special i…
- CommercialClosedProject value hiddenSep 27, 2021
38TH FLOOR. INTERIOR FINISH UPGRADES TO LOBBY, RESTROOM, AND CORRIDORS. SOME MINOR INTERIOR DEMO. NO STRUCTURAL WORK OR CHANGE TO EXITING. (JJL) certificate of occupancy required:…
- MechanicalClosedProject value hiddenSep 2, 2021
Adding exhaust grille to new ADA restroom and connecting to existing building exhaust system.
- CommercialClosedProject value hiddenAug 31, 2021
(DMH - ProjectDox) SELECT DEMO AND REMODEL TO EXISTING BANK, SUITE 250, FOR REBRANDING OF NEW OWNER. NO CHANGE IN EXITING OR USE. Const type: 1 Occupancy: B 2020 MSBC Sprinkled: NO…
- PlumbingClosedProject value hiddenAug 26, 2021
UNISEX RESTROOM 8TH FLOOR
- CommercialClosedProject value hiddenMay 4, 2021
remove sliding glass door system and replace with pair of swing doors on skyway level - wells fargo bank branch. suite 281. sck
- PlumbingClosedProject value hiddenApr 27, 2021
FIXTURES FOR 8TH FLOOR RESTROOM(S)
- CommercialClosedProject value hiddenApr 22, 2021
8th floor corridor, lobby and restroom remodeling certificate of occupancy required: NO special inspections required: YES - FIRE RATED PENTRATIONS const type: I-A occupancy: B 2020…
- CommercialClosedProject value hiddenJan 12, 2021
alterations to skyway level ATMs. sck
- MechanicalClosedProject value hiddenJan 11, 2021
Contractor will install the heat exchanger, pumps, condensate pump, hydronic piping and all associated.This application is for the hydronic piping and system portions of the projec…
- PlumbingClosedProject value hiddenJan 7, 2021
New water heater and eyewash, in floor hose connection for Crystal Court remodel.
- CommercialClosedProject value hiddenJan 5, 2021
Crystal Court Renovation certificate of occupancy required: no special inspections required: yes const type: 1A occupancy: B/A3 2020 MSBC architect: David Dimond #23597 engineer: D…
- MechanicalClosedProject value hiddenDec 10, 2020
Ductwork modification per attached drawings. They will submit separate permit for hydronic piping and associated.
- CommercialClosedProject value hiddenOct 30, 2020
46th floor renovation for future tenant improvement. sck floor is being abated and sprinklers will be installed. separate permit required for tenant improvements
- MechanicalClosedProject value hiddenOct 15, 2020
Removal and replacement of ductwork for 46th floor. Connecting to existing duct risers.
- CommercialClosedProject value hiddenOct 8, 2020
INTERIOR REMODEL certificate of occupancy required: no ***** special inspections required: no***** const type: I-A ***occupancy: B ***2020 MSBC***** occupant load: no change *****…
- MechanicalClosedProject value hiddenOct 5, 2020
Add one VAV for conference room.
- PlumbingClosedProject value hiddenJun 11, 2020
Tenant buildout of 47th floor for Nichols Kaster. New unisex restroom, breakroom, mothers room.
- MechanicalClosedProject value hiddenJun 11, 2020
Reconfiguration of HVAC supply system, adding 17 VAV boxes and one heat pump unit, supply diffusers, return grills and all associated duct work. Refer to attached drawings.
- CommercialClosedProject value hiddenMay 21, 2020
Tenant remodeling - whole floor certificate of occupancy required: NO***** special inspections required: YES - FIRE RATED PENETRATIONS ***** const type: I-A ***occupancy: B ***2015…
- PlumbingClosedProject value hiddenApr 2, 2020
RELOCATE BREAK ROOM SINK-37TH FLOOR SUITE 3710 COFFEE MAKER, ICE MAKER AND DISHWASHER
- MechanicalClosedProject value hiddenMar 9, 2020
- CommercialClosedProject value hiddenMar 2, 2020
(DMH#1) REMODEL TO TENANT #3710. 2,245 S.F TENANT SPACE. INSTALL SOME PARTITION WALLS, NEW GLASS OFFICE FRONTS AND INSTALL NEW EMPLOYEE KITCHEN FINISH. EXISTING CEILING FINISH REMA…
- PlumbingClosedProject value hiddenFeb 24, 2020
INSTALL (2) SINKS, AND REPLACE (31) RESTROOM FIXTURES IN 7TH FLOOR
- CommercialClosedProject value hiddenFeb 10, 2020
6TH FLOOR, SUITE 675 OFFICE REMODEL. 2 SEPARATE BREAKROOM AREAS. NO CHANGE OF EXITING LOCATIONS. NO BATHROOMS. (JJL)*********************** certificate of occupancy required: no **…
- CommercialClosedProject value hiddenFeb 10, 2020
REMODEL OF 7TH FLOOR CEILING TILES, RECEPTION AREA. NO CHANGE TO EXITING. NO STRUCTURAL WORK. (JJL)************************** certificate of occupancy required: no ***** mechanical…
- CommercialClosedProject value hiddenFeb 10, 2020
Core toilet facilities improvements serving 7th floor certificate of occupancy required: no ***** special inspections required: no***** const type: I-A ***occupancy: B ***2015 MSBC…
- MechanicalClosedProject value hiddenJan 27, 2020
INSTALL 2 NEW GATE VALVES SERVING THE COOLING TOWER LINES.
