Building permit intelligence · Boston, MA
550 Huntington Av has 196 municipal building permits on file in Ward 4. The latest recorded activity was a intren permit dated Jul 15, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 6 mapped permits within 2 km of this address.
Renovations - Interior NSC
Plumbing
Plumbing
Electrical
Electrical
Plumbing
6 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Huntington Av with municipal permit records in Boston.
This address has 196 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 550 Huntington Av is dated Jul 15, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 550 Huntington Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Electrical
Gas
Plumbing
Gas
Plumbing
Gas
Plumbing
Plumbing
Plumbing
Demolition - Interior
Demolition - Interior
Demolition - Interior
Other
Other
Other
Low Voltage
Low Voltage
Low Voltage
Low Voltage
To Provide temp power via generator for the Wentworth Concert on the Quad on 9/11-12/2025
S24-955. Furnish and install electrical infrastructure and circuitry.
Maintenance of Switchgear
Replacing an existing steam AHU with a gas AHU on the roof of Beatty Hall (971695-202).
Install temporary 100x180 & 10x10 tent to be used for Wentworth's August Commencement. Installed as early as 8/12. Removed by 8/23. Event date 8/17/24
Low Voltage - 555 Huntington Ave - Camera Add
Provide 2 x 300kVA portable, diesel generators (277/480V) and all associated outdoor rated portable electrical distribution equipment for sound, lighting and all production equipme…
Perform Annual Maintenance Dobbs Hall
Perform Annual Maintenance Willson
Perform Annual Maintenance Wentworth Hall
Perform Annual Maintenance Rubenstein Hall
Perform Annual Maintenance Williston Hall
Perform Annual Maintenance Power Plant
Perform Annual Maintenance Watson Hall
Perform Annual Maintenance Kingman Hall
Low Voltage - Wentworth Institute of Technology - Annex East Handicap Reader
Temporary generator for Wentworth Commencement 4/20/2024
Install temporary 40x100 tent used as a seasonal gathering space. Installed ASAP. Removed by 10/20/2024
Install temporary 100x140 &; 10x10 tents to be used for Wentworth's Commencement. Installed as early as 4/15. Removed by 4/24. Event date 4/20/24
Install (6) temporary 170,000BTU heaters each connected to (1) 100lb propane tank. Installed as early as 4/15. Removed by 4/24. Event date 4/20/24.
Installation of energy meters for electrical mains for 6 different buildings on the Wentworth Institute of Technology campus.
This Permit is for Building 1 Power Plant. We are doing a lighting retrofit throughout the plant
This permit is for Building #8, Beatty Hall. We are performing a lighting Retrofit.
This permit is for Building #7 Wilson. We are performing a lighting Retrofit
Low Voltage - Wentworth Hall - Elevator Update Camera
Install (2) temporary 330KW generators used to power AC Units cooling temporary tent. Installed by 8/18. Removed by 8/25. Event date 8/20/2023.
Install temporary 100x180 &; (6) 10x10 tents used for Wentworth's commencement. Installed by 8/18. Removed by 8/25. Event date 8/20/2023.
Perform Annual Maintenance Willson Hall
Perform Annual Maintenance Wentworth hall
Perform Annual Maintenance Rubenstein Hall
Perform Annual Maintenance Williston Hall
Perform Annual Maintenance Dobbs hall
Perform Annual Maintenance in power plant.
Perform Annual Maintenance Watson Hall
Perform Annual Maintenance Kingman Hall
This permit is for Building 2A Rubenstein. We are performing a lighting Retrofit
This permit is for Building #6 Kingman. We are performing a lighting retrofit.
This permit is for Building #2 Williston. We are performing a lighting retrofit throughout.
This permit is for Building #18 IRA Allen, We are performing a lighting retrofit through out.
This permit is for Building 4 Dobbs Hall. We are performing a lighting retrofit
This permit is for building 3. We are performing a lighting retrofit on all floors
Temporary generator power for Wentworth Commencement on 4/22/23
Install temporary 40x100 tent used for outdoor gathering space at Wentworth. Installed by 4/28/2023. Removed by 10/28/2023.
