Building permit intelligence · Boston, MA
200 Terminal Rd has 205 municipal building permits on file in Ward 1. The latest recorded activity was a electrical permit dated Jul 20, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Electrical
Electrical
Electrical
Low Voltage
Electrical
Low Voltage
1 mapped permit within 2 km, shown on the intelligence map above.
3 other addresses on Terminal Rd with municipal permit records in Boston.
This address has 205 permit records in PropertyLabs' public history and is located in Ward 1. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 200 Terminal Rd is dated Jul 20, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 200 Terminal Rd in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Electrical
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Electrical
Fire Alarm
Electrical
Electrical
Fire Alarm
Electrical
Electrical
Fire Alarm
Electrical
Electrical
Electrical
Low Voltage
Electrical
Demolition - Interior
Electrical
Electrical
Electrical
Fire Alarm
Electrical
Fire Alarm
Replacement of generator and distribution serving switchboard serving Terminal B. Installation of Trystar docking station and temp roll up generator during scope
Electrical
Electrical
Electrical
Electrical
Fire Alarm
E24006 Electrical modifications for AA Credit Union.
Install lights and heaters above rideshare curb Install a 100A panel to feed heaters @ Terminal B Garage 2nd level
Install 15 ground service equipment charging stations at exterior gates B23, B28 & B31 @ Terminal B Logan Airport
Install 2 ground service equipment charging stations at the American Airlines Hangar
Laying 24 linear feet of 4 inch PVC pipe inside of a trench from a manhole to a Verizon Telephone shack @ Terminal B outside of the garage
Refresh for duty free store @ Terminal B DUFRY SPACE BB2-A27
Refresh for duty free store @ Terminal B DUFRY SPACE BB2-A27
Refresh for duty free store @ Terminal B DUFRY SPACE BB2-A27
Installation of new FAA Antenna on roof of Term B @ Terminal B Roof above gate B9
Install a new circuit from electrical panels to new 240volt 40amp receptacle.
Run new CAT6 cables for low voltage @ Terminal B Pier B 2nd floor Public side
Replace existing outlets and add some new @ Terminal B Pier B 2nd floor Public side
Furnish & Install cat 6 cabling for 8 new camera locations mount cameras Furnish & Install cat 6 cabling for 5 new Wireless locations mount Waps
Run rigid conduit for 8 new camera locations and 5 new wireless locations on the 2nd floor level of the parking garage Install Nema4x enclosure Install (6) 110 circuits
Replace 2 existing pendant fixtures with new @ Terminal B - 2nd Floor post security - Space AB-A34
Install 2 temporary 50A feeds to fireproofing equip @ Terminal B Pier A - first floor baggage area
Connection of Electrical for Passenger Jet Bridges B1 & B2, at Logan
Repair fire at GCFI outlet, Ran New feeder for outlet, installed New GFCI
Electrical Connections for the a new Passenger Boarding Bridge
Install new 150A sub panel, disconnect and reconnect 13 overhead garage doors and install 20 infrared heaters @ Terminal B Pier A Logan Airport - 1st Floor airside
Install wiring for 4 security cameras @ Terminal B Pier A Logan Airport - 1st Floor airside
Adding 12 kiosks to Terminal B near United Airlines
Adding 12 data lines for kiosks at Terminal B near United Airlines
Eliminating 2 receptacles, replacing two thermostats and adding 2 exit signs to United Airlines Bulk Storage Rm, Terminal B, Pier A ground level.
Increase electrical service feeding a pre conditioned air unit at gate B8 terminal B.
12 way, 8way 4 way ductbank. Conductors between manhole. Retrofit HMLP. New Rapid Vehicle Charging Stations. New EFSO System
Add Smoke detector in Terminal B @ Terminal B MarketPlace Logan
Add water heater and smoke detector terminal B @ Terminal B MarketPlace Logan
Relocating cash wrap receptacles and3 wall receptacles at America retail store security side, terminal B
Relocate 4 data lines for cashwrap at America retail store, terminal B
Demolition of existing utilities and lights. Installation of new utilities and lighting.
