800 Washington Ave N has 126 municipal building permits on file in North Loop. The latest recorded activity was a mechanical permit dated Jun 15, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
HVAC system alteration to align with new floor layout, adding two new VAV boxes, GRDs and associated ductwork per approved plans.
Modify supply air distribution branch ducts for new tenant space. Also adding transfer duct throughout. Engineers' specs are located on the following link and projectdox. M800.pdf…
remodel management office on 2nd floor and training room on 1st floor. certificate of occupancy required: no const type: 4ht and 1b occupancy: b 2020 MSBC sprinklered: yes sac: _0_…
MINOR RELOCATION OF EXISTING SINK ROUGH IN FOR NEW SINK IN TRAINING ROOM, HOSE BIBB FOR DOG PARK, DISHWASHER AT MANAGEMENT OFFICE
ROUGH IN AND INSTALL 1 BREAK ROOM SINK AND 1 POINT OF USE ELECTRIC WATER HEATER
1 mapped permit within 500 m, shown on the intelligence map above.
8 other addresses on Washington Ave N with municipal permit records in Minneapolis.
This address has 126 permit records in PropertyLabs' public history and is located in North Loop. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 800 Washington Ave N is dated Jun 15, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 800 Washington Ave N in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Remodel of existing unoccupied suite - #460 -ACW certificate of occupancy required: no special inspections required: no const type: 1A (assumed) occupancy: B 2020 MSBC occupant loa…
FoodBev
HPC / HVAC ductwork modifications for new tenant 670. Duct system with vav's. No know mechanical piping. Existing duct in stairway will need Fire smoke dampers at duct entering sta…
HVAC ductwork modifications for new tenant. Branch duct run outs are being re-work and rebalanced to meet new office layout.2 mains ducts are exiting;2 transfer air ducts from neig…
ROUGH IN AND INSTALL 2 SINKS AND 2 POINT OF USE ELECTRIC WATER HEATERS
T/I SUITE 450 const type: IA occupancy: B 2020 MSBC occupant load: 115 sprinklered: YES architect: 49342 - Little, David Bruce @ HGA
Remodel of an existing unoccupied floor and the demising of the space to create three new spec suites and common corridor -ACW certificate of occupancy required: no special inspect…
T/I HKGI, SUITE 207 BLDG1135114 const type: IA occupancy: B 2020 MSBC occupant load: 70 sprinklered: YES architect: 49342 - Little, David Bruce @ HGA
#207. replace sink
4th floor. mop sink, drinking fountain, ele.w/h
rough in and install 2 sinks 2 electric water heaters
T/I SUITE 670 2020 MSBC architect: 54421 - Martinson, Brock Taylor @ POPE
ROUGH IN AND INSTALL 1 DRINKING FOUNTAIN
T/I SUITES 640, 660, 670 2020 MSBC architect: 49342 - Little, David Bruce @ HGA
construct 3 hr fire barrier demising wall on 1st floor at annex. sprinklered: yes architect: Little #49342 HGA architects
REMODEL SUITE 700 const type: IA occupancy: B 2020 MSBC architect: 49342 - Little, David Bruce
BLDG1083707
SUITE 307 INTERIOR REMODEL (MAA) architect: DAVID BRUCE LITTLE 49342 engineer:
ROUGH IN AND INSTALL 1 BREAK ROOM SINK AND 1 POU ELECTRIC WATER HEATER
FOR #300 - ROUGH IN AND INSTALL 1 STANDPIPE FOR DEHUMIDIFIER DRAIN
Dishwasher Ste 203
REPLACE 1 SINK ON EXISTING ROUGH IN #203
HPC/Suite 203- Interior Remodel certificate of occupancy required: no const type: 4 occupancy: B 2020 MSBC occupant load: no change sprinklered: yes architect: D Little #49342
Suite 320,INTRA-SUITE DEMOLITION AND MINOR FINISH const type: IV occupancy: B 2020 MSBC architect: Little, David Bruce - 49342
Adding 3 transfer grills to new wall being installed in open office area for the purpose of retuning air to existing common return. The architectural drawing, located in the for re…
ROUGH IN AND INSTALL 1-MOTHERS ROOM SINK & 1-POINT OF USE ELECTRIC WATER HEATER
tenant downsize 5th floor certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes architect: D Little #49342 SAC (0 c…
STE 600/JE DUNN CONSTRUCTION OFFICE REMODELING certificate of occupancy required: no const type: 4 occupancy: B 2020 MSBC occupant load: 178 sprinklered: yes - Sprinkler protection…
Modify duct for new floor plan. Drawing available.
