Building permit intelligence · Bellevue, WA
10401 NE 8TH St has 187 municipal building permits on file in Downtown. The latest recorded activity was a electrical no plan review permit dated Jul 13, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 40 mapped permits within 500 m of this address.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (110 Telecommunications System), 26 100653 BZ
A Nonresidential New Structure Low Voltage Only
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (16 T-Stat or HVAC Controls)
A Nonresidential Partial Demoltion Primary Building, 26 100653 BZ
A Nonresidential Addition to Existing Structure Electrical Project Involving (2 Receptacles, 1 Added or Altered Branch Circuits)
40 mapped permits within 500 m, shown on the intelligence map above.
This address has 187 permit records in PropertyLabs' public history and is located in Downtown. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 10401 NE 8TH St is dated Jul 13, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 10401 NE 8TH St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
A Nonresidential Alteration to Existing Structure None Project Involving (1 Dishwasher, 1 Floor Sink, 1 Kitchen Sink, 1 Water Heater - Tankless, 1 Back Flow Preventer - 1/2", 1 Ice…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (19 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure None Project Involving (3 Floor Drain)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (27 Telecommunications System)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Receptacles, 12 Office Furniture, 6 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (15 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (121 Telecommunications System), 24 111604 BZ
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (1 Fire Alarms), 25 122083 BZ
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (10 Fire Alarms), 24 111988 bz
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System, 1 Telecommunications System)
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (10 Fire Alarms)
A Nonresidential Alteration to Existing Structure None Project Involving (1 Floor Drain, 1 Trap Primer, 1 Back Flow Preventer - 1/2")
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (4 Telecommunications System), WA25120
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (242 Telecommunications System)
TENANT IMPROVEMENT - ADD RELOCATE FIRE SPRINKLERS FOR T.I. WALLS AND CEILINGS. PATRIFP099CF. (38) Heads., 25 122083 BZ
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Security System)
A Nonresidential Partial Demoltion Primary Building, 25 122083 BZ
TENANT IMPROVEMENT OF EXISTING OFFICE ON LEVEL 13 & 14 INCLUDING SELECTIVE DEMOLITIONS, NEW FINISHES, NEW PARTITIONS, CEILING AND DOORS AS INDICATED.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (36 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (260 Telecommunications System)
SELECTIVE DEMO PER PLANS, RELOCATE EXISTING VAV BOXES, ADD DUCT AND DIFFUSERS AND GRILLES, RELOCATE THERMOSTATS, ADD DUCT AND REBALANCE. ADD (4) NEW VAV BOXES, ADD (2) NEW WSHP'S F…
TENANT IMPROVEMENT OF EXISTING OFFICE ON LEVEL 15 & 16 INCLUDING SELECTIVE DEMOLITIONS, NEW FINISHES, NEW PARTITIONS, CEILING AND DOORS AS INDICATED
A Nonresidential Alteration to Existing Structure Low Voltage Only
new elevator lobby doors/hardware and full height walls may have on the building's smoke control system., 24_129903_BZ
Smoke Control analysis to confirm no changes to existing building smoke control system., 25 109481 BZ
SELECTIVE DEMO PER PLANS, RELOCATE EXISTING VAV BOXES, ADD DUCT AND DIFFUSERS AND GRILLES, RELOCATE THERMOSTATS, ADD DUCT AND REBALANCE. ADD (8) NEW VAV BOXES, ADD (2) NEW WSHP'S F…
Smoke Control Analysis to confirm no changes to the existing building smoke control system., 25 109477 BZ
Day 2 project to add 125A MLO Panel.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (260 Telecommunications System)
Replacing Lighting & Controls. Mechanical and Plumbing Connections. Added receptacles. Pathway only for LV systems. FA cabling. Installing added Panels.
Replacing Lighting & Controls. Mechanical and Plumbing Connections. Added receptacles. Pathway only for LV systems. FA cabling. Installing added Panels
Adding a powered stairwell door automatic closure. This powered door closure will be fed from an ATS on P1 that serves the stair pressurization for that stairwell.
