Building permit intelligence · Minneapolis, MN
515 Washington Ave N has 27 municipal building permits on file in North Loop. The latest recorded activity was a mechanical permit dated Mar 5, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
1,100sqft space with an existing 4 ton WSHP controlling space temp and a separate building ventilation system. Statement from contractor on application: " Binder Heating & Air will…
ComMFDRR
Plumbing for a commercial kitchen remodel. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings,…
Remodel of tenant space into boutique Chocolate production/retail -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B, M 2020 M…
Replace dishwasher- Ste 300
4 mapped permits within 500 m, shown on the intelligence map above.
8 other addresses on Washington Ave N with municipal permit records in Minneapolis.
This address has 27 permit records in PropertyLabs' public history and is located in North Loop. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 515 Washington Ave N is dated Mar 5, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 515 Washington Ave N in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Adding two toilet exhaust fans and all associated ductwork per approved plans.
construct 2 rooftop single user accessible toilet rooms and 528 square foot roof deck expansion. certificate of occupancy required: no 2020 MSBC sprinklered: yes Tenant: nolo kitch…
Nolo/Adding 2 new bathrooms on the Rooftop patio
Roof top addition and remodel Containers' review authority RADCO, Fountain Valley, CA certificate of occupancy required: yes special inspections required: yes (local connections an…
Plans attached. General exhaust for basement is utilizing an unused/never used existing grease duct.
CHANGE OCCUPANT LOADING OF RESTAURANT/BAR Original permit and CofO BLDG652398 certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: A-2…
temporary change of occupancy of rooftop patio from A-3 to A-2 to support it's use as an outdoor dining space to be operated by first floor restaurant. As part of the change in use…
alterations to canopy at side entry and new sloped walk, steps and landings at same. sck#1
NOLO'S KITCHEN & BAR - FREEZER & 2 WALK IN COOLERS LOCATED IN BASEMENT
Nolo's Kitchen and Bar 10,000 SF TENANT BUILDOUT OF NEW RESTAURANT ON 2 LEVELS certificate of occupancy required : yes mechanical plans required for certificate of occupancy: YES m…
Ductwork only serving kitchen ventilation system, seating area, toilet exhaust basement & 1st floor per engineered drawings,
CONSTRUCT 2 HOUR DUCT ENCLOSURE IN COMMON AREA ONLY AND SHAFT COMPARTMENTS FROM 1ST FLOOR THROUGH 4TH FLOOR IN EXISTING COMMERCIAL BLDG. AAJ#1 ***NOTE: ADDITIONAL PERMITS WILL BE R…
Add heat pumps for future tenants and exhaust along with heat pump to cool elevator shaft to original approved plans
1st floor common area restrooms
install bathrooms in final locations on 2nd, 3rd, and 4th floors. sck#2 value of this work was included in previous permits - minimum fee assigned to this permit. certificate of oc…
REMODEL EXISTING 2,3 AND 4TH FLOOR INTO OFFICE SPACE certificate of occupancy required yes mechanical plans required for certificate of occupancy EXIT FROM ELEVATOR LOBBY ON SECOND…
first floor alterations for final layout of bathrooms and lobby. sck#1 minimum fee collected - value of work was accounted for in previous permits. certificate of occupancy require…
FOR LEVELS 2, 3 & 4 - Provide HVAC system - Install Heat pumps & duct distribution per engineered drawings. FOR LEVELS 2 & 3 - Provide HVAC system - Install Heat pumps & duct distr…
FOR LEVELS 2 & 3 FOR LEVELS 2 & 3 - STANDPIPE, COFFEE LINE, AND 2 BREAKROOM SINKS