Building permit intelligence · Boston, MA
100 Terminal Rd has 179 municipal building permits on file in Ward 1. The latest recorded activity was a electrical low voltage permit dated Jul 21, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Disconnect and remove power from 30 existing check in kiosks, extend wiring and conduit to new locations for 26 new kiosks. Terminal A - Departures check-in for American Airlines
Disconnect and remove power from 30 existing check in kiosks, extend wiring and conduit to new locations for 26 new kiosks. Terminal A - Departures check-in for American Airlines
Replace existing lighting - Terminal A Satellite - 1st floor
add 2 FA AV devices - Terminal A Satellite - 1st floor
Fire Alarm for Alaska Air build out of offices and customer service stations @Terminal A - Pier B - Levels 1 & 2
1 mapped permit within 2 km, shown on the intelligence map above.
3 other addresses on Terminal Rd with municipal permit records in Boston.
This address has 179 permit records in PropertyLabs' public history and is located in Ward 1. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 100 Terminal Rd is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 100 Terminal Rd in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Power, lighting for Alaska Air build out of offices and customer service stations @ Terminal A - Pier B - Levels 1 & 2
Enabling work for Terminal A - renovation
Enabling work for Terminal A Post Security Connector
A one for one swap of a 480v 3ph range/griddle unit at Fox and Flight in Terminal A
Fire Alarm wiring for alteration to Terminal A Satellite.
Data and Security wiring for alteration to Terminal A Satellite.
Power, Lighting, for alteration to Terminal A Satellite.
Remodel of 4 mens and 4 womens bathrooms in Terminal A including power, lighting @ Terminal A Main Terminal and Satellite
Remodel of 4 mens and 4 womens bathrooms in Terminal A - fire alarm
Install 10 New Rids Monitors on Building Exterior
E23018 MPA New electric room and Tel-data closet. 200A panel, 45 KVA transformer, 3-60A UPS Panels, receptacles and lights.
L25010-070 - Wire and install copper and fiber to the new telecom room
Install power for new UPS equipment.
Install new low voltage wiring for new cash register.
Fit out of tenant space at Terminal A. included installation of a new feeder, 75 KVA transformer, 250A panelboard, 200A main breaker, conduit for lighting and telecommunications, a…
Install 1 power outlet for a self serve order kiosk @ Terminal A Satellite
Install 1 Data outlet for a self serve order kiosk @ Terminal A Satellite
Power, lighting for Terminal A Food Court remodel - @ Terminal A Food Court - Near Gate A17
- Fire Alarm for Terminal A Food Court remodel - Terminal A Food Court - Near Gate A17
Furnish & install (16) data drops Cat6 wiring and wiring of (15) security cameras we assumed a length of 100 feet each
Power, lighting, for a Chick-Fil-A restaurant
Renovation of the Fire Alarm for a Chick-Fil-A restaurant
Install 2 circuits and 6 receptacles for temp store @ Terminal A Logan Airport Departures Level in front of Gate A7
Install power and lighting for new store . Install one new data location
Install power and lighting for new store . Install one new data location
Install power and lighting for new store . Install one new data location
New feeder to jet bridge and replace existing breaker.
E23018 MPA Term A JTTF restroom.
Terminal A, Satellite. Install new initiating and alerting devices for break room.
Terminal A Satellite, Install new CAT wiring for break room and office area.
Terminal A, Satellite. Install new lighting, receptacles, data, and fire alarm for Delta break room. Install a new 200Amp service.
Install 21 ground service equipment charging stations at exterior gates A4, A10, A20, A21 & A22 @ Terminal A Logan Airport
Terminal A satellite. Restaurant fit-out for a Jimmy Johns. Install new power and lighting.
Refresh for existing retail store @ Terminal A DUFRY AS2-A16
Refresh for existing retail store @ Terminal A DUFRY AS2-A16
Install a new circuit from electrical panels to new 240volt 40amp receptacle.
