Building permit intelligence · Boston, MA
360 Huntington Av has 195 municipal building permits on file in Ward 4. The latest recorded activity was a electrical permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 4 mapped permits within 2 km of this address.
Electrical
Electrical
Low Voltage
Electrical
Electrical
Low Voltage
4 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Huntington Av with municipal permit records in Boston.
This address has 195 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 360 Huntington Av is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 360 Huntington Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Electrical
Plumbing
Low Voltage
Low Voltage
Plumbing
Low Voltage
Fire Alarm
Annual Maintenance
Electrical
Electrical
Fire Alarm
Low Voltage
Generators
Electrical
Low Voltage
Replacement of existing Generator & ATS. Scope includes removal of interior generator and installation of new exterior generator on concrete pad. Structural steel required to suppo…
Interior/Exterior Work
Renovations - Interior NSC
Electrical
Renovations - Interior NSC
Electrical
Low Voltage
Plumbing
rework existing power to new replacement AHU and new panel to replace existing.
Annual Electrical Maintenance Permit - Northeastern University - Boston Campus
Demolition - Interior
Low Voltage
Install power and lighting to new Gender bathroom per plans. Richards building $t Floor
Fire Alarm
Interior/Exterior Work
Plumbing
Campus-wide security upgrades at buildings across Northeastern University. Installation of card readers, door contacts, electric locks, security gates, and blue phones. Raceways fo…
Adding 1 outlet for new water Jet. Richards Hall, Basement.
Low Voltage
Work to be performed at Northeastern University - 2 Spear Place one temporary 480V power feeder to a compact dumpster.
Plumbing
Annual Electrical Maintenance Permit
Renovations of existing space for new Halal Shack. Work includes removal of finishes, drywall, patching, paining, millwork, HVAC, Plumbing and Fire Protection work.
Plumbing
Plumbing
Gas
Low Voltage
Interior/Exterior Work
Low Voltage
Low Voltage
Low Voltage
Electrical
Low Voltage
Low Voltage
Install 52 Category 6 cables for network connections - 2nd Floor Student Center.
Running EMT conduit, wiring new boiler and pump
Site is Northeastern University. We will excavate, and install 5 concrete footings for Artwork on Campus
provide wiring for 1 environmental room
Installation of solar panels and inverter for rooftop system
Installation of a Main Steam Meter Room and four (4) new steam Pressure Reducing Valves stations in three (3) adjacent buildings. Work includes installation of new steam supply and…
We are providing 2 - 50kw generators (1 is a backup) to power lighting for The Joy & Light Event that is taking place at the Krentzman Quad at Northeastern University on 12/6/23.
Rooftop Solar PV system, 157.78 KW DC and 120.00 KW AC. There are (322) PV modules with UNIRAC GRIDFLEX ballasted racking system. (1) 120.0 KW Solaredge SE 120KUS and (161) Solared…
Installing AV equipment in a classroom/ workplace setting.
Disconnect existing fire pump controller and fire pump. Connect new fire pump controller and fire pump. Disconnect existing jockey pump controller and jockey pump. Connect new jock…
Replace the existing electric fire pump, fire pump controller and associated valves/fittings/piping. New pump and controller to be installed and online before removal of the existi…
install 1 ice maching
Removing and re-installing/re-piping Gas Booster and Gas Generator.
Installing and piping 10 new roof drains and replacing 26 existing roof drains
NEU, Hastings Hall Classroom Phase 2 320 Huntington Ave, Boston Ma 02115 Misc. Low Voltage HVAC Control Wiring KG - 231450
OME#23-088 NU Curry After Hours - 360 Huntington Avenue. Furnish and install fire alarm devices, wiring and programing per engineers drawings.
OME#23-088 NU Curry After Hours - 360 Huntington Avenue 10F. Furnish and install electrical lighting, devices and wiring per engineers drawings.
Power and low voltage wiring at (3) auto operated door locations. Install UPS modules in line with circuitry.
Installing audio-visual equipment in an educational setting.
Installing Audio Visual equipment into an educational environment.
Replacement of air cooled chiller with new chiller to match existing capacity.
Replacement of two existing rooftop air handling units with new units to match existing capacities.
Annual Electrical Maintenance Permit - Northeastern University - Boston Campus
Select Demo of an existing storage area that includes removing a CMU wall and closet, acoustical ceiling, lighting, electric devices and baseboard heat.
Install 130 Data locations around campus.
Install 12 Data locations on the 4th floor.
Replacement of existing exterior doors at (2) Vestibules entering the Marino Center. Work includes glass and glazing and minor electrical work for connections. No sprinkler work.
temporary grounding of 20KW generator event 4-20-2023 event at northeastern university - centennial commons
The work will include selective demolition, electrical , plumbing , framing etc.
Renovation at Northeastern University Snell Library. Adding 3 single use bathrooms, installing new fixtures in café/kitchen areas, and moving a duplex pump in the basement.
Tel/Data, Soundmasking Cabling, Security Cabling(only) for the NEU Snell Library Renovation.