Installation of 48 strands of single mode fiber.
Replace 2 MCP's
Disconnect and relocate date for 2 boarding podiums @ Terminal B Pier A departures level
Disconnect and relocate 2 existing boarding podiums @ Terminal B Pier A Dep Level
Install a 16 way 4" duct bank for the FAA
Disconnect (2) existing AC units and reconnect new ones @ Terminal B Pier A 1st floor
Renovation of existing space to Hudson News, Terminal B, Space BA2-A20/BA-A16
Renovation of existing space to Hudson News at Terminal B, Space BA2-A20/BA-A16
Renovation of existing space to Hudson News Ter5minal B, Space BA2-A20/BA-A16
Renovation to Tenant Space for Hudson Store, Space BA2-A07 Logan International Airport, East Boston, MA
Tenant Renovation for Hudson Retail Store, Terminal B Space BA2-A07 Logan International Airport, East Boston, MA
Tenant Space Renovation for Hudson Retail Store, Terminal B, Space BA2-A07, Logan International Airport, East Boston, MA
Installation of four (4) wireless antennas at Logan Airport.
Install lightning detection warning system at 5 locations On the 1st floor of Terminal B Pier A
Install (2) circuits for hot water heaters.
Addition of eight telecommunications data lines in Terminal B.
Renovation of the Building 58, South Cargo Building. New work includes fire alarm and HVAC upgrade.
Tenant Space Renovations for Hudson Space BB2-L05
Renovation of Tenant Hudson Space BB2-L05
Renovation of Tenant Hudson Space BB2-L05
Remove electrical from signage and make safe.
Office Renovation
Office Remodel.
Office Renovation
E19032 Ground power and bridge power for 10 jet bridges, PCAir.
Construction of a new departure and arrivals entrance roadway at Terminal B. Work also includes relocation of utilities , lighting and infrastructure for LED wayfinding signage.
Tenant Fitout Renovation for IS Duty Free Retail Store in Terminal B Pier B Space BB2-A27 Logan International Airport, East Boston, MA
Fitout of Tenant Space for North End Bar, Space BB2-A30, Terminal B Pier B Logan International Airport, East Boston, MA
Tenant Fitout of IS Duty Free Retail Store, Terminal B Pier B Space BB2-A27, Logan International Airport, East Boston, MA
Tenant Fitout of North End Bar, Terminal B Pier B Space BB2-A30, Logan International Airport, East Boston, MA 02128
Tenant Fitout Renovation for North End Bar/Restaurant, Terminal B Pier B, Space BB2-A30, Logan International Airport, East Boston, MA
Tenant Fitout of IS Duty Free Retail Space BB2-A27, Terminal B Pier B Logan International Airport, East Boston, MA
Tenant Fit Out for a Starbucks Terminal B
Disconnect and reconnect water heater being replaced, also replace safety disconnect to Water Heater for a fusible disconnect to match new unit requirements at Peet's Coffee and Te…
Provide temporary 120V/20A electrical power and lighting for construction activities in accordance with OSHA requirements for construction activities on the Not Your Average Joe's…
Tenant Fitout for Starbucks at Terminal B Pier A Space BA2-A25, Logan Intl Airport, East Boston, MA
Tenant Fitout for Starbucks at Terminal B Pier A Space BA2-A25, Logan Intl Airport, East Boston, MA
Tenant Fitout for Starbucks at Terminal B Pier A Space BA2-A25, Logan Intl Airport, East Boston MA
Provide conduit infrastructure only for low voltage and communications at the Terminal B Pier A Space BA2-A15 Not Your Average Joe's project.