Install power and lighting for checkpoint renovation
Install Fire Alarm for checkpoint renovation
Low Voltage Wiring for checkpoint renovation
Fit out for new retail store @ Terminal A Newslink Store 22
FA for new retail store @ Terminal A Newslink Store 22
LV for new retail store @ Terminal A Newslink Store 22
Upgrade to existing building fire alarm system within Legal Seafood Tenant Space, Terminal A Logan Airport
Lighting Fixture Replacement at Terminal A Legal Seafood Restaurant Terminal A Logan Airport
Adding lights and receptacles to existing bar
Floor raceway to be installed under carpet for power receptacles in Terminal A Delta Sky Club.
Wiring of three water heaters in Terminal A Delta Satellite.
Power and Data relocation at Delta break room at Logan Airport Terminal A.
Installation of Network Devices including Point Of Sale System, Digital Menu Boards/TV's, Local Audio System, and AudioVisual Control System.
E18046 30 cameras and 50 data jacks.
E18046 General lighting, 30 power/data outlets, 300A panel, 112.5kva transformer.
replace dish machine at Legal Sea Foods (Logan Airport Terminal A);post security
• Furnish and install (4) Speaker Zones with (53) speakers. • Provide labor to remove existing speaker locations • Provide labor to install equipment provided by Central Communicat…
E21109 BOS Terminal A UL Replacement .
Electrical circuits and connections to kitchen equipment for Temporary Kitchen at Delta Sky Club in Terminal A Satellite to allow for the construction of Phase 2 of the new Delta S…
Wire and install 4 telcom locations & install Wall mount Cabinet.
Install 30A Receptacle and Install 50 Amp receptacle.
Renovation of existing space at Terminal A, Delta Republic Fit-Out
Add 3 outlets to Delta office work area
Add 17 Data outlets to Delta Work Office
Renovation of existing space Terminal A to Delta Republic Fit-Out
Renovation of existing space, Terminal A, to Delta Republic Fit-Out
Removal of sign and make safe Electrical
Add receptacles for Terminal A Food Court
Installation of conduit and low voltage communication cabling at Terminal A and B.
Repairs and replacements of light fixtures for retail space IS Duty Free, Terminal A Logan Airport
Tenant Fitout of Harpoon Tap Room Bar/Restaurant, Terminal A Satellite Space AS2-A13/1, Logan International Airport, East Boston, MA 02128
Tenant Fitout of Harpoon Tap Room, Space AS2-A13/1, Terminal A Satellite, Logan International Airport, East Boston, MA
Tenant fitout of Harpoon Tap Room Bar/Restaurant, Terminal A Satellite Space AS2-A13/1, Logan International Airport, East Boston, MA 02128
Removal of signage- Disconnect Electrical Make Safe
Provide 120V 20A Temporary GFCI power and general lighting for construction activities per OSHA requirements on the Starbucks Coffee tenant space at the Terminal A.
Provide 120V/20A temporary lighting and GFCI power receptacles for construction activities in accordance with OSHA standards at the Delta Sky Club Project on Terminal A
Selectrive electrical demolition, relocate 45kva transformer and panelboards, new, brach circuit distribution, light fixtures, kitchen equipment, mechanical equipment and finish de…
Perform selective demolition replace existing devices, relocate existing devices and provide additional FA devices in coordination with Simplex and Massport Fire for the new Starub…
Provide selective electrical demolition, electric service distribution, new panel boards, transformer, branch circuit distribution, light fixtures, floor boxes, receptacle outlets,…
Provide a new addressable Fire Alarm System for in coordination with Simplex and MPA Fire for the new Delta Sky Club at the Terminal A per drawings and specifications.
Disconnect power & remove (4) ticket counters. Connect power & install (4) ticket counters
Disconnect data & remove (4) ticket counters. Connect data & install (4) ticket counters
Electrical demolition of Southwest area in terminal A.
