Building permit intelligence · Bellevue, WA
575 Bellevue Square has 167 municipal building permits on file in Downtown. The latest recorded activity was a electrical no plan review permit dated Jul 20, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 19 mapped permits within 500 m of this address.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Carnival or Street Fair)
A Nonresidential Repair or Replacement Low Voltage Only
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (4 T-Stat or HVAC Controls)
A Nonresidential Repair or Replacement Electrical Project Involving (Sign Circuit)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Receptacles, 2 Added or Altered Branch Circuits)
19 mapped permits within 500 m, shown on the intelligence map above.
This address has 167 permit records in PropertyLabs' public history and is located in Downtown. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 575 Bellevue Square is dated Jul 20, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 575 Bellevue Square in the PropertyLabs platform, along with alerts when new permits are filed at this address.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
A Nonresidential New Structure Low Voltage Only Project Involving (45 Telecommunications System), 25 115860 BG
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (45 Telecommunications System)
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (6 Fire Alarms)
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (7 Fire Alarms)
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (5 Fire Alarms)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
A Nonresidential Repair or Replacement Electrical Project Involving (Sign Circuit)
A Nonresidential Repair or Replacement Electrical Project Involving (Sign Circuit)
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (1 Lighting System)
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (6 Fire Alarms)
A Nonresidential Alteration to Existing Structure None Project Involving (1 Water Service - 1 1/2"), 23 118449 UE
A Nonresidential Alteration to Existing Structure None Project Involving (1 Water Service - 3/4", 1 Water Service - 1", 1 Water Service - 2", 2 Water Service - 4")
TEMPORARY 20'X30' TENT FOR HOLIDAY STORAGE IN PARKING LOT, N/A
Traffic control measures to facilitate traffic flow during peak traffic periods around 575 Bellevue Square. Holidays and Friday - Sunday as needed 11-1-2025 to 10-31-2026., 24 1255…
Trench Bellevue Way Set 73ft of 1-1,4in PE SCAT Stub.
Grinding and or cutting the sidewalk at trip hazard locations along NE 8th to remove lips greater than .25in for safer pedestrian travel.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Added or Altered Branch Circuits)
Tenant Improvement
Essential utility reroute work around the Bellevue Square Mall
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Sign Circuit)
Essential Electrical Utility Reroute Work Around the Bellevue Square Mall
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Light Fixtures, 4 Receptacles, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure None Project Involving (5 Toilet, 2 Urinal, 5 Bathroom Sink)
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (8 Fire Alarms)
Utility Relocation and Upgrade
Placement of ecology blocks on the sidewalk of Bellevue Way at NE 6th between STK Steakhouse and Bellevue Art Museum to prevent vehicle intrusion during the annual arts fair. Placi…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Carnival or Street Fair)
Relocation of fire backflow vaults, PIVs, and FDCs for existing services, 23-118449-UE, 23-118448
Essential Electrical Utility Reroute Work Around the Bellevue Square Mall
Installation of Retaining Wall / Vehicle Barrier greater than 4ft Tall to support new stair and upgraded sidewalk., 23-118448 GD
PROVIDE AND INSTALL (1) NEW COOLING TOWER, (4) PUMPS, (3) BOILERS AND ASSOCIATED PUMPS, PIPING AND APPURTANCES FOR EXPANSION OF EXISTING COOLING PLANT FOR FUTURE CONNECTION. ALL EQ…
Installation of final Cooling Tower Cell into existing Mechanical Plant and Condenser Water Distribution., 23 105353 DC
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Gate, 2 Added or Altered Branch Circuits), Garage Doors
Utility reroute work around the Bellevue Square Mall. Specific request for PSE reroute work on NE 7th Street portion of project., 23 118448 GD
Install (1) 480V 3P 4W 100A temporary power skid to supply power to (2) connex.
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (1 Lighting System)
Site work including removal & reinstallation of landscaping, sidewalk, hardscape & paving areas to facilitate Utility Relocation work. Includes Land Use Exemption for landscape mod…
West Drive Lighting Service Area #3 to NE 4th, Southeast Drive Lighting Macy's to Service Area #4. (2) new PSE 1500KVA pad mount transformers installation and service conductor rep…
Relocation of utilities servicing the Bellevue Square Mall. Including removal and restoration to existing/upgraded conditions of sidewalks, drive lanes, landscaping etc., 23-118448…
Nightly holiday parade between NE 8th and NE 4th on Bellevue Way at 7:00 pm.