floor drain, coffee maker, water dispensor 2nd fl
T/I - INTERIOR REMODEL, SUITE '320', DEMOLITION AND BUILD 15-FEET WALL certificate of occupancy required: no special inspections required: no const type: IV occupancy: B 2020 MSBC…
window well/retaining wall restoration and guardrail installation. engineer: malm
UPDATE OFFICE FINISHES - SUITE 250 certificate of occupancy required: no special inspections required: no const type: IV occupancy: B 2020 MSBC occupant load: sprinklered: yes Tena…
5TH FLOOR REMODEL (MAA) certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ speci…
Duct modification to accommodate the new tenant floor plan.
break room sink and electric water heater
INTERIOR REMODEL OF SUITE 704 (MAA) certificate of occupancy required: yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance…
SUITE 301 TENANT BUILDOUT Inspectors please note: Sprinkler heads are required above and below "clouds" certificate of occupancy required: no special inspections required: no const…
ROUGH IN AND INSTALL 1 BREAK ROOM SINK WITH POINT OF USE WATER HEATER
19 VAV's, 2 Fan coil, 2 LP steam fin tubes 1 exhaust fan. associated duct and piping systems. refer to attached drawings.
rework existing duct systems to accommodate new tenant office layout.
interior remodel certificate of occupancy required: no special inspections required: no const type: occupancy:A-3 2020 MSBC occupant load:130 sprinklered: energy code chapter used:…
FOR3RD FLOOR BREAKROOM(S) - INSTALL PLUMBING FOR 1 KITCHEN SINK, 1 WELLNESS ROOM SINK, 2 WATER HEATERS, 2 TOILETS AND 2 LAVS
INTERIOR DEMO FOR FUTURE REMODEL (MAA) ARCHITECT: JOHN WORKLEY 43733
TENANT IMPROVEMENT OF EXISTING TENANT SPACE TO ADD NEW DEMISING WALL ON 3RD FLOOR OF A COMMERCIAL BUILDING. AAJ (PROJETC DOX PLAN). - ADD NEW FLOOR TO DECK PARTITION WALL WITH 3 5/…
HPC&FOOD-REPLACE PIPING FOR FUEL OIL STORAGE TANK
HVAC system for t enant Improvement, using existing system and modifying GRDs and all associated ductwork.
FOR SUITE 200 BREAKROOM - DEMO EXISTING SINK, INSTALL PLUMBING FOR 2 SINKS AND WATER HEATER AND OTHER FIXTURES
T/I - REMODEL - UNIT 200 ----- architect: DAVID BRUCE LITTLE - 49342 ----- occupancy: B construction type: sprinklered: ----- Issuance of this permit doesn't allow a violation of B…
T/I - REMODEL - UNIT 620 - DEMO TO SHELL & PREP FOR FUTURE BUILD-OUT ----- REQUIRED- FIRE-RATED ASSEMBLIES MUST BE MAINTAINED/RESTORED AS A PART OF THIS WORK ----- REQUIRED- 'RELOC…
Interior non-structural demolition in prep for future remodeling second floor
Modifying existing supply air distribution to accommodate the new tenant layout.
INSTALL GUARD RAIL - RELATED TO BLDG904112 RETAINING WALL - engineer: BERNARD G. STROH - 14269 - occupancy: U construction type: V-B ----- ----- Issuance of this permit doesn't all…
FOR #505 BREAKROOM - ROUGH-IN AND INSTALL SINK, POINT OF USE WATER HEATER AND HOOK UP THE OWNER'S DISHWASHER.