Provide 120V/20A electrical temporary power and lighting per OSHA requirements for construction activities for the new Newslink store at the Terminal A Satellite store #16 TAA#5329
Provide 120V/20A electrical temporary power and lighting per OSHA requirements for construction activities for the new Newslink store at the Terminal A Satellite store #2 TAA#5337
New installation of lighting fixtures, power and lighting branch distribution, fire alarm devices, relocation of electrical service distribution at the new Newslink store #16 at th…
New installation of lighting fixtures, power and lighting branch distribution, fire alarm devices, relocation of electrical service distribution at the new Newslink store #2 at the…
Installation of new low voltage data outlets back to IT rack in tenant space for the Newslink Store #16 TAA#5329
Installation of new low voltage data outlets back to IT rack in tenant space for the Newslink Store #2 TAA#5337
Installation of new addressable fire alarm devices at the Newslink store on Terminal A Store #2 TAA#5337 in coordination with Simplex and MPA fire.
Installation of new addressable fire alarm devices at the Newslink store on Terminal A Store #16 TAA#5329 in coordination with Simplex and MPA fire.
Conduit and air blown fiber.
Wire gates 18-22 for Delta Airlines.
Wire and install tel/data for Delta Gates 18-22, terminal A.
De-energize and disconnect power form (2) signs @ Newslink#10
Remove Electrical Power from sign
De-energize and disconnect power from (2) signs @ Newslink#25
Fire alarm
Renovation of existing Tech On The Go, Terminal A, Space AS2-04/10
Renovation of existing Tech On The Go, Terminal A, Space AS2-04/10
TENANT FITOUT OF BGOOD BURGER RESTAURANT TERMINAL A SPACE AM2-A09/25 LOGAN INTERNATIONAL AIRPORT, EAT BOSTON, MA
Tenant fitout for restaurant called Alta Strada at Terminal A Space AM2-A03/29 Logan International Airport, East Boston, MA
FITOUT OF TENANT SPACE FOR NEW BGOOD BURGER RESTAURANT AT LOGAN AIRPORT TERMINAL A SPACE AM2-A09/25.
Tenant fitout for restaurant called Alta Strada at Terminal A Space AM2-A03/29 Logan International Airport, East Boston, MA
Relocate/Install Power Wiring for Self Ticket Kiosk - Delta Airlines, Logan International Airport, East Boston Mass
Relocate/Install Power Wiring for Self Ticket Kiosk - Delta Airlines, Logan International Airport, East Boston Mass
Fitout of tenant space for BGood Burger Counter Restaurant at Terminal A Logan International Airport, East Boston, MA
Updating existing and adding new electrical/data poke-thru devices.
Updating existing and adding new electrical/data poke-thru devices.
Furnish and install (27) Cat 6 locations. Furnish and install (3) patch panels in comm room s3111. Delta Airlines -Logan Airport - Terminal A
Remodel existing tower space, provide new power layout @ Terminal A Satellite 3rd floor Delta tower
Install 21 outlets for power and 21 raceways for @ Terminal A & A-SAT Logan Airport
Install 2 CAT 6 cables at 21 locations and terminate and test @ Terminal A & A-SAT Logan Airport
Install new 30A 250V receptacle to Delta oversize screener.
Wire and install two receptacles for refrigerators in Delta Club.
Power & lighting for bathroom, shower, hallway and conference room remodel @ Terminal A Delta Airlines 3rd fl
Fire Alarm for bathroom, shower, hallway and conference room remodel @ Terminal A Delta Airlines 3rd fl
Renovation of the Old Tower at Terminal A
Install pipe for Comcast tower
renovation at Old Tower at Terminal A
renovation at Old Tower @ Terminal A
Wire equipment at the Travel x kiosk at Terminal A.
power and lighting for retail store remodel @ Terminal A - Satellite - Space AS2-A05/13 Logan Airport
relocate existing FA devices per new layout @ Terminal A - Satellite - Space AS2-A05/13 Logan Airport
Disconnect and reconnect power for Travel x Kiosk.
Demo the lighting & power @ Terminal A Level 3 East
Selective demolition of existing space, relocation of existing power distribution, installation of new lighting fixtures, fire alarm, low voltage cabling and lighting controls for…
Installation of a new addressable fire alarm system and devices at the new Tumi Travel Store tenant space located on the Terminal A
Provide 120V 20 and 30A temporary power and lighting per OSHA requirements for construction activities on the new Tumi Store Tenant Space at Terminal A
Demolition of existing devices and installation of new tel data, speakers infrastructure and cctv devices on the new Tumi Travel Store Tenant space at the Terminal A.