New electric service distribution, 75kva transformer, panelboards, branch circuit distribution for lighting and power, new lighting fixtures, emergency lighting, lighting controls,…
Installation of a new intelligent Fire Alarm system and devices in coordination with Simplex and Massport Fire for the new Tenant Space at the Terminal B, Pier A Space BA2-A15 Not…
Disconnect and make-safe power at 3 location Smart Cart electrical @ Terminal B on the garage
Install conduit across Boutwell basement. Install fixture & receptacle @ Term B
Install smoke detectors in demarc room @ Boutwell Basement
Renovation of existing space to new Hudson News, Terminal B, Space BB2-A27
Renovation of space to new NE Market, Terminal B, Space BA2-A24
Renovation of existing space to new Hudson News, Terminal B, Space BB2-A27
Renovation of space to new NE Market, Terminal B, Space BA2-A24
Renovation of existing space to new Hudson News, Terminal B, Space BB2-A27
Renovation of space to new NE Market, Terminal B, Space BA2-A24
Wire and install electrical for fit-out of Building 58 South Cargo added scope.
Tenant Fitout of Retail Space for The New England Collection, Terminal B Pier A Space BA2-A08; Logan International Airport, East Boston, MA 02128
Tenant Fitout of Retail Space for The New England Collection at Terminal B Pier A Space BA2-A08, Logan International Airport, East Boston, MA
Electrical Fit out of Retail Store for the New England Collection in Terminal B Pier A Space BA2-A08; Logan International Airport, East Boston, MA
Installation of HMI Panels, Conduit and Cable in Massport Terminal Substations
Updating existing and adding new electrical/data poke-thru devices.
Updating existing and adding new electrical/data poke-thru devices.
Wire GSE chargers for vehicle charges stations. Power from existing distribution panels to chargers @ 200 Terminal Rd
Electrically remodel area of Terminal B for Southwest baggage conveyor.
Renovation for Retail Store at Terminal B Space BA2-A10 Logan Airport for MAC
Renovation of Retail Space Space BA2-A10 Terminal B Second Floor Logan Airport for MAC
Tenant Space Renovation into Retail Store for MAC
Renovation of existing space BA2-A09, Logan Airport, Terminal B, Secured area to a new In Motion store.
Renovation of existing space BA2-A09, Terminal B, Logan Airport, secured area, to a new In Motion store.
Renovation of existing space BA2-A09, Logan Airport, Terminal B, secured side to a new In Motion store
Renovation of existing space to new Vineyard Vines, Terminal B, space BA2-A12
Renovation of existing space to new Vineyard Vines, Terminal B, Space BA2-A12
Renovation of existing space Terminal B, BA2-A12 to new Vineyard Vines
Install security cameras for AA in Terminal B.
Electrical service for two new airfield snowmelters.
Provide 120V-20A temporary power and lighting for construction activities per OSHA requirements on the QSR Pizza Project at Terminal B Pier A Space.
Provide new addressable smart Fira Alarm devices in coordination with Simplex and Massport Fire for the new tenant space at the Terminal B Pier A project.
Provide new breakers at existing panelboards, new branch circuit distribution for lighting and power, new lighting fixtures and controls, installation of new kitchen equipement, se…
Provide 120V/20A Temporary power and lighting per OSHA requirements for construction activities for the remote ARFF Project L1418-C1 at Logan Airport.
Demolition of existing Fire Alarm at existing to be demolished HVAC equipment and installation of new FA devices at new HVAC equipment at the ARFF Station Satellite at Logan Airpor…
Demolition of existing electrical power and fire alarm to HVAC equipment and outdoor condensing units, installation of new electrical power and fire alarm to new HVAC equipment and…
4 way communication duct bank between airport control tower and boutwell building
make safe electrical demo arrival level bag room.
Temporary News Wall at Logan Airport Terminal B Pier A Space BA2-A07.
Temporary News Wall at Logan Airport Terminal B Pier A Space BA2-A07.
Power and lighting for Dunkin Donuts remodel @ Terminal B - Pier A Space BA-A07
Fire Alarm for Dunkin Donuts remodel @ Terminal B - Pier A - Space BA-A07
Power to new electric heat for elevated walkway between Central Garage and Terminal B.