Will use main existing unit and distribution, will modify the branch duct work and GRD's to accommodate the new layout.
remodel office suite 505. sck certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes Tenant: Floor(s): 5 architect: little
BUILD 45' LONG REINF CONCRETE CANTILEVERED RETAINING WALL AT AN AREA WELL AT "TRACTOR WORKS" AFTER REMOVING EXISTING LIMESTONE RETAINING WALL AT PUBLIC SIDEWALK - (SEPERATE/FUTURE…
New interior wall construction in Annex for plumbing chase to "mitigate drainage issues of existing wall" Extend sprinkler coverage into new chase space Architect: Little #49342
(DMH - ProjectDox) SELECT DEMO AND REMODEL TO EXISTING OFFICE SPACE, SUITE 250. INSTALL NEW PARITION WALLS FOR SMALL MEETING ROOM, 2 HUDDLE ROOMS AND EMPLOYEE BREAKROOM AREA. NO CH…
FIXTURES FOR SUITE 250 BREAKROOM
dishwashers, sinks, and water heater
Non-structural tenant improvement #512 certificate of occupancy required: no special inspections required: no const type: IV occupancy: B 2020 MSBC occupant load: 156 sprinklered:…
Demo Only - Suites 207,311, 901
RUN PIPING ONLY FOR 2 GROUNDWATER PUMPS AND TIE INTO STORM SEWER IN BUILDING
121 LF OF DRAINTILE AND SUMP. (JJL)
EXTERIOR BUILDING RESTORATION INCLUDING SELECT BRICK REPLACEMENT, TUCK-POINTING, SEALANT REPLACEMENT, CONCRETE REPAIRS AND TERRACOTTA REPAIRS. (DMH -ProjectDox) (TractorWorks Build…
INTERIOR NON-STRUCTURAL DEMO SUITES 505 & 512 Cap and seal exposed penetrations as required for the IV construction side of the building Occupancy TBD
spec office suite buildout - suite 250. sck certificate of occupancy required: no occupancy: b 2020 MSBC sprinklered: yes architect: HGA
HVAC system for Tenant Improvement including VAV boxes, supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
FOR SUITE 208 BREAKROOM - SINK AND ELECTRIC WATER HEATER
OFFICE INTERIOR REMODEL AT UNIT 4510 (MAA) certificate of occupancy required: NO ***** const type: IA ***occupancy: B ***2020 MSBC***** occupant load: ***** sprinklered: YES *****…
SWAPPING 3 OF THE EXISTINGIN ANTENNAS FOR 6 NEW ANTENNAS. SWAPPING 9 EXISTING RADIOS FOR 6 NEW RADIOS. ADDING TWO CABINNETS INSIDE EXISTING EQUIPEMENT ROOM. NO STRUCTURAL MODIFICAT…
(DMH - ProjectDox) 6,207 SQ.FT. INTERIOR DEMO ONLY OF OFFICE PARTITION WALLS IN SUITE 250. ADDITIONAL PLANS, APPROVALS AND PERMIT REQUIRED FOR REMODEL WORK. APPROVED PLANS AND PERM…
BUILD ONE OFFICE IN SUITE 701. SCK
Mod existing supply distribution with new GRDs for new fl plan in suite #500.
FOR SUITE 520 BREAKROOM: ROUGH-IN AND INSTALL SINK, POINT OF USE UNDER THE COUNTER ELECTRIC WATER HEATER, AND HOOKUP DISHWASHER
INTERIOR REMODEL SUITE 500 certificate of occupancy required: no ***** special inspections required: no***** const type: IV ***occupancy: B ***2020 MSBC***** occupant load: 96 ****…
FOOD&HPC - 4TH FLOOR PLUMBING
install glass security door in lobby on 5th floor. sck
(DMH - ProjectDox) INTERIOR DEMO ONLY TO ENTIRE 4TH FLOOR OFFICE SPACE PARTITION WALLS AND FINISHES. NO DEMO TO BUILDING CORE RESTROOMS OR STAIR ENCLOSURES. ADDITIONAL PERMITS AND…
REPLACE FRONT STEPS (MAA) AS PER APPLICANT, Yes, the existing granite slabs are going to be removed and replaced with new pieces over and existing footing/foundation Yes, the build…
EXTERIOR RESTORATION. TUCKPOINTING, BRICK REPLACEMENT, SEALANT, ETC. 6 STORY ELEVATION ON SOUTH SIDE. (JJL)************** NO STRUCTURAL REPAIRS ARE SHOWN ON THIS PERMIT. STRUCTURAL…