Install temporary 100x140 and (3) 10x10 tents used for Wentworth's Commencement ceremony. Installed as early as 4/17/2023. Removed by 4/28/2023. Event date 4/22/2023.
Install (6) temporary 170,000BTU heaters each connected to (1) 100lb propane tank. Installed 4/20. Removed 4/28. Event date 4/22/2023.
Low Voltage - Beatty Hall, My Zone Glass Door Card Reader Add
Add (6) data locations in new renovated Coffee & Bagel Area
Renovation of existing Conference Room at Beatty Hall. Electrical lighting, power renovation work.
Renovation of existing Conference Room at Beatty Hall. fire alarm renovation work.
Install waste, hot water, cold water, & vent piping for (1) floor drain, (1) floor sink, (1) hand sink, (1) kitchen sink, (1) grease trap, (1) espresso machine, & (1) Pentair water…
Renovations of existing space on the 1st Floor for a new Bagel/Coffee Cafe Station. Work includes removal of finishes, drywall, patching, painting, flooring, ceilings, HVAC, Plumbi…
shutdown with Eversource for maintenance & testing to the switchgear
Low Voltage - Willson Hall - Room 7-103A Card Reader
Low Voltage - Rubenstein Hall Room 203 Panic Button
Low Voltage - HR Office Panic Buttons
Low Voltage - Office of DEI Duress Buttons
Low Voltage - Beatty Hall - Food Service Cameras
School &; ATM.Certificate of Use for Beatty Hall.ALT1323402 Issued May 3, 2022
Wentworth Beatty Hall - Food Service Renovation. 550 Huntington Ave. Misc. Low Voltage HVAC Control Wiring. JG - 220683
Furnish and install (6) New Cat 6 Cables Relocate 10 Existing Cat 6 cables
Install (2) temporary 300KW generators used to power AC units cooling temporary tent. Installed 8/19. Removed 8/22. Event date 8/21.
Install temporary 100x180, 20x20, 15x15, and (3) 10x10 tents to be used for Wentworth's Commencement. Installed by 8/19. removed by 9/2. Event date 8/21/22.
Provide electrical service to a monitoring system to regulator and monitor natural gas pressures
Renovation of existing food servery area at Einstein Area. fire alarm renovation work.
Renovation of existing food servery area at Einstein Area. Electrical lighting, power renovation work.
WIT - Watson Hall. Power feed for AHU-1, RF-1, (4) CUHs , install (2) Duct smoke detector. JG - 220474
Please delete this application
Connect to existing gas main and install new gas piping to serve an oven, fryer, & range that will be used by Wentworth's Beatty Hall Food Servery on Level 1.
Demolish existing kitchen waste and vent piping. Clean & remove grease traps. Install new kitchen waste, vent, domestic water, sanitary piping, floor sinks, & grease traps for the…
Renovation of existing food servery area at Beatty Hall. Electrical lighting, power renovation work.
Renovation of existing food servery area at Beatty Hall. fire alarm renovation work.
Wentworth Institute of Technology - Beatty Hall -; Renovation of existing Food Servery.; Work includes removal of finishes, Drywall, Patching, Painting, Flooring, Ceilings, replace…
Removal of interior finishes in existing Servery. Cost of work covered in Permit ALT1323402.
Install (7) temporary 170.000BTU heaters each connected to (1) 100lb propane tank used to heat temporary tent. Installed as early as 4/19/22. Removed by 5/10/22. Event date 4/30/22
Install temporary 40x100 tent to be used for outdoor gathering space. Installed 4/1/22. Removed 10/1/22
Install temporary 100x180, 20x20, 15x15, and (3) 10x10 tents to be used for Wentworth's Commencement. Installed as early as 4/19/22. Removed by 5/20/22. Event date 4/30/22
We are installing a small amount of Audio Video equipment in two new classrooms being renovated on the 4th floor of Beatty Hall (existing building) at WIT to include ceiling speake…
60 Amp 120/240 volt feed to new Verizon Small Cell Huntington Ruggles MA
Low Voltage - Beatty Hall Two Additional Duress Buttons
We are installing a small amount of AV (Audio Video) equipment in two small conference rooms and a workshop area in what will be the new "Success Studio" (guidance counseling) reno…
550 Huntington Ave. WIT - Success Studio. Misc. Low Voltage HVAC Control Wiring - JG - 219887
550 Huntington Ave. WIT - Wilson Hall UV Replacement. Misc. Low Voltage HVAC Control Wiring - JG - 219888
Install temporary 100x140 and 20x20 tents to be used for Wentworth's August commencement ceremonies. Installed as early as 8/10/2021. Removed by 9/11/2021. Event dates 8/21 & 8/22.