Modify existing fire alarm system for tenant improvements. Install (138) devices. This is a joint venture between Johnson Controls Fire Protection (JOHNSCP831PR) and Titan Electric…
Modify existing fire alarm system for tenant improvements. Install (137) devices. This is a joint venture between Johnson Controls Fire Protection (JOHNSCP831PR) and Titan Electric…
DEMO RESTROOMS, SHOWERS, KITCHENETTE PLUMBING, ON LEVEL 15. DEMO BREAK ROOM PLUMBING ON LEVEL 16. PANTRIES: INSTALL SINK, INSTANTANEOUS WATER HEATER, ICE MAKER, COFFEE MACHINE, WAT…
DEMO BREAK ROOM PLUMBING ON LEVELS 13 & 14. DEMO LEVEL 14 WASTE PIPING SERVING LEVEL 15 RESTROOMS. PANTRIES: INSTALL SINK, INSTANTANEOUS WATER HEATER, ICE MAKER, COFFEE MACHINE, WA…
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (1 Fire Alarms), 650801846
A Nonresidential Repair or Replacement Electrical Project Involving (4 Temporary Service)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Intercom and Communication, 1 Cable TV or Closed Circuit TV Coaxial Cable, 1 Speaker Wire, 1…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (3 Control Wire)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (52 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (26 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure RI for Walls Only, 25 116618 BG- Walls Only approved by Chuck Murray
A Nonresidential Repair or Replacement Electrical Project Involving (4 Temporary Service)
Setup traffic control on NE 8th St. to clean top of the sky bridge that goes from Lincoln north to Bellevue Place.
A Nonresidential Partial Demoltion Primary Building, 25 109481 BZ
A Nonresidential Partial Demoltion Primary Building, 25 109477 BZ
Modify existing fire alarm system for tenant improvements. Install (30) new devices. Lincoln Square North. Podium Level 2. Wagyu House. 10401 NE 8th Street Bellevue WA 98004. This…
Floor 27 - Install fixtures for 2 new single occupancy restrooms; install eqpt at beverage counter. Floor 28 - Demo & install new kitchen eqpt. Install fixtures for 2 new single oc…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Temporary Service), 24 111604 BZ
Relocate existing fixtures. Install new fixtures. Install new receptacles. Furniture connections. HVAC and Plumbing connections. New lighting controls. Modify existing panels. Prov…
Installing new Fixtures and Controls. Adding receptacles and furniture connections. Mechanical and Plumbing connections. Altering existing Panels. LV pathway only. Fire Alarm cabli…
Installing New fixtures. Adding receptacles and furniture connections. Mechanical / Plumbing connections. Altering existing panels and adding 100A panel. LV Pathway only. Fire Alar…
A Nonresidential New Structure Low Voltage Only Project Involving (172 Telecommunications System)
DEMO DUCTWORK, EQUIPMENT, AND ASSOCIATED ACCESSORIES IN ACCORDANCE WITH THE DESIGN DOCUMENTS. INSTALL (1) NEW WATER SOURCE HEAT PUMP AND ASSOCIATED PIPING / ACCESSORIES. INSTALL (4…
Level 27: Demo existing plumbing in existing Breakroom. Provide new sink, instantaneous water heater, coffee machine, ice machine and water dispenser, per plan.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (28 Office Furniture)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (15 Office Furniture)
Modify existing fire alarm system for tenant improvements. Lincoln Square North. Level 4. Keystone AI. 10401 NE 8th Street Bellevue WA 98004. Install (31) devices. Joint venture be…
A Nonresidential Alteration to Existing Structure Walls only, 25 107839 BG Walls Only approved by Chuck Murray
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Temporary Service), 25 107839 BG
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (10 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Project Installing {2-Dishwasher, 1-Sink, 1-Floor Drain, 1-Kitchen Sink, 1-Mop Sink, 1-Trap Primer, 1-Water Heater - Tankless}
A Nonresidential Partial Demoltion Primary Building, 24 111988 BZ
A Nonresidential Partial Demoltion Primary Building, 24 111604 BZ
A Nonresidential Alteration to Existing Structure Electrical Project Involving (7 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Project Installing {1-Switches, 1-Added or Altered Branch Circuits} Adding a power actuator to the roof door to shut during a smok…
TENANT IMPROVEMENT - add and relocate sprinklers for TI wall and ceiling changes.