Erect temporary structure(s) "Northeastern U Festival of Light and Joy" 12/7/2022 (4) 10-13' weighting lighting towers
We are providing 2 - 50kw generators (1 is a backup) to power lighting for The Joy & Light Event that is taking place at the Krentzman Quad at Northeastern University on 12/7/22.
Install 30 Data locations around the campus.
Labs, Class rooms, School, Library, OfficesCertificate for: Office(s) Mail Center - Lobby AreaALT1350132 issued 8/22/22
grounding of 75KW generator to power sound on stage -- event is 10/3rd
NEU PH Systems Integration. Misc. Low Voltage HVAC Control Wiring. KG - 220743
Annual Electrical Maintenance permit Northeastern University Boston campus
Roof level add 2 notification devices, 1 system smoke detector and 1 pull station.
Renovations of existing COVID Testing Center to Mail Center in lobby area. Work includes removal of finishes, Drywall, Patching, painting, ceilings, flooring, HVAC, Electrical, Fir…
Dodge Hall Install TVs, Cameras and Speakers
Forsyth Building TV, Speaker and Camera installs
Snell Bldg - Install TVs, cameras and speakers.
Install lighting and outlets per plan. Install wiring for 1 handicap lift. Richards Room 440C
Install 3 alerting devices. Richards building Room 440C
Northeastern University has awarded Acella Construction a contract to provide renovations and repairs to the Cabot Center at 400 Huntington Avenue, Boston, MA 02115. The work will…
Northeastern University Curry Center Second Floor Room 222 - Demo existing lighting (8 Lights). Install temporary lighting. Install (QTY. 8) New LED Lights. New Dimmer Switch.
Install Alerton Building Automation Controls - 360 Huntington Ave. Boston MA 02115
Install 25 Voice/Data locations throughout the west side campus.
NEU, Snell Library Stair Renovation. Misc. Low Voltage HVAC Control Wiring. KG - 220692
Work to be performed is selective demo
Installing new security cameras on the exterior of multiple buildings on the west campus of Northeastern University. Conduit, cabling, and power by others.
Install conduit for power and low voltage cable to 9 Blue Safety Phones. Power circuits will be originated from the inside of buildings to the exterior phone locations.
Renovations of Sorority Room 222, renovation work includes new flooring, new ceiling tiles, new lights, painting and misc. carpentry.
Northeastern University has awarded Acella Construction a contract to provide selective demolition associated with the Chem Waste Storage space, NU project 140317, 120 Forsyth Stre…
Removal of finishes of existing space at the Marino Center to prepare for new Mail Center.
Tel/Data Cat 6a Cabling for the Wireless Refresh Project
Labs, Class Rooms, School, Library, OfficesCertificate for: Office(s) 4th floor.ALT1189844 issued 5/10/21
Installation of temporary boilers.
Provide power for (2) temporary steam boilers East and West sides of building.
We will be providing 2 - 50kw generators (one is a backup with auto transfer switch) to power lighting and audio for a one day holiday event happening on 12/9/21. Set up will start…
include selective demolition, and new finishes, mechanical, electrical, and plumbing fp/fa
install 1 sink NU richards Hall suite 115
Install 6 new V/D locations and relocate 12 existing V/D locations.
Install 1 Detection device and 4 alerting devices Richards 115
Install lighting and outlets per plan
NU Richards Hall - Installation of façade lighting.
Demo in conjunction with permit application ALT1257019
install 1 back flow preventor
NEU, Mugar 4th Floor - Cosmo Lab. Misc. Low Voltage HVAC Control Wiring - KG - 219953
Install 85 V/D Cat6 locations
Northeastern University, Richards Hall, 4th Floor HVAC controls wiring.
Erect Temporary 'Double-Decker Bus' wall structure Snell Quad, Northeastern University Sept 12, 2021 19' 6" x 7' 6" x 12' high
install 9 drinking fountain on the 4th floor @ 360 Huntington Ave
Richard's Hall - Install an additional new 4,000 amp service to building consisting of : duel 15KV switch, 2500 KVA transformer 13,800 V to 480 V, new 4,000 amp switchboard, and ro…
Install new video monitors in West Village H room 212.
Hayden Hall - Install new feeder, conduit and conductors for 10 branch panels
Construction scope consists of replacement and upgrade of existing rooftop chillers w/ new equipment that will serve the currant and future cooling needs of the building.eplan;
annual electrical maintenance permit
NEU, Hayden Hall - Classroom Refresh. Misc. Low Voltage HVAC Control Wiring - KG - 219766
Low Voltage HVAC DDC Controls
Demo and abatement of CMU partition walls, drywall walls, ceiling grid and floors.NO SPRINKLER OR FIRE ALARM.
Reinstall existing audio-video equipment into refinished classrooms in Hayden Hall. Rooms 221,222,321,322,424,425
Install 64 Cat6 data cables, 16 AV cables and 8 fiber cable to 2 classrooms.
install new audio-video systems into Richards Hall rooms 253/254.
Classroom(s) remodel, and replacement of existing panels utilizing existing feeders.