Temporary 40x100 tent which is already installed. New removal date 12/3/2021. Tent is exactly the same as SF1180889.
Install temporary 500KW generator to be used to power temporary cooling equipment for temporary tent. Installed as early as 8/10/21. Removed by 9/1/21.
Perform Annual Maintenance
Perform Annual Maintenance Williston Hall
Perform Annual Maintenance in Rubenstein Hall
Perform Annual Maintenance in Wentworth Hall
Perform Annual Maintenance in Dobbs Hall
Perform Annual Maintenance in Watson Hall
Perform Annual Maintenance in Kingman Hall
adding a card reader, security camera, and intercom
.Run pipe and wire in parking lot for electric gates
Install temporary 40x100 tent to be used as additional classroom space. Installed as early as 5/7/2021. Removed by 8/15/2021.
Install temporary 80x220 tent to be used for commencement ceremonies at Wentworth. Installed as early as 4/16/2021. Removed by 5/21/2021
Low Voltage - Williston Hall - President's Suite Door - Duress Button w-Door Release Buzzer
wire air handler and associate equipment
yearly maintenance
yearly maintenance Dobbs Hall
yearly maintenance Kingman Hall
yearly maintenance williston
yearly maintenance Rubenstein
yearly maintenance Wentworth hall
yearly maintenance Watson Hall
yearly maintenance Willson
Converting existing men’s room into gender neutral bathrooms
Wentworth Institute Technology Evans Hall: replace existing elevator cab camera with new IP camera within the cab.
Wentworth Institute of Technology Campus: Replace (7) Blue Strobes on Talk a Phone Emergency Phones. Replace (3) Aiphone Emergency Phones found after recent preventative maintenanc…
Wentworth Institute of Technology - Winston Hall: Install (8) panic buttons mounted under desks
Wentworth Institute of Technology - Wentworth Hall: Install (1) new panic button at Main entrance reception desk.
Install temporary 40x100 frame tent. To be used as a common area for Wentworth Institute of Technology. Installed 7/24/20. Removed by 12/4/20
Wentworth Institute of Technology: low voltage wiring to replace (5) existing cameras found to be inoperable during recent scheduled preventative maintenance.
Wentworth CoGen low voltage HVAC control wiring 208622 AG
1st floor bathroom upgrade/repairs/replacement. No change to, sprinkler/fire system. Repair/replace doors, tile, partitions, fixtures, ceiling grid/lighting and bathroom accessorie…
Wentworth Institute of Technology: Realign pole camera at Parker street.
Low Voltage - Willson Hall Door 200 Move to Door 201
Wentworth - Beatty hall Kitchen Hoods; low voltage HVAC control wiring - 208253 - KG
Wentworth's President's Suite power and control wiring for (2) FCU's
Install 15x30, 9x30, 20x40, 20x30, and 9x12 temp tents. Installed 10/16, removed 10/18, event date 10/17.
Move air conditioner outlet 15"
Horn Strobe for the EFA portion, 2 lights and 2 exit signs will be on the electrical permit. Northeastern University Library
2 lights and 2 exit signs in the Northeastern Univ library,
Glass Partition/storefront installation, new glass handrail, new light fixtures, new exterior decking for roof deck.
Demolition of existing millwork, flooring, and glass storefront.
