Building permit intelligence · Minneapolis, MN
5033 13TH Ave S has 8 municipal building permits on file in Hale. The latest recorded activity was a plumbing permit dated Jul 27, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 5 mapped permits within 500 m of this address.
METER MOVE Q2 - 2026 BATCH #1
Rework supplies in upper level for new addition
Relocation of basement laundry- install washer box, laundry tub and new floor drain location Run gas main in new location to allow for finished ceiling.
NEW DORMER ADDITION AND STRUCTURAL REMODEL OF BASEMENT AND 2ND FLOOR TO ADD ONE NEW BEDROOM AND WALK-IN CLOSETS ON 2ND FLOOR OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS…
CONSTRUCT DETACHED _22__ BY _24__ WOOD FRAME GARAGE. Construction Documents: ELECTRONIC (ProjectDox) Building Code: 2020 MN RESIDENTIAL CODE/MN RULES CH 1309 (2018 IRC) Energy Code…
5 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on 13TH Ave S with municipal permit records in Minneapolis.
This address has 8 permit records in PropertyLabs' public history and is located in Hale. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 5033 13TH Ave S is dated Jul 27, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 5033 13TH Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
ADD 3/4 BATH ON 2ND FL, MOVE KITCHEN, MOVE MAIL BATH, LAUNDRY TU, INSTALL WATER HEATER
REMOVE AND INSTALL NEW HVAC SYSTEM
***********************3/10/20. NEW HEADER ADDED TO SUPPORT CEILING FRAMING ONLY. HEADER IS DESIGNED AS 2 PLY LVL. HEADER IS SUPPORTED BY A NON LOAD BEARING HEADER ON ONE END, AND…
Plumbing · Jul 27, 2026