Remove and replace 3 trees in kind due to roots causing sidewalk uplift and damage. Replace small amount of sidewalk associated with trees.
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (2 Fire Alarms)
PROVIDE AND INSTALL (1) NEW FIRE SMOKE DAMPER IN NEW 1HR RATED WALL. PROVIDE AND INSTALL (2) NEW VENTILATION FANS AND (2) NEW DUCT HEATERS AND DUCTWORK. AIR BALANCE. 24-103335 BZ
Remove, replace, and add new egress fixtures. Add mechanical connections. Remove, replace and add smoke strobes/speakers.
The scope of work primarily involves adding security panels and two additional roll-up doors to secure vehicular and pedestrian entries. Landuse Exemption has been approved., 24-12…
Traffic control measures to facilitate traffic flow during peak traffic periods around 575 Bellevue Square. Holidays and Friday - Sunday as needed 11/1/2024 - 10/31/2025.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Light Fixtures, 12 Receptacles, 2 Switches, 2 Exit Sign, 2 HVAC Equipment - Inside, 1 HVAC Equipme…
Modify existing fire alarm system for tenant improvements. Install (10) new devices and reinstall (11) existing devices. Technician to insert NAC expansion card into NAC16. Level B…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Light Fixtures, 2 Receptacles, 2 Switches, 2 Gate, 1 Added or Altered Branch Circuits), 23 123759…
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (6 Total Sprinkler Heads)
A Nonresidential Alteration to Existing Structure None Project Involving (1 Drinking Fountain)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (7 Security System)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
The applicant is requesting a Land Use Exemption for additional scope of work related to Land Use Approval No. 14-140872-BY, which is attached to this application for reference. Th…
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (4 Fire Alarms)
Add Heating/Cooling and DOAS to an existing storage space that is being converted to Office and break room. (2) fire smoke dampers. Building permit is 24-103621 BZ.
2024/25 Holiday tree lighting and maintenance as approved per the 2020 Tree Lighting Agreement between KDC Properties and Parks Department (attached) and per a valid issued ROW per…
Demolition of existing vanity counters, sinks, and plumbing fixtures and replacing with new. Demolition of existing finishes. Demolition of existing mirrors and scones. Limited cei…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Light Fixtures), job #2401322
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (5 Cable TV or Closed Circuit TV Coaxial Cable, 5 Security System)
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
Cooling Tower Expansion Zone 3
Electrical for Expansion of the Cooling tower in Zone 2
In stall rolling security doors on the exterior of the Macy's Fountain Court entry, 23-118375
Upgrade Storage to EH2, group A plastics up to 15'
The owners of the affected parcels, Kemper Development Company and the Brice Tenancy, propose to adjust certain boundary lines as depicted in the attached Boundary Line Adjustment/…
Install two rolling security doors at the Macy's Fountain Court Entry on Bellevue Way. The new rolling doors will be on the exterior of the building., 23_118375 LJ
Two overhead rolling security doors are proposed at the Macy's Fountain Court mall entry on Bellevue Way NE
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System), 23 121978 FA
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Heat Pump, 7 Receptacles, 1 Exit Sign), 23 121978 fa
Modify exsiting fire alarm system Bellevue Square Level D NE Quadrant - KDC IT Room. Demo (1), Install (2) new devices. Joint venture between Johnson Controls Fire Protection and N…
Traffic control measures to facilitate traffic flow during peak traffic periods around 575 Bellevue Square. Holidays and Friday - Sunday as needed 11/1/2023 - 10/31/2024.
