Building permit intelligence · Minneapolis, MN
818 Dunwoody Blvd has 57 municipal building permits on file in Lowry Hill. The latest recorded activity was a commercial permit dated Jul 8, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
REMODEL ROOM FOR X-RAY DEVICE 2020 MSBC architect: 49978 - Anderson, James Charles
Remodel restroom and add a restroom -ACW certificate of occupancy required: no special inspections required: no const type: IB occupancy: B 2020 MSBC 20% accessibility upgrades___r…
New exhaust fan duct, with associated transfer duct to serve a remodeled bathroom on 3rd floor and newly converted bathroom (from office space) on second floor per approved plans.
Remodel of (2) Restrooms on 3rd floor; and conversion of offices into (2) restrooms on second fl. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbi…
Replace 3 RTUs for the CEE Roof (one 3-ton, one 4-ton, and one 8 ton) and 3 RTUs for the Black Level 77-81 Classroom roof (three 3-ton) Direct replacements
2 mapped permits within 500 m, shown on the intelligence map above.
This address has 57 permit records in PropertyLabs' public history and is located in Lowry Hill. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 818 Dunwoody Blvd is dated Jul 8, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 818 Dunwoody Blvd in the PropertyLabs platform, along with alerts when new permits are filed at this address.
ComMFDRR
Replace (3) existing AHU's with two #16 AHU's and one #30 AHU with steam and condensate piping and chilled-water piping to serve the Holden Center and construction labs.
Ductwork modifications per approved plan.
Install a single compartment sink and faucet. Install a wall water supply box.
remodel engineering faculty offices. certificate of occupancy required: no sprinklered: yes architect: berg #26948 Clow Berg architects
20-ton dual-circuit condenser
/Furnish and install two mini-split units
10 TON REPLACEMENT AHU+PIPING BTWN RTU & COIL Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described…
REMODEL - REMOVE BLOCK, ADD DRYWALL - DUNWOODY, GREEN LEVEL 2020 MSBC architect: 26978 - Berg, Michael Erik
replace 3 air handlers with like equipment (HW heat, CW cooling - no gas)
FOR CEE SPACE/ROOM 165 - Furnish and install a 16 ga. Stainless steel single bowl sink with left hand drain board in room 165 of the CEE space
dining hall ceiling remodel on green level, (4) bathroom refreshes on two different levels (black and red levels), Interior classroom remodel for a new program within the College o…
replace MAU for paint booth
Replace 27 fixtures in Black and Red Bathrooms - Wall mounted Lavs - 9, Wall mounts Urinals - 5, Wall Mounted water closets - 11 Floor drain replacement 2 - sanitary UG and in wall…
1. For AC 01 to meet the Ashrae 90.1 section 6.4.3.9, Heating for vestibules and for air curtains with integral heating shall include automatic controls capable of and configured t…
Demo and reinstall one Lavatory to assist with new large classroom window installation. Remove and reroute sanitary and storm lines. Work to be performed on floors ground to 4.
Dunwoody Site & Signage Upgrades certificate of occupancy required: no special inspections required: yes const type: 2-B occupancy: U 2020 MSBC architect: J Mandyck #45590 engineer…
remove brick infill and install new window assemblies. construct student entry on north side of building. certificate of occupancy required: no const type: 1b occupancy: B 2020 MSB…
INSTALL 2 NEW CHILLED WATER CIRCULATION PUMPS
FOR CEE LAB CLASSROOM - FURNISH AND INSTALL NEW COMMERCIAL GRADE STAINLESS STEEL SINGLE BOWL SINK
Drain Tile & Sump Pump special inspections required: no occupancy: B 2020 MSBC
REPLACE FLAT ROOF, ADHERED 60 ML EPDM, R-30 (MAA)
Adding ductless split system to supply the data closet.
Furnish and install (2) Rinnai Demand-Duo HE water heaters to replace the existing A.O. Smith unit in the Main campus boiler room. 119-gallon capacity each.
install protective fencing at gas meters
Change 3, 4 & 5 ton rooftop units.
Second level, temporary classroom partitions. sck
REPLACE 3, 4 TON RTU'S
REPLACE 1 TUBE IN BOILER #2
INSTALL 2 TON CARRIER MINI SPLIT TO BLACK 78 IT ROOM
(DMH) TEAR OFF AND REROOF (6,300 S.F.) CENTER, GRADE LEVEL ROOF AREA OF SCHOOL. INSTALL ADHERED 2 LAYER ISO. INSULATION AND ADHERED 60 MIL. EPDM. APPROVED PLANS AND PERMIT MUST BE…
RETUBE BOILER #2
REPLACE 5 TON RTU
ADD HOT WATER UNIT HEATERS AND PIPING IN MECH LOWER LEVEL / ADD DUCTS IN CRAWL SPACE / PER APPROVED PLANS
RELACE 1 FCU & CONDENSOR FOR THE LOADING DOCK OFFICE
Just adding a chiller with the capacity of 200 Ton and connecting with 6" line to existing system. Talked to their representative Tanner Luhm and he was agreed to use the $284,350…
REPLACE 2 LOCHINVAR BRAND WATER HEATERS WITH RUUD BRAND 331000 BTU WATER HEATERS(MODEL #GBC331) FOR THE MAIN BUILDING
BOILER REPAIRS
REPLACE DOMESTIC HOT WATER BOILER AND (2) 120 GALLON STORAGE TANKS
TWO 120 GALLON HOT WATER STORAGE TANKS ATTACHED TO NEW BOILER(SEPARATE MECHANICAL PERMIT)
WARREN BUILDING - REPLACE 8 ROOFTOP UNITS RTUS 2, 3, 4, 7, 9, & 12 @ 115MBH RTU A @ 224MBH & RTU B @ 180MBH
REPLACE RTU "D" WITH (1) 10 TON/184MBH HIGH EFFICIENCY RTU NOTE: (8) RTU's HAVE ALREADY BEEN APPLIED FOR ON 10/5 CUSTOMER ADDED ANOTHER UNIT
WARREN BUILDING - REPLACE TWO BOILERS @ 10MBH EACH & PUMP SYSTEM
replace leaking tubes in boiler
REMOVE EXISTING CLAY TILE AND ROLL ROOFING ON SOUTH PORTION OF SCHOOL AND INSTALL NEW STANDING METAL ROOF WITH LAYER OF ISO. INSULATION. ROOF IS INSULATED BELOW DECK. (DMH#1) APPRO…
gymnasium to office conversion certificate of occupancy required: yes mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitte…
Interior renovation phase 1A -ductwork & equipment - New York AHU HW Coil & DX Coil, 3 Patterson Kelly boilers @ 399mbh each, Condensing Unit, Fan Powered Box, 26 VAV's, heat excha…
new fixtures
interior demolition in preparation for remodeling. sck gym area demolition
TEAROFF AND REROOF WEST PORTION OF ROOF. SCK
METER MOVE Q4 - 2016 BATCH #12 METER MOVE Q4 - 2016 BATCH #12