Renovation of existing space at Terminal B, post security to new Tamazcal Restaurant
Renovation of existing space to new Tamazcal restaurant, Terminal B, post security
Renovation of existing space at Terminal B to new Tamazcal restaurant
Install conduit, wire & devices for Cooler Installation @ Hudson News Space BA2-A28/BA-A30 Store #1933
Disconnect of Signage and Equipment
Fit Out of the garage space for American Airlines –GSE Relocation
Furnish and install the following Tel/Data locations for American Airlines –GSE Relocation
Fit out of the garage space for American Airlines –GSE Relocation
Install pipe for Comcast tower
Relocation of Southwest Airlines at Terminal B Pier A Logan Intl Airport, East Boston, MA 02128
Relocation of Southwest Airlines to Terminal B Pier A Logan Intl Airport, East Boston, MA 02128
Relocation of Southwest Airlines to Terminal B Pier A Logan Intl Airport, East Boston, MA 02128
Provide (1) 30A circuit and shunt trip breaker for an additional Pizza Oven
Wire and install electrical and FA fit-out for concessions in Terminal B, Pier A, Logan airport.
Install ladder tray Pathway for 57 locations with 2 CMA remotes at each locations. Install 2 inch conduit Pathway for 163 Omni antenna locations. Install 2 inch conduit Pathway for…
(57) locations with 2 CMA remotes at each locations. (57) Fiber runs to cma remotes (163) Omni antenna locations. (46) Directional Antenna locations
Renovation of the Building 58, South Cargo Building. New work includes fire alarm and HVAC upgrade.
Wire new jet bridge for gate B17.
Wire new jet bridge for gate B8.
Wire new jet bridge for gate B7.
Re: Legal Seafoods Wire for new ice cube maker with remote rooftop condenser and exhaust fan
New electrical power distribution, transformers, panelboards, branch circuit distribution, lighting fixtures, lighting controls, fire alarm, kitchen equipment, mechanical HVAC and…
Installation of a new addressable fire alarm system and devices in coordination with Massport Fire and Simplex for the new Monument Tavern Restaurant project at the Terminal B.
Provide electrical temporary lighting and power 120v 20 and 30A per OSHA requirements for construction activities for the new Monument Tavern project on the Terminal B
Pier A-Electrical & Telecom -Logan Airport @ 200 Terminal RD
Pier A-Electrical & Telecom -Logan Airport @ 200 Terminal RD
Pier A-Electrical & Telecom -Logan Airport @200 Terminal RD
Added receptacles, branch wiring, and empty conduits for new tel-data scope
New tel-data drops and cabinet for Hawaiian Airlines New Station
Renovation of Existing Retail Space for Starbucks Coffee Shop Space BB2-A06, Terminal B Pier B, Logan Airport, East Boston, MA
Renovation to Existing Retail Store, Hudson News Space BA2-A18/A14 Terminal B Pier A Logan Airport, East Boston, MA
Renovation of Existing Retail Space for Starbucks Coffee Shop Space BB2-A06 Terminal B Pier B, Logan Airport, East Boston, MA
Renovation to existing Hudson News Space BA2-A18/BA2-A14 Terminal B Pier A, Logan Airport, East Boston, MA
Renovation of Existing Retail Space for Starbucks Coffee Shop, Space BB2-A06, Terminal B, Pier B, Logan Airport, East Boston, MA
Renovation to Existing Retail Store Hudson News Space BA2-A18/A14, Logan Airport Terminal B Pier A
Added branch circuitry and devices for a new Video Wall in Terminal B, Pier B
Renovation of the Building 58, South Cargo Building. New work includes fire alarm and HVAC upgrade.
Disconnect Sign for Starbucks
Install 3 120V outlets for coolers @ Terminal B Logan Airport/Potbelly Restaurant
Retail Store Renovation for Hudson News Space BA2-A32/39, Terminal B Logan International Airport, East Boston, MA