Building permit intelligence · Bellevue, WA
788 106TH Ave NE has 101 municipal building permits on file in Downtown. The latest recorded activity was a electrical no plan review permit dated Jul 7, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 40 mapped permits within 500 m of this address.
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (16 Speaker Wire)
A Nonresidential New Structure Low Voltage Only Project Involving (2 Speaker Wire), Diversified project 20667
A Multifamily Residential Alteration to Existing Structure Fire Alarm Transmitter
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (55 T-Stat or HVAC Controls), na
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (18 Speaker Wire)
40 mapped permits within 500 m, shown on the intelligence map above.
This address has 101 permit records in PropertyLabs' public history and is located in Downtown. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 788 106TH Ave NE is dated Jul 7, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 788 106TH Ave NE in the PropertyLabs platform, along with alerts when new permits are filed at this address.
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (43 T-Stat or HVAC Controls), 26 101009 BF
A Nonresidential Alteration to Existing Structure Electrical
A Nonresidential Repair or Replacement Electrical Project Involving (5 Heat Trace)
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (1 Telecommunications System), 25 121569 BY
A Nonresidential Repair or Replacement Fire Alarm, 25121569BY / 25121570BY
A Nonresidential Repair or Replacement Low Voltage Only, 25121569BY / 25121570BY
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (144 T-Stat or HVAC Controls)
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (668 T-Stat or HVAC Controls), NA
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only, none
A Nonresidential Alteration to Existing Structure Low Voltage Only, none
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Temporary Service), none
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Added or Altered Branch Circuits), none
A Nonresidential Partial Demoltion Primary Building, 25 121570 BY
A Nonresidential Partial Demoltion Primary Building, 25 121569 BY
20 Story Office Improvement building-out.
25 floors, 600,000 sq. ft. of tenant improvement from new shell and core space involving 1,045 fire sprinklers.
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test), N/A
Closure of sidewalk on 106th and NE 8th. Closure of right hand turn lane on 106th to NE 8th. Closure of merge lane on NE 8th. These closures are for the purpose of installation of…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Receptacles, 1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Light Fixtures)
The project consists of an exterior hanging sculpture supported from the level 5 framing above and a planter on L1. There are (2) new structural beams needed for support - one in t…
Art piece suspended from the soffit on the corner of NE 8th and 106th., 20-109940 LD
A Nonresidential Repair or Replacement Electrical Project Involving (1 Temporary Service)
A Nonresidential Alteration to Existing Structure None Project Involving (1 mop sink)
P3 and P6 addition of storage rooms within the parking garage.
install of exterior non-illuminated blade sign.
A Nonresidential Addition to Existing Structure Electrical Project Involving (3 Light Fixtures)
(2) added storage rooms (1) on P3 and (1) P6. (8) lights (2) switches and (4) receptacles SEQ 101118-3513
A Nonresidential Alteration to Existing Structure Electrical Project Involving (11 Light Fixtures, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Total Sprinkler Heads), 24 101108 BZ
Tenant Improvement of spaces including addition of a storage room and an enclosure of a crawl space within the parking garage of a 25-story office building. Storage room at Garage…
Exterior Signs that Include Building Information and Address, Parking Garage Entrance, and Accessible Wayfinding elements., SA 23118210, SA 23116937
The Artise is a development in Bellevue, Washington. NBBJ (Designer) produced a signage master plan diagram that addresses the potiental character, appearance and location opportun…
Two 6' 5" free standing directional signs and one 6' 0" free standing directional sign, so be installed around the exterior of the building.
Permit for irrigation meters, 20115296UE Permit for 2" ROW irrigation meter, 20 115296 UE. No CRC required.
Permit for 1 1/2" On-Site irrigation meter, 20 115296 UE.
A Nonresidential Alteration to Existing Structure None Project Involving (2 Back Flow Preventer - 1 1/2", 2 Back Flow Preventer - 4")
A Nonresidential Addition to Existing Structure Electrical Project Involving (2 Heat Trace, 2 Added or Altered Branch Circuits), 21 107330 BG
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1000 Heat Trace)
The Artise Project is requesting a noise variance for the early delivery of a mobile crane and erection of structural structural steel requiring impacts to the ROW due to site cons…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Temporary Service)
The Artise Project is requesting a noise variance for the dismantle of our material hoist with a mobile crane., 21 101206 BB
10 foot tall illuminated exterior building ID signs to be installed on the south and west sides of the building.
A Nonresidential Repair or Replacement Low Voltage Only
119/24 KB. .625 coax - 11' pulled through existing conduit.
The Artise Project is requesting a noise variance for the dismantle of our hammer head tower crane, utilizing two mobile cranes on 106th Ave NE between NE 6th St and NE 8th St., 21…
Post Revision # 1: TCP revision - add'l structures will need to be accessed to pull fiber into new switches for Artise project Setup PSE Vaults and Intercept existing 6" feeder off…
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (168 T-Stat or HVAC Controls), NA
A Nonresidential New Structure Low Voltage Only Project Involving (485 Control Wire)
The Artise Project is requesting a noise variance to start concrete placement early and prevent afternoon traffic impacts from a long pour.