Disconnect of ice maker and fridge on Friday night and reconnect both on Sunday
Disconnect Equipment for Store Removal (Lucky's Lounge)
Relocate panel and transformer install new 120v receptacles @ Newslink Store #27 Terminal A Logan Airport
Add smoke detector and remote indicator @ Newslink Store #27 Terminal A Logan Airport
Add (1) 120V receptacle for cooler
Power and lighting for Newlinks Store @ Terminal A
Fire Alarm fitout for Newslink Store @ Terminal A
Renovation of airline bag office for Delta Airlines, Terminal A first floor, Logan Intl Airport, East Boston, MA
FITOUT OF AIRLINE BAG OFFICE FIRST FLOOR TERMINAL A FOR DELTA AIRLINES
Bruins Bar at Logan Airport Terminal A space AS2-A07/17. Furnish and install electrical wiring and fixtures according to engineered plans.
Bruins Bar at Logan Airport Terminal A space AS2-A07/17. Furnish and install fire alarm devices , testing, terminations and programming.
Replace 13 pendant light fixtures at terminal A, Logan.
1 NetSure 7100 DC Plant and 28 Batteries. (Install 100 amp AC subpanel -12 positions 30A 208V) Furnish and install 1000 ft of 2 inch conduit for lv wiring Furnish and install 200 f…
• 40 locations with 2 CMA remotes at each locations. • 120 antenna locations , single MIMO antenna per location • 1 full rack of CMA DAS equipment. • 1 full rack of Voltserver (15…
Disconnect 80 wires and reterminate existing wires to new location Core 1) 4 inch hole and install 1 sleeve @ Terminal A
Demo (6) power outlets and install (6) new power outlets at new location for check in kiosks and help desk
Install (12) new data line to new at new location for check in Kioske and help desk
Disconnect existing (1) ATM’S and work with rigging company to wire new ATM’s @ Terminal A for Bank of America
Removal existing ticketing counters and installation of new tagging kiosks implementation at the Terminal A for Southwest Airlines, provide new conduit, circuitry and teldata infra…
Removal existing ticketing counters and installation of new tagging kiosks implementation at the Terminal A for Southwest Airlines, provide new conduit, circuitry and teldata infra…
Removal of electrical to remove equipment. Rework existing circuits and install 20 amp receptacle's.
Install new 50 Amp 3 phase circuit for fryolator
Install 4 Receptacle outlets. Terminal A
Install six strand fiber cable. install 12 data locations. Terminal A
Installation of new electrical panel and associated circuits and pump connections for the Terminal A Glycol Deicing System Upgrade.
WIRE IN OVEN PLUGS
Add tel/data to the Terminal A oversize bag screening room/
Add electrical equipment to the oversize bag screening room.
Run conduit and fiber optic cable to server room
Renovation to Tenant Space for I.S. Duty Free, Space #5; Terminal A, Logan International Airport, East Boston, MA
Renovation of Tenant Space
Tenant Renovation at IS Duty Free Space #5; Terminal A Logan International Airport
installed 5-8 cameras in Fresh City
installed 5-8 cameras in Friendlies
installed 5-8 cameras in Harpoon Tap rm
installed 5-8 cameras in Market Fresh
Terminal A Satellite Fresh City restaurant. Disconnect old sign and reconnect new sign. Disconnect menu board lighting and reconnect new menu board lighting.
Install conduit system for ACG Logan Antennaes.
Electrical renovations for WestJet in terminal A.
Repair of electrical hazards
Wire new sign at the BeRelax kiosk Terminal A post security
Installing two circuits for refrigerators. In store room next to kitchen.
installation of a new CO device, needs to be tied in to the fire alarm system
installation of a new CO device, needs to be tied in to the fire alarm system
reconfigure duplex receptacles to quads to allow for more usage
Install new Data To Training Rm
Install Electrical To Training Rm
Install outside recepticals for deicing trucks