88 17TH St N has 20 municipal building permits on file in Loring Park. The latest recorded activity was a plumbing permit dated Jul 20, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Replacing (4) roof drains
Removing and reinstalling existing floor registers for painting (by others), installing (2) destratification fans. No duct install.
reroofing various portions of basilica in accordance with HGA architectural drawings.
REPLACE CHILLER
tearoff and reroof 2 sections of flat roof.
3 mapped permits within 500 m, shown on the intelligence map above.
This address has 20 permit records in PropertyLabs' public history and is located in Loring Park. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 88 17TH St N is dated Jul 20, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 88 17TH St N in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Reroof two (2) areas approximately 1800 sf Remove asphalt and gravel Adhere 2 layers of 2.6" isocyanurate roof insulation Install one layer of EPDM roofing membrane
temporary elevated bleachers/seating for basilica block party September 10 and 11. U of M Physicians skybox engineer: McCalla
Installing 10 temporary gas connections for 8 food trucks and 2 tents for the Basilica Block Party event.
MODIFICATIONS TO SOUTH ENTRY INCLUDING BRICK FACADE REPAIRS AND WINDOW/DOOR REPLACEMENT IN EXISTING OPENINGS. REBUILD STAIRS FOR IMPROVED RISE/RUN. (LAH) 20% accessibility upgrades…
FOR 2019 BASILICA BLOCK PARTY - INSTALL 25 GAS GRILLS
ERECTING 2 TEMPORARY STAGES FOR THE BASILICA BLOCK PARTY. ALSO BUILDING SEVERAL DECKS AND STAGES. WITH THE EXCEPTION OF THE STAGES, THE REMAINDER OF THE STRUCTURES ARE REQUIRED TO…
REPLACE GARAGE DOOR IN EXISTING OPENING AT NORTH END OF SACRISTY - BASILICA OF SAINT MARY. (LAH) ARCHITECT: LEMMON #40489 (MILLER DUNWIDDIE)
install 30 gas grills for basillca block party
REMODEL CATERING KITCHEN IN BASEMENT AT CHURCH.(JAG) certificate of occupancy required:no special inspections required:no const type: 1-A (ASSUMED EXISTING) occupancy: A-3 2015 MSB…
TEMP Outdoor stage for Basilica Block Party. RAISED SEATING PLATFORMS. (JJL SK)
FOR RECTORY RESTROOM RENOVATION - TOILET, URINAL AND LAVATORY
ADD ACCESSIBLE RESTROOM AT LOWER LEVEL (MAA #02) DENITA D. LEMMON MN REG# 40489
garage floor drain sink lawn faucet
erection of 2 stages and raised seating platforms for outdoor public assembly on july 7th and 8th. sck#2 engineers: mccalla, riley
40 TEMPORARY GAS HOOKUPS FOR BASILICA BLOCK PARTY 2017