- PlumbingClosedProject value hiddenJan 21, 2020
TENANT BUILD OUT - 24TH FLOOR
- MechanicalClosedProject value hiddenJan 16, 2020
41ST FLOOR-VERMILLION BANK ______ Add 3 VAVs
- PlumbingClosedProject value hiddenJan 14, 2020
REMOVE FRONT LINE PLUMBING - 6 fixtures ______ Plans provided. Plans NOT reviewed for code compliance. CONTACT INSPECTOR AT START OF JOB.
- PlumbingClosedProject value hiddenJan 13, 2020
INSTALL SINK & WATER HEATER FOR NEW BREAK ROOM 36TH FLOOR
- CommercialClosedProject value hiddenJan 8, 2020
Tenant Remodel certificate of occupancy required: no ***** special inspections required: no***** occupancy: B ***2015 MSBC***** Tenant: Littler ***Floor(s): 13 ***** architect: Gen…
- PlumbingClosedProject value hiddenJan 8, 2020
FOR 41ST FLOOR - VERMILLION CAPITOL
- CommercialClosedProject value hiddenJan 2, 2020
NEW STARBUCKS COFFE SHOP 1420 sqft (MAA) DONE WITH REVIEW. certificate of occupancy required: NO const type: I A occupancy: A2 2015 MSBC occupant load: 22 sprinklered: YES 20% acce…
- CommercialClosedProject value hiddenNov 21, 2019
tenant remodeling certificate of occupancy required: NO***** special inspections required: yes FIRE RATED PENETRATIONS***** const type: I-A ***occupancy: B ***2015 MSBC***** occupa…
- CommercialClosedProject value hiddenNov 6, 2019
non-struct remod suite 3715. small addition of enclosed space (closets).
- MechanicalClosedProject value hiddenOct 24, 2019
ALL NEW MAINS FOR 24TH FLOOR
- MechanicalClosedProject value hiddenOct 23, 2019
24 NEW VAV,S / NEW HVAC FOR 24TH FLOOR PER PLANS
- MechanicalClosedProject value hiddenOct 23, 2019
NEW HVAC FOR 47TH FLOOR / 2 NEW VAVS & DUCTS PER PLANS
- PlumbingClosedProject value hiddenOct 22, 2019
41ST FLOOR BREAK ROOM SINK
- MechanicalClosedProject value hiddenOct 18, 2019
ADD 3 VAV,S ON 41ST FLOOR SPEC SUITE
- CommercialClosedProject value hiddenOct 18, 2019
ELEVATOR LOBBY AND CORRIDOR REMODEL AT 41ST LEVEL (MAA) const type: IA occupancy: B ***2015 MSBC***** sprinklered: yes architect: MARY BB. HUSTAD
- CommercialClosedProject value hiddenOct 15, 2019
DEMO FLOOR. ALSO REBUILD BATHROOMS. BATHROOM REMODEL INCLUDED ADA STALL. PERMIT DOES NOT INCLUDE ANY ADDITINIONAL CONSTRUCTINO ON 47TH FLOOR. LOBBY WILL BE REQUIRED ON BUILD OUT. (…
- CommercialClosedProject value hiddenOct 4, 2019
41ST FLOOR TENANT BUILDOUT. VERMILLION CAPITAL. OFFICE BUILDOUT. (JJL)*********** certificate of occupancy required: no************* mechanical plans required for certificate of oc…
- CommercialClosedProject value hiddenOct 3, 2019
DEMO WORK ON 24TH FLOOR. NO CONSTRUCTION. NO PERMIT WORK. (JJL) ARCHITECT: NELSON MARY HUSTAD #17408
- CommercialClosedProject value hiddenOct 2, 2019
Non-structural SUITE 4160 SUITE BUILDOUT 1994 SF B occupancy. 41st floor is fully sprinklered.
