10349 NE 10TH St has 76 municipal building permits on file in Downtown. The latest recorded activity was a electrical no plan review permit dated Jul 7, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 33 mapped permits within 500 m of this address.
A Nonresidential Repair or Replacement Electrical Project Involving (1 HVAC Equipment - Inside, 1 HVAC Equipment - Outside)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits)
Install 480V/100A feeder with from existing switchboard in electrical room to rooftop cell site for DISH Wireless. Install 100A disconnect and 50kVA 480V to 240V/120V 200A step-dow…
Post Revision # 1: Updated traffic Control Plan. Close NE 10th St. to stage mobile crane to service rooftop telecom site.
DISH Wireless intends to install 5G antennas and equipment to the rooftop of the Avalon Towers Bellevue building at 10349 NE 10th St, Bellevue WA. The installation will be for 6 pa…
33 mapped permits within 500 m, shown on the intelligence map above.
This address has 76 permit records in PropertyLabs' public history and is located in Downtown. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 10349 NE 10TH St is dated Jul 7, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 10349 NE 10TH St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
crane work, 22 116731 TE
replace Employee Break room sink on 1rst floor, Reconfigure floor 15 Community lounge Kitchenette and replace sink in new location, replace sink on floor 23 patio access.
Add (1) Fire pit and associated Gas piping at the rooftop patio of Floor 23
A Multifamily Residential Alteration to Existing Structure Low Voltage Only Project Involving (1 Intercom and Communication, 1 Security System, 1 Telecommunications System)
A Multifamily Residential Alteration to Existing Structure Electrical Project Involving (1 Switches, 1 Added or Altered Branch Circuits)
Signage face change only.
A Multifamily Residential Repair or Replacement Low Voltage Only
Interior alterations to the existing Avalon Towers Bellevue consisting primarily of minor space plan changes, interior finishes, casework and millwork, and replacement upgrade of e…
Removal of lighting from 2 trees. Work to be done on sidewalks only. No impact to any streets. Work will be done sometime between January 19-28 and will only take 30 minutes to com…
New WFC on the roof of Avalon Towers Bellevue: Two (2) enclosures planned on the roof for antennas and radio equipment cabinets. Both enclosures to be screened in material that wil…
REFACING EXISTING SIGNS.
Installation of TempurPedic signs, using scissor lift on sidewalk, NOT blocking full sidewalk. Subject to an approved Permanent Sign Permit # 18-132105 SA
Run fire alarm wires to new fire pump's that were installed. Un-hook old fire pumps.
SMITH FIRE SYSTEMS (SFS) WILL REPLACE THE PRIMARY AND SECONDARY FIRE PUMPS TO BALANCE THE EXISTING SYSTEM IN COMPLIANCE WITH THE REVISED BELLEVUE FIRE REQUIREMENTS. SFS WILL INSTAL…
remove and replace One insulated glass unit into existing frame.
A Nonresidential Alteration to Existing Structure Project Involving (1 Back Flow Preventer - 1/2")
Extend gas piping only for fixtures under 13-120253 BL.
Install 2 building mounted illuminated signs @ 13.8 sq ft and 1 buiding mounted sign non illuminated @ 3 sq ft.
Install fire alarm system with 16 devices.
Install 1 elevator, 5 exit signs, 2 fans, 3 heat pumps, 2 hvac equipment inside, 88 light fixtures, 1 200 amp panel, 50 receptacles, 1 sign circuit, 1 subpanel, 1 transformer, 1 wa…
Install 3 a/c, 4 appliance vent, 2 condenser or chiller, 26 diffusers or grilles, 1 fireplace insert gas, 2 heater, 1 humidifiers Nortec Units.
See fixture list.
A Nonresidential Alteration to Existing Structure Project Involving (5 T-Stat or HVAC Controls)
25 heads
Questions regarding retail space.
Close southbound curb lane of Bellevue Way NE south of NE 10th St to park work/delivery vehicles and work on face of building. See Conditions & Attachments. Subject to hourly inspe…
Install heat pump.
Bath Fan.
Relocate 6 sprinkler heads, add 1 sprinkler head.
A Multi-Family Alteration project installing { Light Fixtures,Receptacles } - Changing storage closet to common area sink with mini refrigerator.
A Multi-Family Alteration project installing { Gas Piping Only (No fixtures) } - GAS PIPING FOR BBQ ON DECK OUTSIDE STORAGE RM 2310
A Multi-Family Alteration project installing { Sinks } - SINK FOR BBQ ON DECK AT THIS LOCATION
Install 4 building mounted signs, 1 interior lighted @ 30.33 sq ft, 1 non lighted @ 5.77 sq ft, 1 non lighted @ 3.33 sq ft, and 1 interior lighted @ 30.33 sq ft.
Add wall in garage for new storage room. Revise exterior trash enclosure.
Install (1) building mounted sitn; int ltd @ 122 sf.
Energize meter with 100 amp feed to skid and 200 amp panel. Sub feed panel 50 amps. Circuits for lighting and power in construction offices.
Refeed West Tower temp power from Panel EWH14.
A (Commercial) (Alteration) project installing (28 Low Voltage telecommunication system - Com.)
Install fire alarm system with 292 devices
Building Radio Coverage for both East and West Tower.
Electrical installation for high rise towers.
Walls only Level 7 East and West.
Walls only.
Slab only. Level 21 & 22.
instal 1 building mounted non lighted sign @ 23 sq ft, and 2 interior lighted signs @ 122 sq ft each.
instal 1 building mounted interior lighted sign @ 8 sq ft.
Install 4 building mounted signs. 2 non lighted @ 35 sq ft, 1 interior lighted @ 35 sq ft, and 1 interior lighted @ 8 sq ft.
Walls only #08-136614 BG for Level 5 East and West Tower.
Temp gas piping for (2) temp heat units.
Slab only for West Tower roof embed only, East Tower floors 19,20.
Install 5 gas piping/stubouts, 3 gas water heaters (domestic water boilers), 2 heat pumps, 3 refrigeration equipment, fans and smoke control system and generator/fuel oil. Note: Sm…
Add 17 receptacles, 10 lights, 4 data jacks, 2 1500 watt heaters for a temp construction office on Level 3.
Lighting and CMU wall R/I.
Install fire sprinkler system w/ 2506 heads.
800 amp temp power system and building distribution. **Rev 4 Additional disconnect for hoist, upsize hoist feeder, add 1 75 kva and 200 amp panel. *Add on - Relocate manlift discon…
Embed conduit for levels 5-10
Install underground conduit for 800 amp board.
Install (4) parking devices with (1) controller. Also install (4) traffic "loops" in entry/exit lanes.
Install security/access control system and area of refuge phone system.
Pre wire only.
Slab only permit #08-136614 BG for parking through floor 4.
Slab only - conduits in slab for 2 sump pumps and conductors for ufer ground.
Install per fixture list. **Rev 2 - Add on 3 hot water heater and 1 backflow preventor 2"**
Construction of below grade parking, above grade parking, retail and sales office.
Install per fixture list. **Ground Work Only**
Shoring for underground garage structure and 408 unit apartment building.