Office Renovation - Furnish/Install lighting, controls, poke thru's, & receptacles; utilize & relocate existing panels; power & disconnect; provide, install, wire, program & test n…
Office Renovation - Furnish/Install lighting, controls, poke thru's, & receptacles; utilize & relocate existing panels; power & disconnect; provide, install, wire, program & test n…
Classroom Renovation - Furnish/Install lighting, controls, poke thru's, & receptacles; utilize & relocate existing panels; power & disconnect; provide, install, wire, program & tes…
Classroom Renovation - Furnish/Install lighting, controls, poke thru's, & receptacles; utilize & relocate existing panels; power & disconnect; provide, install, wire, program & tes…
Northeastern Univ. building, advance work on new chiller replacement, investigate new piping routes to roof, start elec infrastructure. Full chiller replacement permit will be file…
to install 7 roof drains @ 360 Huntington Ave
to cap off gas pipe
to install 1 sink and 1 WH on the 4th floor of Richards Hall
Northeastern University - Richard's Hall - 2nd Floor -; Selective demolition of interior finishes, on 2nd level. New classroom layout w/ new finishes, rework existing MEP's, FA/FP.…
Curry Center Roof Replacement - Work to include demolition and replacement of existing roof. Minor interior renovations associated with the roof replacement and replacement of exis…
Renovation to 4th floor office suite, minor interior demo, new DW offices, ACT, finishes, MEP's, FA/FP
Erect April 19, 2021 and remove after June 20, 2021 Provide 1 Temporary Tents Each 20’x40’ (capacity 19each) No sidewalls. For Covid19 compliance per CDC guidelines
Snell Library roof, Install (6) horn strobes, & 2 pull stations on roof to existing fire alarm system.
Snell Library Roof, Install (8) wallpack LED light fixtures & 5 WP exit signs on roof.
Boston Fire House upgrades at 550 Huntington Avenue, Engine 37
Removal of existing Chiller and install of new Chiller
Labs, Classrooms, School, Library, Offices Certificate for: Classroom - Richards Hall Basement Level Alt106349 - 6/5/20 ;
Northeastern University - Curry Center - Roof Replacement.
Addition of two exterior water proof fire alarm speaker strobes.
Addition of two exterior exit signs and 2 WP speaker strobes.
Labs, Classrooms, School, Library, Offices Certificate for: Classrooms;Hayden Hall basement level - room #'s 009D, 009B ,009G &; 009H - only Alt1049301-2/14/20 ;
Installation of low voltage wiring and devices associated to security scope of work for the NU project 190110 in the basement of Richards Hall on the Northeastern University campus…
Install wiring for new IT rooms in the following buildings to support the streaming classrooms at Northeastern University: Ryder Hall, Richards Hall, Dodge Hall, Forsyth Building,…
NEU, Snell Library - Existing Bathroom Renovations-360 Huntington, Boston. Low Voltage HVAC Control Wiring - KG - 209079
Installation of a new IT closet that will serve the AV needs for Richards Hall.
Northeastern Curry hall - Ice maker replacement
Install new monitor modules on levels 00, 01, 02, 03 for (1) added tamper switch per floor. Install (2) new monitor modules on penthouse level for tamper and flow switches. Install…
Program new DD for new hvac unit that is installed
Install 29 V/D locations
install a new audio-visual system in Hayden Basement Classroom
Non structural and non life safety renovation to animal hold rooms. Renovations include removing a non bearing demising wall, moving a door opening , replace drywall ceiling, addit…
Install 12 Cat6 cables and 7 AV cables to 19 classrooms
Northeastern Classroom Tech Upgrades, low voltage HVAC control wiring NPB - 208883
Take down existing lights & ceiling devices to allow mechanical contractor to install new HVAC unit. Wire new HVAC unit with MC Cable feed
Install new power for kitchen self serve equipment
My Way Cafe Kitchen Program A - Kennedy Health Careers low voltage HVAC control wiring 208712 - JC
Install Alerton Building Automation System
Interior renovation of lab with painting, with minimal electrical, HVAC and plumbing
Renovations to existing space for a new COVID testing center for symptomatic patients. Work includes upgrades to finishes and all MEP trades.
NEU Hayden Hall Chiller Replacement, low voltage HVAC control wiring KG 208611
NEU Mugar Lab 313 Radiant Heating Panel, low voltage HVAC control wiring 208458 KG
Replace (2) existing and add (4) new lights in basement of Hastings hall, Install (2) new quad 120 volt 20 amp outlets in basement for sump pumps & general maintanence use. Install…
Tennant fit out / remodel of basement area (Capstone) in richards Hall Northeastern University
Remove / relocate and add new fire alarm notification devices in the basement of Richards Hall (Capstone)
Please see attached scope sheet for full description, furnish and install 495 120volt, 20 amp outlets in 165 different classrooms (3) each, in 16 different locations.
Replace 26 load centers, all receptacles & switches, and light fixtures in dorm rooms only on floors 1 & 2.
Install a new audio-visual system into Dodge Hall room 050.
Northeastern University - Richards Hall - Basement -; Renovations of existing space for;Bioengineering Space. Work includes removal of finishes, drywall, flooring, patching, minor…
installation of low voltage automation system at NEU - Hayden Hall ECE
Plumbing renovation work at 360 Huntington Ave for NEU