Maintenance on tree lighting as approved per the 2020 Tree Lighting Agreement between KDC Properties and Parks Department (attached) and per a valid issued ROW permit. Most of the…
Reroute existing egress
Add and relocate sprinklers for TI wall and ceiling changes
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Security System)
Replacing domestic water main for reconfigured tenant spaces. Installing new waste, grease waste, and vent services for reconfigure tenant spaces. Adding roof drains for roof above…
SUPPLYING WATER TO NEW COOLING TOWER ON ROOF. INSTALLING BACKFLOW PREVENTER, HOSE BIBB, FLOOR SINK w/ELECTRONIC TRAP PRIMER, AND ROOF RECEPTOR.
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Relocated Heads, 4 Total Sprinkler Heads)
Installation of non-illuminated dimensional letters on exterior and interior entrances to business
Addition of two (2) new Cooling Towers for a new Condenser Water System throughout the Bellevue Square property. Project is a continuation of initial Cooling Tower at the former JC…
The 2023 BAM Arts Fair will be operating load-in for artists/vendors on Thursday, July 27th with proposed street closures from 6am to 10pm. The event occurs at Bellevue Square on F…
A Nonresidential New Structure Electrical Project Involving (Sign Circuit)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Carnival or Street Fair)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Light Fixtures, 1 Receptacles, 4 Exit Sign, 1 Added or Altered Branch Circuits), 23 108903 bz
Temporary reroute of egress on the south side of Macy's and east side of Bellevue Square Mall adjacent to the SE Garage, 1544100040
Add an exterior soffit and column cladding at Service Area 4, N/A
Expand cooler tower
Setup mobile crane on NE 8th Street to remove and replace critical HVAC equipment. Traffic level diesel engine noise is the extent of this scope of work.
Setup Mobile crane on NE 8th Street to remove and replace Critical HVAC equipment on the roof of Nordstrom. Traffic level diesel engine noise is the extent of this scope of work. (…
Setup mobile crane in the private driveway to the Nordstrom loading dock area to remove and replace critical HVAC equipment. Traffic level diesel engine noise is the extent of this…
Remove and replace rooftop HVAC equipment from the East portion of Nordstrom with a mobile crane from NE 8th Street. Full road closure of NE 8th Street between Bellevue Way and 102…
A Nonresidential Repair or Replacement Project Installing {1-Service, 1-Service Change 201-399 amps} Replace service disconnect.
Add ships ladder to roof to provide better access for maintenance.
Accessing (4) Manholes in the ROW
We will once again be installing lighting on all the street trees surrounding the properties of the Bellevue Collection. Most of the work will be done off of ladders from the sidew…
Placement of variable message signs to guide holiday traffic in and around downtown during peak shopping season at the Bellevue Collection.
Traffic control measures to facilitate traffic flow during peak traffic periods around 575 Bellevue Square. Holidays and Friday - Sunday as needed 11/1/2022 - 10/31/2023.
Install temporary concrete eco blocks in strategic areas on the sidewalk to assist with preventing vehicles from entering the closed off road during Snowflake Lane.
Mall Renovation Creation of expanded concourse skylight pathways for revised retail layout. Structural upgrades Mechanical Upgrades Electrical Upgrades Reroofing Egress Modificatio…
Project involves demolition of interior partition and construction of a new grid height wall and door/relite.
Replace rooftop unit. Configure existing duct connections to align with new unit, per plan.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (10 Light Fixtures, 2 Gate, 5 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Carnival or Street Fair)
Emergency Follow Up-Crew was called out on 5/20/2022 for an emergency leak repair at 575 Bellevue Sq. 1 (8x9) hard surface cut was made.
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (2 Lighting System)
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (2 Lighting System)
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Relocated Heads, 4 Total Sprinkler Heads)
Provide and install roll down security doors at entrances B6 and A2. Roll down doors will only be closed in Emergency Lockdown situations. An additional pair of swinging s…
A Nonresidential New Structure Low Voltage Only Project Involving (4 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (6 Telecommunications System), JB:2245003
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits), JB: 2245003
Rolling security doors are proposed at two mall entries and a new vestibule and glass storefront are proposed at one mall entry.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Control Wire, 1 Speaker Wire)
Maintenance on tree lighting throughout the year
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (1 Lighting System)
Traffic control measures to facilitate traffic flow during peak traffic periods around 575 Bellevue Square. Holidays and Friday-Sunday as needed 11/1/21 - 10/31/22.