- CommercialClosedProject value hiddenAug 20, 2019
3RD FLOOR. CONFERENCE ROOM REMODEL. NO CHANGE TO EXITING. MISC FRAMING. (JJL)************** certificate of occupancy required: no******** mechanical plans required for certificate…
- CommercialClosedProject value hiddenAug 7, 2019
modify lighting in conference room on 44th floor. sck****
- MechanicalClosedProject value hiddenJun 28, 2019
MODIFY EXISTING HVAC / ADD NEW VAV'S / FS DAMPERS AT ELEVATOR LOBBY PER APPROVED PLANS / NO OTHER NEW EQUIPMENT / ALL PIPING BY OTHERS UNDER A SEPERATE PERMIT / E PLANS ATTACHED
- MechanicalClosedProject value hiddenJun 19, 2019
Relocate 4 grills and diffusers, add 2 grills and diffusers.
- PlumbingClosedProject value hiddenJun 19, 2019
tenant build out 22nd floor breakroom and drinking fountain
- MechanicalClosedProject value hiddenJun 13, 2019
Renovation of just 25th floor adding 21 new VAV boxes, 1 inline exhaust fan and one heat pump unit and all associated ductworks. Refer to attached drawings.
- CommercialClosedProject value hiddenMay 29, 2019
interior tenant remodeling certificate of occupancy required: NO ********** special inspections required: NO********** const type: I-A occupancy: B 2015 MSBC************** occupant…
- MechanicalClosedProject value hiddenMay 15, 2019
condenser water 23rd floor / ALL NEW EQUIPMENT ON ANOTHER PERMIT FROM THE SAME MECH. CONTRACTOR
- MechanicalClosedProject value hiddenApr 5, 2019
ADD VAV'S & DUCTS PER ENG PLANS 25TH FLOOR
- PlumbingClosedProject value hiddenMar 28, 2019
23RD AND 24TH FLOOR BREAK ROOMS/DRINKING FOUNTAINS AND RESTROOMS
- MechanicalClosedProject value hiddenFeb 6, 2019
ADD 2 VAV'S TO LOUNGE
- PlumbingClosedProject value hiddenFeb 6, 2019
TENANT LOUNGE BUILDOUT 41ST FLOOR
- CommercialClosedProject value hiddenJan 28, 2019
interior office remodel - floors 22, 23, 24, 25 - single tenant. sck#1 certificate of occupancy required: no const type: 1a occupancy: B 2015 MSBC sprinklered: yes 20% accessibilit…
- CommercialClosedProject value hiddenJan 25, 2019
suite # 800 8th floor interior remodel. ADDING INTERIOR NON BEARING WALL TO DIVIDE EXISTING CONFERENCE ROOM IN TO 2 ROOMS. ADJUST SPRINKLER LAYOUT AS NEEDED. CORING (3) SMALL HOLES…
- MechanicalClosedProject value hiddenJan 14, 2019
RELOCATE DIFFUSERS FOR 15TH FLOOR
- CommercialClosedProject value hiddenJan 7, 2019
TENANT IMPROVEMENMT OF EXISTING OFFICE SPACE ON 15TH FLOOR OF IDS BUILDING. AAJ#1 certificate of occupancy required: NO mechanical plans required for certificate of occupancy mecha…
- PlumbingClosedProject value hiddenJan 3, 2019
15TH FLOOR REPLACE ELECT. WATER HEATER
- CommercialClosedProject value hiddenDec 31, 2018
(DMH#1) SELECT DEMO AND REMODEL TO EXISTING 18TH FLOOR TENANT SPACE, 7,778 S.F. INSTALL NEW PARTITION WALLS FOR OFFICES. REMODEL EMPLOYEE BREAKROOM. NO CHANGE IN USE OR EXITS. Cons…
- MechanicalClosedProject value hiddenDec 24, 2018
ADD 1 VAV ZONE FOR 18TH FLOOR
- CommercialClosedProject value hiddenDec 21, 2018
alterations on 41st floor for employee amenity lounge - approx. 5100 sq ft. sck#1 ************alternate method approved for exiting configuration of 41st floor.************ certifi…
- CommercialClosedProject value hiddenNov 20, 2018
Suite # 2100 interior alterations certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: Ballard Spah…
- PlumbingClosedProject value hiddenNov 13, 2018
restrooms and drinking fountain 48th floor
- CommercialClosedProject value hiddenNov 2, 2018
48th FLOOR CORRIDORS AND RESTROOMS REMODEL (MAA) certificate of occupancy required: YES const type: I-A occupancy: B 2015 MSBC occupant load: 57 sprinklered: yes Tenant: ACCESSO SE…
