Building permit intelligence · Boston, MA
1001 Boylston St has 237 municipal building permits on file in Ward 5. The latest recorded activity was a signes permit dated Jul 16, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Signs
Plumbing
Plumbing
Plumbing
Change Occupancy
Change Occupancy
2 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Boylston St with municipal permit records in Boston.
This address has 237 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1001 Boylston St is dated Jul 16, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1001 Boylston St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Change Occupancy
Change Occupancy
Change Occupancy
Electrical
Fire Alarm
Electrical
Fire Alarm
Fire Alarm
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Electrical
Electrical
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Plumbing
Installation of (1) new 400A Eversource Meter
Installation of Low Voltage Cabling for AV use. Floors 3 and 4 Weil.
Weil @ P12 Floors 3 & 4. MISC Low Voltage HVAC Control Wiring AG 253765
Low Voltage Wiring permit for Tel/Data & speakers for Sound masking for Weil at 1001 Boylston St 3rd & 4th Floors
Renovation of an existing space inside on levels 2, 3, and 4. Furnishing and installing new waste/ water pipe, fixtures and equipment.
we are changing 2 smokes 2nd floor restroom to heat detectors
Job site address is 400 Newbury St. There was no 400 Newbury St available on the portal. I used the closest address available per instructions from phone conversation with ISD cash…
Changing two smokes located 2nd floor restroom to heat detectors.
Electrical Work Associated with Tenant Fit out on the 3rd & 4th Floor
Electrical Fire Alarm work associated with Tenant fit out on the 3rd & 4th Floor
Weil Boston, Levels 3 &; 4. Interior fitout on the 3rd and 4th floor, including, selective demolition, rough carpentry, millwork, doors frames &; HDW, GWB, Act Ceilings, flooring,…
Installation of New 120V Feed for New 1001 Boylston Street Sign on Exterior of the Building
Core drilling on the 3rd floor for sanitary piping and electrical poke-thru devices into 2nd floor ceilings, prior to ceiling closure below. No demolition or structural work includ…
Hotel, Offices, Retail; to include car dealership, Restaurant/Bar, Retail, Ice Cream Shop &; Restaurant w/ sit Down, Take Out &; Live Entertainment #38Certificate for;Restaurant w/…
Add 1 light fixture and relocate 1 EBU and Exit Sign. Demo power to VAV
Samuels - 3rd floor corridor work rework corridor for new tenant that includes electrical, removal of lab ductwork and relocate up to 6 sprinklers. work does not change egress not…
Installation of (1) illuminated blade sign to read "George Howell Coffee" and the installation of (1) illuminated wall sign to read "George Howell Coffee".
hvac controls
Application for use of premise for George Howell Coffee to utilize 14 outside seats as accessory use to the building for first floor retail suite #7.
Hotel, Offices, Retail To Include Car Dealership, Restaurant/Bar &; RetailCertificate for Offices - 5th FloorALT1670156 Issued 12/3/2024
Hotel, Offices, Retail to Include Car Dealership, Restaurant/Bar &; RestaurantCertificate for Restaurant ( Suite 1000 )ALT1615396 Issued 10/11/2024 &; ALT1632311 Issued 5/14/2025
Amendment to memorialize Owner's layout changes and kitchen/bar equipment updates, add one urinal to increase occupancy under 248CMR and for review of exterior seating (no work on…
; ;Hotel, Offices, Retail; to include car dealership, Restaurant/Bar &; Café; Certificate for;Café @ 408 Newbury Street.;; ALT 1656060 Issued January 28, 2025;
Provide 208-volt 30-amp branch circuit to power illuminated "Double Hearts Sculpture" located at Level 2 Podium. Run circuit to office tower main electric room, R222 panelboard.
Connect furniture feeds for 104 furniture stations.
Installation of camera system at 1001 Boylston St Retail #7 for new George Howell Coffee location
Installation of a concrete pad and pavers for public artwork installation.
;Hotel, Offices, Retail; to Include Car Dealership, Restaurant/Bar, Retail &; Ice Cream Shop;Certificate for Ice Cream Shop;ALT1675982 Issued March 07, 2025;
Installation of (2) New Eversource Utility Meters For New Tenant Fitout on the 5th Floor. Meters to be 200A
Hotel, Offices, Retail; to Include Car Dealership and Restaurant/BarCertificate for Restaurant / BarALT1608740 Issued 7/11/2024
Hotel, Offices, Retail; to Include Car Dealership.Certificate for Package Room on the 1st floor.ALT 1599398 Issued July 22, 2024;
Install building identification on Boylston Street per BPDA approval.
Re-locate an existing electric water heater on level 1 of an existing space at 1001 boylston st (parcel 12).
Hotel, Offices, Retail, Car Dealership and Restaurant/BarCertificate for New Corridor and Lobby Entrance @ 1001;ALT1631647 Issued 9/18/2024 &; A1695953 Issued 3/18/2025
Install and terminate wiring for Tel/data, speakers, CCTV, and Security
Install restaurant signage at specified location suite 1000 Se attached BPA approved plans
;Clarification of scope of work: FULL M.E.P.S. Fit out of existing commercial core and shell space into a new ROSA Y MARIGOLD restaurant with interior live entertainment and access…
Rosa Y Marigold tenant run 6 cat 5 cables for pos
Rosa Y Marigold tenant new 225 amp meter and feed
Rosa Y Marigold tenant add to existing loops 4 devices
The scope of work includes layout, interior selective demolition (NO EXTERIOR WORK), saw cutting / trenching, and under slab plumbing. The scope of work and costs associated with t…
Fitout of Rosa Y Marigold Restaurant Space
Fitout of Rosa Y Marigold Restaurant space, 400 Newbury St.