Install concrete eco blocks in strategic areas on the sidewalk to assist with preventing vehicles from entering the closed off road during Snowflake Lane.
This is for the sidewalk installation of drums, lights and fencing and the road closure plan for the event dates of November 26 - December 24 with National Barricade as the vendor.
Placement of portable changeable message signs (PCMS) to guide holiday traffic in and around downtown Bellevue during peak shopping season. PCMS will assist with congestion during…
A Nonresidential Repair or Replacement None Project Involving (1 Toilet, 1 Bathroom Sink, 1 Sink, 1 Drinking Fountain, 1 Floor Drain)
Project involves minor demolition of interior partition and door, and construction of a new partial height wall to accommodate systems furniture reconfiguration.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
Install rolling grilles/doors at six main entrances
NIght time work permit for construction noise associated with permit 21 102132BZ. Noise to be within private property. Construction noise includes mobile crane trucks, fork lifts,…
Supply power to (6) roll up gates and (2) heaters at entries to Bellevue Square on the west side of the facility. Circuits from emergency power systems
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (24 Relocated Heads, 24 Total Sprinkler Heads)
The ability for KDC to page from the KDC security center to site, Bellevue Square. Add audio option board to panel and program TSW speaker selection switches to mimic the switches…
Traffic control measures to facilitate traffic flow during peak traffic periods around 575 Bellevue Square. Holidays and Friday-Sunday as needed 11/1/2020 - 10/31/2021.
We will once again be installing lighting on all the street trees surrounding the properties of the Bellevue Collection. Most of the work will be done off of ladders from the sidew…
Maintaining public safety for the occupied space is the reason for applying for an noise ordinance exemption for Saturday 7/25/20 from 4pm to 6pm.. The space served by the RTU will…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 T-Stat or HVAC Controls)
REPLACE EXISTING ROOF TOP AIR HANDLER, PER PLAN.
Crane placement for RTU installation. 110T crane will be used to pick the existing unit off the roof, and 45T will be used to install the new unit on the roof.
Post Revision # 1: Approved TCP Repaving the intersection of 101st Ave. NE and NE 8th St. including traffic loop and ADA ramps. Subject to Approved Clearing & Grading Permit # 20 1…
Modify existing fire alarm system adding (3) speaker/strobes to New Corridor behind tenant spaces. Joint venture between Johnson Controls Fire Protection and Nelson Electric.
Installation of Lighting, exits, mechanical fan and heat, auto door and service conduits for new corridor to serve future tenant space 1120
Installation of (4) temp ceiling strobes for the staging area of Snow Flake Lane in empty tenant space 1120
Traffic control measures to facilitate traffic flow during peak traffic periods at 575 Bellevue Square. Holidays and Friday-Sunday as needed 11/1/19 - 10/31/20, 18 127149 TE
Modify existing fire alarm system Phase 2 for rooftop Level D installing (10) duct detectors. Joint venture between Johnson Controls Fire Protection and Schneider Electric.
Placement of variable message signs to guide holiday traffic in and around downtown during peak shopping season at the Bellevue Collection., 18 127146 TE
A Nonresidential Alteration to Existing Structure Electrical Project Involving (20 HVAC Equipment - Outside)
Modify existing fire alarm system Phase 1 for rooftop Level D installing (10) duct detectors. Joint venture between Johnson Controls Fire Protection and Schneider Electric.
Installation of Tesla electric vehicle charging equipment within existing parking stalls in the parking garage of Bellevue Square. Installation of electrical equipment will be kept…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Carnival or Street Fair)
Review exterior signage matrix for Bellevue Square.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Sign Circuit)
A Nonresidential Alteration to Existing Structure None Project Involving (1 Toilet), 19-107102 BZ
Approval of the sign support bar for (3) Signs, 18-131689-SA
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Sign Circuit)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Control Wire, 3 Telecommunications System)
Setup traffic control on NE 4th Sr. to trench 10' in private property & replace cable from J1 to X1. Install new vault & PM transformer. See attached work sketch.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Sign Circuit)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (3 HVAC Equipment - Outside)
Electrical No Plan Review · Jul 15, 2026