Building permit intelligence · Boston, MA
440 Huntington Av has 71 municipal building permits on file in Ward 4. The latest recorded activity was a fa permit dated Jul 9, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 2 km of this address.
Fire Alarm
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Plumbing
4 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Huntington Av with municipal permit records in Boston.
This address has 71 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 440 Huntington Av is dated Jul 9, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 440 Huntington Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Signs
Install conduit in trench and wire new sign.
Low Voltage
Plumbing
Low Voltage
Electrical
Electrical
Interior/Exterior Work
Fast Track Application
Low Voltage
Low Voltage
Plumbing
Fire Alarm
Electrical
Low Voltage
Fast Track Application
The work will include selective demolition, floor coring, conduit, firestopping, and selective drywall patching
West Village H - Office 266 Remove existing millwork & drywall closet; Patch & paint complete; Carpet; Electrical; Install one new sprinkler head to new phone booth.
Low Voltage
Electrical
Low Voltage
low Voltage HVAC DDC Controls
NU West Village H Building. Disconnect existing 50A AC unit. Run new 90A feed from basement to 3rd floor IT room. Reconnect new 90A AC unit.
Install 35 Data locations
Northeastern University West Village H Building - Renovation of class rooms 210A, 210B and 212. Demo/Make safe, New power, New lighting, New 125A Panel.
The work will include selective demolition, gypsum systems, acoustical tile ceilings, flooring, painting, misc HVAC, and misc electrical.
Install lighting and outlets per plan
Install new Tub/Shower valve, connect drain for tub . Install owner supplied toilet and lav sink.
replace shower stall
Construct a fence around the property
Add two small dormers in rear. Add a covered porch/mud room in front of house
There is no work associated with this permit application.;Work was;completed under permit #ALT843163. This application is a request to increase the capacity of the existing assembl…
Install 1 V/D Location in room 316
Install 1 new V/D location
;Residence lobby, Classrooms , Computer Lab, Offices , Office Lounge ;Certificate for (4) Conference Rooms &;;Digital Lab-1st., fl.-Only-;;West Village “H” Building Alt 843163 issu…
Install 1 new V/D location.
Re-wire 2nd level bedrooms(2) : consist of receptacles and lights
Install 10 V/D locations on 1st floor WVH
This project consists of interior renovations to the first floor of 440 Huntington Ave (Northeastern University’s West Village “H” Building). The scope of work includes selective d…
Roofing, siding, interior/exterior work
Install lighting and outlets per plan West Villiage H
Install 3 new alerting devices, relocate 4 Strobe only and relocate 3 alerting devices. West Villiage H
Removal ;of existing non structural partitions and finishes. Work in conjunction with ALT843163.
Demo existing lights and switching. Remove old Wiring Install 8 new 2x2 LED fixtures on dimming controls. West Villiage H Rooms 460 and 461
Install 8 new sixplex data locations and relocate 5 existing locations.
painting and carpet removal.
Installation of new Light Pole and handhole in the sidewalk across the street from 430 Parker street on the corner of Huntington Ave and Parker. (Extenet address 401-431 Parker St)…
Install on demand water heater,water piping
Install furnance,water heater on demand,gas test,replacement
Confirm the Occupancy as a One Family Dwelling - Existing condition - no work to be done -
Put up walls, laundry area, half;bathroom, and storage in basement
Install wiring for 3 curtain heaters in entry ways to Building. Install sub 100amp Panel. WEST VILLAGE H
Change existing panel,wire 6 recess lights,add 8 Receptacle outlet,dryer circuit, laundry circuit, and bath gfci
adding full bath with shower only and washer machine in the basement.
Install 5 V/D locatios
1st floor computer lab alteration
Install 5 new V/D Location and relocate 8
Work includes minor;removal of existing millwork, relocating existing aluminum storefront door, adding new custom millwork desk, interior aluminum storefront, carpet in area of wor…
1Minor renovation to an existing (2,258SF) office suite located on the second floor of the West Village Complex H at 440 Huntington Ave, Boston. Renovation includes selective demol…
2nd Floor Office Renovation
Remove and reinstall sink on the 2nd floor
install 5 swithes old work and install 8 new 2x2 lights and 2 new ressessed lights
Renovation of TV Studio Northeastern University Shillman Hall - New 150A MLO panel using existing feed. Misc. lighting and switching relocation.
Finish carpentry, new storefronts, minor MEP and HVAC modifications.
West Village H.Room 472. Install 2 switches and 1 receptacle. Install 3 partition feeds,