Sheridan building permits
Municipal permit coverage for Sheridan, Minneapolis, MN; only records with valid coordinates are plotted.
- Community-matched dataset rows
- Refreshing
- Latest dated row displayed
- —
- Unique addresses displayed
- 0
- Leading permit type
- Mixed activity
Non-additive count across available canonical sources.
Activity, issue, or application date from the displayed cohort.
Deduplicated within the 0-row public cohort.
Sheridan construction snapshot
Address-level records for this neighborhood are being refreshed; the citywide context remains available below.
- Minneapolis, trailing 90 days
- 8,255 filings
Apr 23, 2026–Jul 21, 2026, inclusive.
Recent permits in Sheridan
- Recent address-level filings for Sheridan are temporarily unavailable in the public preview. Explore the Minneapolis permit report while this neighborhood cohort refreshes.
Track Sheridan in real time
Get contractor names, permit numbers, and alerts the day new permits are filed in Sheridan and across Minneapolis.
About the Sheridan permit data
PropertyLabs compiles this neighborhood history from municipal public permit records for Minneapolis, MN. Counts and filing details may change when the municipality corrects or republishes a record.
- Community matching uses the normalized municipality-supplied community field.
- Overlapping canonical tables are deduplicated for displayed rows and are not summed for headline coverage.
- Declared-value statistics exclude missing, non-positive, and implausible values above $100 million.
- The map plots only valid supplied coordinates; it does not fabricate locations for ungeocoded rows.
What declared construction value meansResidential vs. commercial permits
Citation & provenance
- Publisher
- PropertyLabs
- Municipal source
- Minneapolis Open Data
- Methodology
- Read the methodology
Suggested citation: PropertyLabs. "Sheridan Building Permits — Minneapolis." https://propertylabs.org/building-permits/minneapolis/sheridan