Building permit intelligence · Boston, MA
631-651 Parker St has 15 municipal building permits on file in Ward 10. The latest recorded activity was a electrical permit permit dated May 15, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 9 mapped permits within 500 m of this address.
install 90 x 445 watt modules on roof, 1 x 25kw inverter, 1 x 100A ac disconnect, any other dc/ac work. no energy storage
Install PV system on the roof of building. Ironridge racking for asphalt shingle roof. System comprised of: 96 x 445 watt solar modules 1 x 25kw inverter, 1 x 100A disconnect and a…
Install PV system on the roof of building. Ironridge racking for asphalt shingle roof. System comprised of: 96 x 445 watt solar modules 1 x Solectria 25kw inverter, 1 x 100A discon…
replacement of (1) Lochinvar RJA 120 Storage tank
Replacing existing Fire alarm system and devices. This is a one for one swap using the existing wiring
9 mapped permits within 500 m, shown on the intelligence map above.
8 other addresses on Parker St with municipal permit records in Boston.
This address has 15 permit records in PropertyLabs' public history and is located in Ward 10. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 4, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 631-651 Parker St is dated May 15, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 631-651 Parker St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Replacement of residential unit plumbing fixtures
Electrical Renovations/Upgrades including, New Arc Fault and GFCI Breakers to Apt Loadcenters, New Interconnect HVAC Control Wiring, New GFCI Duplexes on Outdoor Locations, Disconn…
Fire alarm upgrades in conjunction with interior renovations on SF1339582;;;iSD note :work in all esting units shown on plans not for occupancy confirmation; ;
Work includes but not limited to upgrades to the following: kitchen cabs and countertops, bathroom vanities and countertops, plumbing upgrades, electrical upgrades, hvac upgrades,…
replacing toilets in 649 C(2) 643 (2) 649 B (2) 641 (2) 645 (2) 647 (2) 639 (2) 637 (2) 641 (2) 643 (2) 633 (2) 635 (2) 631 A (1) 631 B (1) 631 C (1)
Lighting retrofit in common areas at 13-100 Mission Main
replace back flow, install water heater
replace boilers and water heater
Wire new heat/hot water boilers and pumps
remove and replace roof
Plumbing Permit · PLUMBING · Jul 29, 2026