Building permit intelligence · Boston, MA
700 Albany St has 125 municipal building permits on file in Ward 8. The latest recorded activity was a intren permit dated Jul 10, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Renovations - Interior NSC
Plumbing
Electrical
Electrical
Electrical
Electrical
1 mapped permit within 2 km, shown on the intelligence map above.
9 other addresses on Albany St with municipal permit records in Boston.
This address has 125 permit records in PropertyLabs' public history and is located in Ward 8. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 700 Albany St is dated Jul 10, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 700 Albany St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Other
Other
Other
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Low Voltage
Renovations - Interior NSC
Low Voltage
Renovations - Interior NSC
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Electrical
Low Voltage
Low Voltage
Plumbing
Plumbing
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Power wiring for new and replacement HVAC equipment and hot water heaters. Modification of existing panels, switchboards and circuit breakers to support new equipment. Modification…
Lab & Office Renovation. 2nd Floor. Fixtures provided by others.
Low Voltage
Low Voltage
Disconnect/Reconnect new cage washer
Plumbing
Plumbing
Plumbing
Installation of a low voltage wireless burglar alarm system
Renovate 7th Floor Cage Wash room 726. Select demolition of Ceiling, cage washer, plumbing, exhaust duct and electrical services to existing cage wash. Furnish new exhaust valve, d…
Renovations to 8th Floor Lab in room 843. Select demolition of Ceiling, fume hood, exhaust duct and lights. Furnish new exhaust valve, duct and extraction arm. Repair drywall ceili…
Minor renovations and rearrangement of existing lab and office spaces in W Building, 2nd Floor to accommodate relocation of Wolozin Lab. This work includes relocating / adding powe…
BUMC 700 Albany 5th Fl QUI Lab. Misc. Low Voltage HVAC Control Wiring. PG-242314
Low Voltage HVAC Control Wiring for Cryo EM Project. 8 VAV's and 1 packaged AHU
Installation of six data outlets with or without fiber optic cable in BU building W1.
Mechanical upgrades to include the replacement and reconfiguration of air handling units, installation of roof exhaust system and minor MEP upgrades as needed as per plans. Work on…
Select interior demo in penthouse. All work and cost reflected on ALT1518653. INTERIOR work only.
Installing 1 - Lab Sink / 1 - Emergency shower on 1st floor CRYO EM
Installation of card access and camera devices for security purposes for the Cryo Lab project.
install new Cryo lab at BU.
Install new fire alarm for remolded lab at BU 1st floor.
Boston University is planning on renovating approximately 1,200 square feet of space on the first floor of 700 Albany Street. The existing space is currently classified as a Use Gr…
retrofit replacement of Simplex 4120 fire alarm electronics and power supply to 4100 series
retrofit of simplex 4120 electronics and power supply to 4100
Installation of handsink, flushing floor drain, bfp-protected water line to humidifier, hose bibb
DMC107X - provide electrician labor and material for mounting lighting controls. scope includes installing sensors, alarms, and override controllers.
DMC107X - Demo old lights, and install (6) new LED dimming lights.
Renovate 9th Floor Room 908. Select demolition of existing ceilings, lights, Mechanical & Electrical Systems. Install new ceilings, patch flooring, paint walls, new lighting and di…
BUMC 700 Albany Street Upgrade. Misc. Low Voltage HVAC Control Wiring. PG - 231326
Rewire 10 Doors back to the panels in W Building for security purposes.
BU's Center of Advanced Biomedical Research - Replacement of powered temperature control system on floors 1-9 with a new electrically actuated DDC temperature control system. The w…
demo water to existing tunnel washer. Install new floor sink. Reconnect water
Educational replacement Other - lab sink
Educational renovation Other - gas turret
Interior renovation of room 839. Work includes removal of existing metal casework, repair of existing drywall, new flooring, painting, and re-working HVAC supply and return.
Work includes demolition of existing lab tunnel washer machine, replacement of existing flooring, re-painting, new exhaust duct work, new plumbing condensate lines, replacement of…
switch gear maintence
The job scope includes creating a new door opening, relocating electrical outlets, removing 2 existing sinks, replacing ceiling tiles, and patching VCT floors. Patching of drywall…
Selective demo of finishes in room 634. Furnish and install new flooring, humidifier unit, VAV box, two new lights, HVAC DDC controls, and re-install existing stainless steel casew…
Work in 9th floor corridor. Selective demo of walls (no load bearing), new partitions, replacement of ceiling tile & lights, painting, 2 new doors, new epoxy flooring in selective…
Caulking band around top of parapet wall on the building to correct leaks.
Research, Retail &; Wireless Communications C/O-For Retail Store alt 464271 issued 9/17/15
INSTALLATION OF ONE PROJECTION SIGN AND ONE WINDOW SIGN FOR BANK OF AMERICA: 1-5" H X 2'-4" W NON-ILLUMINATED PROJECTION SIGN WITH STEEL BRACKET MOUNTED TO BRICK, 1'-4 3/16" H X 2'…
Sediment Carbon Filtration
Installing Cat5E cables to 12 data drops at FedEx Office
interior remodle
Door vinyls, interior hanging sign, exterior FEDEX Chanel letter sign, projecting blade sign
Misc Drain work
INSTALL SECERITY SYSTEM.
Interior Build-out of an existing tenant space.
Alteration to portions of the fire alarm system. Alteration will involve (1) strobe booster panel, (1) pull station, (2) Audio Visual and (1) smoke detector relocation.
New wiring in conferance rm / observation rm BU w-7 / location
Remove existing walls. build new wall & soffits. in-fill door opening. Create new door opening. Install new doors, ceilings, flooring , lighting, & cabinets. Rework & add to existi…
7 voice/data locations
Replacement of mechanical cooling equipment due to age. alteration of structural supports for cooling tower.
Re-feed (2) chillers and (4) pumps via new VFD's. Re-feed (2) cooling towers on roof.
"City Convenience" &; "SUBWAY" additional signs :Install 2 signs for Subway and City Convenience to match the existing MassMedic sign; works to be done by the responsible professio…
Legal Occupancy:; Reaserch, Retail and Wireless Communication DOC#4409/2005 COO for 6th floor fish lab ALT263219, Issued: 7/22/13 &; A318233, Issued: 2/12/14
Remove sheetrock walls, Remove ceiling and remove tile flooring
Reconfigure and add doors in corridor
Legal Occupancy:; Research, Retail, Wireless Commununications, ;Subway restaurant and a City Convenience store ALT263219/2013 COO for the Convenience Store &; Subway ALT278626, Iss…
Installation of BRA approved signage (Subway) to replace (City Convenience). Existing ALT number for build out ALT 278626; to be installed by the responsible professional J. Correi…
commercial kitchen
Install 6 voice / data outlets
Install 25 voice and data outlets
Install card access system
internal renovation new lighting
interior renovation
relocate speaker strob to cieling
Renovation of existing space. Convenience Store.
install floor drains and lab sinks for Zebra Fish facility
Change Occupancy- Interior and exterior renovations of existing office space to new combination convenience store and Subway restaurant. Work includes selective demolition, new int…
RElocate one outlet. Add 3 Outlets.
Interior selective demolition of finishes and non-load bearing partitions.
Interior demolition and renovation to include new partitions, interior finishes, MEPs of existing lab area into new research lab, also sprinkler. per plan
install 2 Patterson/Kelly Water Heaters - Penthouse
Fiber optic cable to be run between 700 Albany Street and 650 Albany Street through existing conduit.
installing 2 pattersonkelly steam water heaters
install heat pump install x rad 320 machine install controls
relocate a sink