New walls, doors, relites and finishes. Reuse / relocation of existing light fixtures with supplemental light fixtures., 24-119628
Revision to existing smoke control system to accommodate install of interconnected stair between Floors 19 and 20., 24 107167 BZ
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (2 Control Wire), 2544011
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Added or Altered Branch Circuits)
Temp Power, Fire Alarm Cabling Only, Replace/Adding Lighting Fixtures, Replace/Adding Lighting Controls, Adding 50A Panel MCB Panel, Altering/Adding Circuits to existing Panels. Fu…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Security System)
A Nonresidential Repair or Replacement None Project Involving (6 Toilet, 2 Urinal, 2 Bathroom Sink)
Smoke Control for L11-12 tenant improvement works, 24 119135 BZ
The project consists of the fit-out renovation of existing office space. The space is approximately 44,735 RSF and is to be built out as a general office space consisting of workst…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (17 Light Fixtures, 4 Receptacles, 4 Switches, 4 Added or Altered Branch Circuits), 24 119628 bz
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Telecommunications System), none
A Nonresidential Alteration to Existing Structure Walls only electrical rough in, 24 119703 BG. *Walls only approved by Chuck Murray.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (73 Speaker Wire)
DEMO GRILLES AND DIFFUSERS. RELOCATE VAV BOXES AND GRDs. INSTALL EXHAUST FAN, WATER SOURCE HEATPUMPS, VAV BOXES AND GRDs.
The project consists of the fit out renovation of existing office space. The space is approximately 44,735 RSF and is to be built out as general office space consisting of workstat…
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (1 Security System, 1 Telecommunications System)
Tenant Improvement of Level 11 and 12 of approximately 35,410 total SF area of work.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (37 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (54 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (41 Cable TV or Closed Circuit TV Coaxial Cable)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (41 Cable TV or Closed Circuit TV Coaxial Cable)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (12 Receptacles, 32 Office Furniture, 44 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (12 Receptacles, 32 Office Furniture, 44 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Temporary Service), 24 119703 BG
A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Added or Altered Branch Circuits)
Modify existing fire alarm system for tenant improvements. Demo existing devices/reinstall (7) devices and install (90) new devices. Office tower Level 11 & 12, TikTok. Lincoln Squ…
A Nonresidential Alteration to Existing Structure None Project Involving (2 Toilet, 2 Bathroom Sink, 2 Floor Drain, 2 Water Heater - Tankless)
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Total Sprinkler Heads)
A Nonresidential Alteration to Existing Structure None Project Involving (2 Diffusers or Grilles = < 15, 1 Exhaust Fan with Duct)
DEMO EXISTING BREAK ROOM SINKS ON LEVELS 11 AND 12. PANTRIES: INSTALL SINKS, INSTANTANEOUS WATER HEATERS, ICE MAKERS, COFFEE MACHINES, WATER DISPENSERS, BACKFLOW PREVENTERS, AND FL…
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (7 Fire Alarms)
New flooring, lighting, wall finishes, plumbing fixtures, and accessories. Utilizing existing rough in remaining from prior demolition., N/A
A Nonresidential Alteration to Existing Structure Project Installing {203-Light Fixtures, 2-Switches, 8-Receptacles} Replace existing light fixtures with new. Re-use the existing l…
Relocation of Electrical Equipment from L15 to L21 Electrical & Cable Rooms to facilitate removal of L15 and below electrical branch circuits. No net new loads, only reduction and…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Light Fixtures, 1 Added or Altered Branch Circuits)
A Nonresidential Partial Demoltion Primary Building, 24 119135 BZ
Interior finish upgrades for carpet, casework and lighting.