- CommercialClosedProject value hiddenOct 10, 2018
TI - Expansion certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: Schwebel, Goetz & Sieben Floor(…
- MechanicalClosedProject value hiddenSep 24, 2018
23RD & 25TH FLRS-ADD 4 VAV'S & 10 F/S DAMPERS - REVISE DUCTS PERENGINEERED DRAWINGS
- CommercialClosedProject value hiddenSep 21, 2018
23rd and 25th floor DEMO. REMOVING INERIOR WALLS. FLOORING, CEILING GRID. SPACES BEING ABATED, THEN NEW CEILING GRID INSTALLED. NO STRUCTURAL WORK. (JJL)
- CommercialClosedProject value hiddenAug 10, 2018
49 TH FLOOR INTERIOR REMODEL. SOME MINOR DEMO WORK. RECONFIGURING SOUTH EAST CORNER OF BUILDING. NEW OFFICE WALLS TO BE NON-COMBUSTIBLE CONSTRUCTION. NO STRUCTURAL WORK, OR MODIFIC…
- PlumbingClosedProject value hiddenJul 20, 2018
3 sinks to waste line
- CommercialClosedProject value hiddenApr 16, 2018
office alterations on 40th and 41st floors. sck#1 certificate of occupancy required no const type: 1a occupancy: b 2015 MSBC sprinklered: yes Tenant: Floor(s): sac: _0_charges met…
- CommercialClosedProject value hiddenApr 10, 2018
NON STRUCTURAL DEMO AT SUITE 605 (MAA)
- CommercialClosedProject value hiddenMar 27, 2018
EXPAND EXISTING OFFICE BY ADDING APPROX. 2400 SQFT AT 48TH FLOOR (MAA #01) certificate of occupancy required NO const type: I A occupancy: B 2015 MSBC occupant load: 180 sprinklere…
- PlumbingClosedProject value hiddenMar 7, 2018
40th floor remodel
- MechanicalClosedProject value hiddenMar 7, 2018
40th & 41st floor Liebert CRCU (2) 3 ton each per engineered drawings
- MechanicalClosedProject value hiddenMar 5, 2018
DUCTS & VAV'S FOR 40TH & 41ST FLOORS / 2 LIEBERT UNITS
- MechanicalClosedProject value hiddenFeb 15, 2018
28TH FLOOR/DLA PIPER - DIFFUSERS
- CommercialClosedProject value hiddenJan 30, 2018
Suite 3902 Remodel certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 89 sprinklered: no Tenant: Slalom Flo…
- PlumbingClosedProject value hiddenJan 8, 2018
add sink 39th floor for slalom expansion
- CommercialClosedProject value hiddenJan 4, 2018
INTERIOR NON STRUC DEMO OF SUITE 3902 OFFICES (JAG) MAINTAIN REQUIRED SEPARATIONS AND LIFE SAFETY SYSTEMS TO PROTECT CORE AND OTHER SUITES. NO RECONSTRUCTION THIS PERMIT. certifica…
- MechanicalClosedProject value hiddenDec 27, 2017
COOLING TOWER AND PIPING 8TH FLOOR IDS
Development activity near 80 8TH St S
5 mapped permits within 500 m, shown on the intelligence map above.
80 8TH St S in the Minneapolis permit market
This address has 197 permit records in PropertyLab's public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
- City address-linked rows
- 398,514
- City, trailing 90 days
- 8,039
- City, trailing 30 days
- 2,529
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 19, 2026.
Permit questions about 80 8TH St S
- Are there building permits at this address?
- 80 8TH St S has 197 municipal building permits on record, with the latest activity dated Jul 16, 2026.
- What construction activity is nearby?
- 5 mapped permits were found within 500 m of 80 8TH St S.
- What is the declared permit value?
- Permits recorded at 80 8TH St S represent $46M in total declared construction value.
About this address record
PropertyLab compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 80 8TH St S is dated Jul 16, 2026. Municipal records can be corrected or updated after publication.
Contractors and applicants associated with these permits
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 80 8TH St S in the PropertyLab platform, along with alerts when new permits are filed at this address.