The Artise Project is requesting a noise variance to deliver over sized loads to the project ahead of roadway restrictions., 21 101206 BB 1/18/2023 - 2/15/2023 M-F @ 5:30am
Early starts will be utilized to take delivery of steel and place concrete. The scheduled activities require additional traffic control to maintain public safety and the hours that…
Install of a temporary, non-potable, water system for the duration of the Artise construction. System includes a boiler drain on each floor (P6 through roof). Booster pump and expa…
The Artise Project is requesting a noise variance to allow crews to jump the hammerhead tower crane and erect a personnel hoist to support construction activities at 788 160th Ave…
Level 1 concrete placement, start time for traffic control and concrete pump setup, concrete pump will start placing one hour after the start of work., 20 109940 LD
Post Revision # 1: Updated per request of inspector. Added UPO's to sheets 4,5,6 and 7. Starting at existing Zayo Vault on the north side of NE 8th St between 108th Ave NE and 106t…
Closed. No inspections called. Applicant will need to reapply when work is ready to begin. MD* EXT 12/12/22KB. Emergency Follow Up-Crew was called out on 7/19/2022 to retire gas se…
Install (22) DOAS units, rooftop mechanical plant including outdoor heat pump chillers and a mechanical pump/hydronic equipment room, which is used to distribute heated and chilled…
Occupying the E bound lane of NE 8th St to install gas main and service to new construction building at 788 106th Ave NE.
New networked addressable EST3 fire alarm system providing a) smoke control equipment monitoring & control b) smoke detection c) voice evacuation & visual notification d) sprinkler…
Emergency Responder Radio Coverage System
Install (2) rescue air exterior mobile air connection panels, (1) rescue air display module, (1) rescue air monitoring system, (1) rescue air storage system, (6) rescue air CP2 eme…
Set up traffic control, adjust fencing and pedestrian access and set up a 63meter pump for 900 yard footing pour from NE 8th ave using attached and approved Traffic Control Plan. D…
550T Mobile Crane and set up for Tower Crane erection off NE 8th using approved TCP #15 Post revision #8 20 122424 TN.
Erection of Tower Crane from 106th Ave. NE between 108th and 104th using approved COB TCP 12 Date: 3/12/22 6am-6pm and 3/13/2022 6am - 6pm
Delivery and batching of Redi mix concrete materials for site and soil stabilization during fooring and excavating activities. Monday - Friday 2/14/2022-2/25/2022
A temporary covered walkway to be installed on NE8th for pedestrian protection.
Plumbing 25 story office building with 6 floors of underground parking. Shell and core work only with restrooms on levels 1 through 25, and locker room with showers on Level 1. Pro…
Erection of tower crane from 106th Ave. NE using approved TN 20-122424 Post issuance #7 TCP #12 Dates: 1/8/2022 4am - 6pm to 1/9/2022 6am - 6pm.
Tower Crane erection from NE 8th Ave. Using Approved TN 20-122424 Post Issuance #7 TCP #13. . Pre work extended hours is not authorized. Approved ROW permit shall be issued for the…
Dismantle, load, and haul out components of the Mass excavation conveyor off 106th and remove heavy excavating equipment from the site prior to the Holiday travel restrictions. 12/…
Underground fire service main, fire department connections and isolation valve.
Provide Power Service and Distribution, Lighting, Communications, and Fire Alarm for new core and shell 25-story office tower including 6 levels of parking garage-Seq Job#101118
New Construction of a Class A 25 story office tower of approximately 652,759 sf including retail at street level and a 5-1/2 floor below grade structured garage of approximately 92…
**Revised dates are 12/7/2021 - 12/9/2021. This is the erection of our first Tower Crane which will encompass the closure of 106th Ave. NE on 11/13/21 through 11/14/21. On Saturday…
Tower crane and man lift foundations
The Artise is a mixed-use high rise building project which contains a single tower, plaza, and below grade parking. The project will use temporary shoring elements during excavatio…
Two connexes will be used along NE8th to route pedestrians under. These will be used as temporary pedestrian protection and will be removed once overhead hazards are no longer pres…
A Nonresidential Alteration to Existing Structure None Project Involving (1 Floor Drain, 1 Water Service - 4")
Construction of an in ground concrete utility vault at the SE corner of the project site to be permitted early as a BW permit break away from the building BB permit ahead of the BB…
Cut and cap side sewer, 20 109940LD
Early work clear and grade before full project clear and grade work.
Multi-story high rise commercial building with below grade parking. Utilities for proposed project include water, storm, and sewer connections
Shoring activities for a new 25 story Class A office building with a below grade parking structure approximately 5-1/2 levels.
: APPROX 45 CY EXCAVATION IN SIDEWALK. REMOVE CABLE FROM J3 TO J4, J4 TO J5, J4 TO HH1. PULL IN CABLE FROM J3 TO NEW J7, J7 TO X1, HH1 TO NEW J7. SET NEW TRANSFORMER ON X1 AND J7.…
A new 25 story Class A office building of approximately 650,700 gross square feet with retail/active use at the street level and a 5-1/2 level below grade parking garage of approxi…
This BE permit will include demolition of the existing buildings outlined in Site Plan A and a provided Demolition Plan., 12120152
A Nonresidential New Structure Electrical Project Involving (1 Temporary Service)
A new 25 story Class "A" office buildings of approximately 650,313 gross sq. ft. with up to 509,400 sq. ft. of office and 7,532 sq. ft. retail spaces and 5-1/2 levels below grade p…
A Nonresidential Alteration to Existing Structure None Project Involving (1 Back Flow Preventer - 2", 1 Water Service - 2")
Provide (1) 1200A temporary power and (1) 2000A temporary power for new 26-story high rise core and shell - Seq Job#101118
Post Revision # 35: Revised lease Plan. Post Revision # 34: Access sewer manhole located in the northbound left turn lane on 106th Ave. NE. Post Revision # 33: Closure 106th Ave. N…
Lot Line Elimination / Lot Boundary Consolidation
Structural peer review of performance based design office tower.
Electrical No Plan Review · Jul 17, 2026