Closing street to clean top of the sky bridge that goes from Lincoln North to Bellevue Place.
There was a water leak from a backflow preventer on level 12, flooding the floors below for levels 12, 11, 10, 9, 8. Repair work consists of GWB selective demo for moisture mitigat…
The project consists of the fit-out renovation of existing office space. The space is approximately 44,735 RSF and is to be built out as general office space consisting of workstat…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
Interior fit-out of two floors of office space. Includes all new walls, finishes, ceilings, lighting, etc. and addition of interconnecting stair by others.
TENANT IMPROVEMENT - add, relocate and plug sprinklers for TI wall and ceiling changes on levels 19 & 20
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (65 Intercom and Communication)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (12 Light Fixtures, 10 Receptacles, 2 Added or Altered Branch Circuits)
Modify existing fire alarm system at Lincoln Square North Level 19 & Level 20. Existing NACs will remain. Replace all existing notification devices with (102) Speaker Strobes and (…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Temporary Service)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Partial Demoltion Primary Building, 24 107167 BZ
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (25 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (110 Intercom and Communication)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (6 T-Stat or HVAC Controls)
Office floor build out. Demo existing tenant space. Provide new lighting and lighting control. Connections to new VAV's. Connections to new office furniture. Install new receptacle…
Renovation of floor 10 elevator lobby, corridor and restrooms. Replace fluorescent lighting with LED. Replace receptacles. Replace fire alarm devices.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (158 Telecommunications System)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Receptacles, 4 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (133 Speaker Wire), 2441008 TikTok SM
TENANT IMPROVEMENT - ADD/RELOCATE FIRE SPRINKLERS FOR T.I. WALLS & CEILINGS. PATRIFP099CF.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (4 Intercom and Communication, 75 Security System)
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1 Capped or Plugged Heads, 11 Relocated Heads, 6 Quick Response Heads, 18 Total Sprinkle…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (16 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (456 Telecommunications System), 2445013 - TikTok Bellevue
Adding receptacles, lighting. Replacing existing lighting. Mechanical connections. Low Volt pathway. Fire Alarm Cable. Furniture connections. Lighting Controls. Modify existing pan…
Demo & alteration of existing core restrooms on 4th & 5th Floors. Installation of (2) shower rooms, (1) gender neutral restroom, and (1) breakroom on 5th Floor.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Temporary Service)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (16 Added or Altered Branch Circuits)
TENANT IMPROVEMENT - ADD/RELOCATE FIRE SPRINKLERS FOR T.I. WALLS & CEILINGS. PATRIFP099CF.
Selective tenant improvements of floor 23rd to 26th of existing office space.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (10 T-Stat or HVAC Controls)
INSTALL (4) VAV BOXES WITH HEAT. RELOCATE (1) VAV BOX. INSTALL (2) EXHAUST FANS, EXHAUST DUCT, AND GRILLES. MODIFY DUCT WORK AND INSTALL DIFFUSERS, GRILLES, AND AIR TRANSFERS PER T…
REMODEL FOR NEW TENANT LEVELS 22-26, INCLUDING DEMO OF EXISTING FIXTURES, INSTALL OF NEW FIXTURES AND ASSOCIATED PIPING PER PLANS.
A Nonresidential Partial Demoltion Primary Building, 24-101243BZ
A Nonresidential Alteration to Existing Structure Walls only approved by Chuck Murray, 24 102220
Interior only, non-structural tenant improvement including construction of new walls, doors, ceilings, casework, finishes, and lighting.
SCOPE OF PROJECT INCLUDES: COMMON CORRIDOR: Replacement of existing ceilings and light fixtures and installation of new finishes. ELEVATOR LOBBY: Replace flooring and wall finishes…
Provide and install (2) new VAV's, relocate existing VAVs as required and perform misc. duct and GRD mods.