process piping, cooking oil storage tanks
ROUGH IN/INSTALL BREAK SINK, ELECT WATER HEATER
HVAC MODS FOR NEW TENNANT SUITE #150 / NO NEW EQUIPMENT
Tenant Improvement ***** certificate of occupancy required: no ***** special inspections required: no***** occupancy: B ***2015 MSBC***** occupant load: 79 ***** sprinklered: yes *…
MINOR DUCT MODS FOR NEW FLOOR PLAN
remodel office suite 905. approx. 5500 sq ft. sck**** certificate of occupancy required: no ***** const type: 1a ***occupancy: B ***2015 MSBC***** sprinklered: yes ***** 20% access…
DISHWASHER
REMODEL 3RD FLOOR RESTROOM
Office Tenant Remodel ***** certificate of occupancy required: no ***** mechanical plans required for certificate of occupancy***** mechanical plans/letter of means of compliance s…
HVAC FOR REMODELED RESTROOM ON 3RD FLOOR
Remod of 3rd floor core toilet rooms. IF this work is in the type IV side of the building, only "clouds" with sprinkler protection up and down is permitted. Field verify adequate s…
cap 2 sinks in 301 cap 1 sink in 315
Demo Interior Walls and Patch Drywall certificate of occupancy required: no ********** special inspections required: no********** occupancy: B 2015 MSBC************** Tenant: Suite…
BASEMENT STEAM & CHILLED WATER PIPIND DONE BY ALLIANC MECHANICAL / AIR HANDLER UNIT AND DUCTS
dishwasher unit # 208
FOR LOWER LEVEL RESTROOM - ROUGH-IN AND INSTALL 2 TOILETS, 1 LAVATORY, 3 SHOWERS AND 2 FLOOR DRAINS
This permit application is just for chilled water and low steam piping. The equipment will be under different application by another contractor.
4/5/19 approved revisions to LL exiting of Fitness and headroom corrections of existing stair south of fire wall. THIS PROJECT INCLUDES THE INTERIOR REMODELING OF LOWER LEVEL AND L…
Install 1 Lav in Lab Room
RI/INSTALL LOWER LEVEL FITNESS LOCKER ROOM
interior non-structural demo in prep for future tenant space additional permits required for occupancy suites 500 and 504
install new handrails on both sides of existing building entrance. sck#2
Tenant office remodeling suite 670 ARCHITECT: 10K - Jim Lindborg #48609
TENANT FINISH (FULL FLOOR) OF 8TH FLOOR OFFICE. DTC-1 ALTERNATE APPROVED 3/26/2018 TO PERMIT SMOKE GUARD AT ELEVATOR RATHER THAN SMOKE DOORS AT LOBBY. (ALTERNATE ON FILE) HIGH RISE…
SUITE 800 DUCT ALTERATIONS
suite # 800 ri and install 2 toilets 3 lavs 2 floor drains 1 break room sink 1 under counter water heater 1 water cooler
Suite #800 - Interior demo only
Modify ductwork for new floor plan suite 201
INTERIOR OFFICE REMODEL AT SUITE 700 - 1,983 SF - PARTITION ALTERATIONS TO CREATE CONFERENCE ROOM AND KITCHENETTE AREAS (LAH) architect: DAVID BRUCE LITTLE #49342 (HGA) const type:…
CONSTRUCT NEW 10' PARTITION WALL IN EXISTING OFFICE SUITE #670 AT GRIDS 7E-8E. (DMH#2) WALL IS CONSTRUCTED TO DECK ABOVE AS SOUND ATTENUATION FROM OFFICE ENTRY. Const type: II Occu…
HVAC DUCTWORK MODIFACATIONS PER NEW TENANT FLOOR PLAN - SUITE 300
ROUGH-IN & INSTALL BREAKROOM SINK AND POINT OF USE ELECTRIC WATER HEATER
relocate sink in breakroom, add dishwasher connection
TENANT IMPROVEMENT FOR NEW OFFICE SPACE IN EXISTING COMMERCIAL BUILDING. AAJ#1 certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanic…
replace/install ice maker - unit # 600
vent and waste stack for fixtures in floors 1-6
REMOVE EXISTING GROUND LEVEL SIDE DOOR AT ALLEY LOCATION AND REPLACE WITH NEW STOREFRONT WINDOW. (DMH#1) DOOR LOCATION IS NOT A REQUIRED EXIT. THIS IS ADDITIONAL WORK TO EXISTING P…