Install door contacts/mini horns on designated roof doors opening to the roof, Wilson Hall,Kingman Hall, Evans Way, Rogers Hall,Edwards Hall, Rec Ctr,Baker Hall (2) hatches, Annex…
add (20) duplex rec (surface mount) add (39) 2x4 LED drop in (ACT ceiling)
Selective demolition, new ceiling, doors, lighting, painting &; flooring in 3 existing classrooms. work performed in Wilson hall / 2nd fl;
Wentworth Dobb's Hall - Server Room AC, Power for two 30 amp split systems. - FGK, 197347
YEARLY MAINTENANCE Buildings 27 are 7AN- 9VAN-15VAN-60LP-62LP-66LP-68LP
YEARLY MAINTENANCE REPLACEMENT
EDUCATIONAL AND DORMATORY #12-16
EDUCATION AND DORMATORY #11-17 MAINTENACE
College Buildings #18-24
Replacement for Buildings #1-10
Replace Kirk Key Interlock at Eversource Station 578 switchgear owned by Wentworth Institute of Technology
remove existing flat roof system , install new modified bitumen roof system
Install 100x220, 9x40, and 9x10 temp tents for commencement. Installed 4/19-4/24, removed by 4/30, event date 4/28
Install (6) 170,000BTU heaters each w/ (1) 100lb propane tank. Installed 4/19-4/24, removed by 4/30, event date 4/28
Adding light and power for conference room and audio visual wiring.
Wentworth - Cogen, Misc low voltage HVAC control wiring - JAG, 186047
On Outside Quad: Erect 12 Nov and remove 15 Nov 2018: Temporary Tent 40'x100';capacity total 199 for use 14 Nov// Ribbon Cutting CEREMONY ON MAIN QUAD. INCLUDES PRE-FAB STAGE 8'x8'…
replace existing outside light poles
Low voltage wiring to install (1) Auto Opener on the door at end of corridor 572. Door will be fitted with electric lockset to operate on a schedule.
Wiring for installation of a 22KW photovoltaic systems located on the roof.
Low voltage wiring to install new 17 Door Access Control System & (7) Camera Video Management System Administration Bldg. Basement: Access Control (2) doors Video: (1) camera. Firs…
Installing two 15KV feeders to an Eversource manhole for new switchgear that will be installed by others.
Cutting into a valve to install a valve into the gas line.
Wentworth - Chiller Plant Upgrade, Misc. Low Voltage HVAC Control Wiring - JAG, 175253
Demolition of gas piping from chillers to gas meters, on 1st floor.
low voltage wiring to install card reader at room 207A in Ira Allen Building
Installation of (2) 600 ton chillers feed from an outside power zone center. Upgrades of chiller plan include lighting & pumps, reefed FP
Upgrade of chiller plan include fire alarm devices
Partial demolition of 75' of radial brick chimney at power plant
Central Plant Chiller Upgrade and New Electrical Service - Remove &; Replace Water Pumps &; Piping - Remove &; Replace Water Coolers - Upgrade Electrical Services - Upgrade Fire Al…
INSTALL ONE NEW LIGHT FIXTURE AND FOUR DUPLEX OUTLETS
Demolition of two concrete block interior walls and installation of one interior borrowed lite frame. New paint and floor patching along with misc. electrical relocations
Install new loudspeakers, amplifers, wiring and conduit in gymnasium.
wiring to program and install auto operator door power opener at dobbs hall
wiring to program and install auto operator door power opener at kingsman hall
Installing 1-110v 20 amp circuit and door controls for auto door opener.
Install 1-20 amp circuit and controls for automatic door opener
Erect 20 JUN 2017 and remove 22 JUN 2017: Temporary Tent 30'X80' capacity total 199 for use 21 JUN// GROUNDBREAKING CEREMONY ON MAIN QUAD. INCLUDES PRE-FAB STAGE 12'X20'X24" WITH 2…
Wentworth - Watson Hall Split Systems - Power wiring, 2 small AC Units - FGK, 174721
Maintenance testing of Eversource STA578 Switchgear owned by Wentworth Institute of Technology
Short Form Bldg Permit · INSUL · Jul 20, 2026