GENERAL: INSTALL EQUIPMENT SCREENS INTENDED TO CONCEAL HVAC UNITS AT THE SOUTH EAST ROOF OF LEVEL 4. 1. CUT AND REMOVE ROOFING AS NEEDED TO INSTALL ROOF SCREEN SUPPORT COLUMNS AS S…
Demo level 18, power, install new power & lighting, low voltage/fire alarm rough in
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (2 Capped or Plugged Heads, 2 Relocated Heads, 4 Total Sprinkler Heads)
Tenant Improvements on existing 18th floor office space.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (16 Light Fixtures, 4 Added or Altered Branch Circuits)
Setup traffic control on NE 8th St. to clean top of the sky bridge that goes from Lincoln north to Bellevue Place.
Reconfigure an existing conference room area to create three shower/restrooms, build out a new conference room, and enclose an existing seating area where the stairwell was planned…
A Nonresidential Alteration to Existing Structure Project Installing {1-Feeder} Removal of L18 UPS System & Cable Room Panels currently feeding L21 Cable Room Panels. Refeed of L21…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System, 1 Telecommunications System)
Modify existing fire alarm system Lincoln Square North, Level 18 LinkedIn. (24) new, (45) relocated devices. Joint venture between Johnson Controls Fire Protection and Precision El…
A Nonresidential New Structure Low Voltage Only Project Involving (2 Security System)
A Nonresidential New Structure Low Voltage Only Project Involving (2 Security System)
Provide and install new VAV, new exhaust fan, relocate VAV and perform misc. duct and GRD mods per drawings.
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (23 Total Sprinkler Heads)
LEVEL 18: DEMO EXISTING 3/4"DCW TO WF-1 AND IWH-181. ADD (1) 120 GALLON WATER HEATER, (3) FLOOR SINKS, (3) FLOOR TROUGHS, (5) FLOOR DRAINS, (5) SHOWERS, (3) WATER CLOSETS, (6) LAVA…
DEMO VAVs AND WATER SOURCE HEAT PUMPS. INSTALL NEW VAVs, WATER SOURCE HEAT PUMP, EXHAUST FAN, MISC DUCTWORK AND REPLACE GRDs PER PLANS
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)
A Nonresidential Alteration to Existing Structure Project Installing {29-Office Furniture} Connecting (29) system furniture connections. *plan review waived by Chuck Murray
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)
Tenant Improvement - interior construction of new office space.
Complete buildout of the 7th floor. Empty shell to complete office tenant space
Modify existing fire alarm system Lincoln Square N Tower, Levels 7, The Pokemon Company International. Add (1) NAC, and (42) notification devices. Joint venture between Johnson Con…
A Nonresidential Partial Demoltion Primary Building, 23 108061 BZ
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (16 T-Stat or HVAC Controls)
Demo & alteration of existing core restrooms. Installation of (2) Single use Restrooms & (1) new break area. All hot water to be serviced using new point of use under counter tankl…
**Post Rev 2 Drawings dated 8/23/23 has DELETED Levels 4 & 5 from the scope of work. Only Level 7 work will be done at this time, under this permit. Level 7 Scope of Work: Provide…
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Relocated Heads, 4 Total Sprinkler Heads)
Relocate existing 100A 480V panel, 30KVA transformer, and 100A 208V panel so the back wall of the tenant space can move to give more space to the adjacent tenant. Reconnect al exis…
Modify existing fire alarm system Lincoln Square North, Levels 6 & 8 Pokemon Prefab Pods. (4) New devices. Joint venture between Johnson Controls Fire Protection and Nelson Electri…
Add, relocate ad plug sprinklers for TI wall and ceiling changes on floors 4, 5 and 7
The tenant improved the interior construction of the new office space., 21-118139 BZ
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (4 T-Stat or HVAC Controls), NA
Scope of work includes demolition of power and data, plumbing, lighting, ceilings, finishes, doors, glazing, and walls. No new work.
A Nonresidential Partial Demoltion Primary Building, 22119029BZ
Construction of new door and infill of existing demolished door in existing CMU block wall.
A Nonresidential New Structure Low Voltage Only
Electrical No Plan Review · Jul 10, 2026