; ;Hotel, Offices, Retail; to include car dealership and Restaurant/Bar.;; ;Certificate for Amenity Space on the 3rd floor.; ALT1618077 Issued September 18, 2024
Hotel, Offices, Retail to Include Car DealershipCertificate for Offices - Floors 6-10ALT1603812 Issued 6/26/2024
;;Hotel, Offices, Retail; to include car dealership, Restaurant/Bar &; Bubble Tea Shop; Certificate for;Bubble Tea Shop ( 400 Newbury Street ); ALT1622415 Issued November 08, 2024;…
New fire alarm devices being tied into an existing system on the 1st floor for tenant Van Leeuwen Lyrik Ice Cream
Provide new service feeder for future Tenants
Speakers and cat 6 lines
Citizen M Hotel Rooftop Bar Fit-Out. Misc. Low Voltage HVAC Control Wiring. JG-253180
Electrical Fire Alarm Work Associated with the Tenant Fitout. Installation of new smoke detectors throughout.
Install wiring for HVAC, lighting , power for the tenant fit out of Van Leeuwen.
Add devices to existing fire system
Category 6 cabling for POS system and CCTV. Low Voltage wiring for Sound System.
run wires for cameras, pos, data, music AVRA restaurant
Samuels Amenity Space - 1st floor adding fire alarm work for approved "special event" for Boston Marathon pop up space permits approved for special event. Amend permit # ALT1631647
New construction of a rooftop bar for the CitizenM Hotel.
relocate fire alarm devices for tenant fit-out add 2 A/Vs
Parcel 12 Lego 5th Floor. Misc. Low Voltage HVAC Control Wiring. AG-253129
Add occupancy for a ice cream shop - buildout of a new small ice cream shop first generation tenant. Work includes minor modifications to the existing FA and sprinkler system
F/I NEW FA DEVICES AND WIRING FOR NEW COFFEE SHOP FITUP TIED INTO EXISTING NOTIFIER BASE BLDG SYSTEM
F/I NEW CABLING TO POS AND WALL TV'S
F/I NEW LIGHTING, DEVICES, WIRING, PANELBOARDS, TRANSFORMER FOR NEW COFFEE SHOP
-Water, sanitary, vent, and kitchen waste piping, 1 water meter, 1 expansion tank, 2 floor drains, 2 floor sinks, 1 grease trap, 1 lavatory, 3 mixing valves, 2 trap primers, 1 wate…
Fitout of Avra Restaurant
Fitout of Avra Restaurant
Provide 400amp Feeder to Retail space from existing switchboard. Provide new 400amp panel, 75kva transformer and 200amp panel. Add to temp lighting (x6 lights) and power devices (x…
HVAC Controls
Job #19020 Lego 5th Floor AV System install
Job #18955 Lego 5th Floor Security system install
Install (1) halo-lit channel letter set "RIVIAN" per BPDA/Highway approved drawings (45.7sf)
wiring new restaurant fit up in new building
Electrical Work for (1) Small Storage Room at Level P1 of 1001 Boylston Street
Install 2 wall signs at 2nd floor, 1 canopy sign and 1 blade sign at first floor Design is approved by BPDA
PROPOSED CAFE AT 408 NEWBURY STREET #7 WITHIN APPROXIMATELY 1335SQUARE FEET. PROPOSED PROJECT WILL INCLUDE FRONT-OF-HOUSE WITH CUSTOMER SEATING, RESTROOMS, COMMERCIAL KITCHEN, AND…
Tel Dat work on floor 5 Devices: 235
Installing new fire alarm devices in rooftop space of CitizenM Hotel.
Tenant fit out at penthouse level @ Citizen M Hotel- Bubbel Bar. Add branch circuits, lighting & lighting controls, wire mechanical equipment.
Plumbing for a bubble tea drink shop
Tenant fit up for bubble tea store, power, lighting and outlets. Space is located at Retail 3 in the building, under ALT1622415.
ELECTRICAL FIRE ALARM WORK ASSOCIATED WITH NEW TENANT FIT OUT ON THE 5TH FLOOR
ELECTRICAL WORK ASSOCIATED WITH TENANT FITOUT ON THE 5TH FLOOR & MECHANICAL EQUIPMENT ON THE 21ST FLOOR
3-1/2 baths hand sinks mop sink
Reno to install on the 5th floor, 1-emergency eyewash, 1-lav, 3-kitchen/pantry sinks, 1 laundry box, 1-water closet, 1-floor sink, 3 Electric water heaters, 1-water filter, 1-mixin…
Connecting furniture feeds for office furniture
Parcel 12 Rivian Misc. Low Voltage HVAC Control Wiring. AG - 242971
install new tenant fire alarm adds to existing loops AVRA restaurant 2nd floor
install new tenant service, lights, power, for AVRA restaurant 2nd floor
Lego- 5th Floor Interior build out of 20,000 SF of offices tenant finishes include demo, drywall partition, electrical/fire alarm/low voltage, sprinkler, plumbing, HVAC, structural…
Installation of (10) New Eversource Utility Meters For New Tenant Fitout. All of the (10) Meters will be 200A
*INTERIOR FITOUT ONLY Change Occupancy to include Restaurant with #37 (Sit-down)TFO for full service restaurant, includes pavers, concrete, stone, steel, fireproofing, stairs, mill…
Tenant fit up for new bubble tea store (Store name: Chicha San Chen) [ePlans];
Parcel 12 Samuels Amenity Space & Plaza. Misc. Low Voltage HVAC Control Wiring. AG - 242875
Install network and AV cabling
CHANGE OF OCCUPANCY Complete buildout in existing approved space including all rough and finish sub contractors framing/ plumbing/ electrical/ hvac and drywall. re - fit sprinkler…
Electrical work associated with Tenant fit out on the 3rd Floor. Installation of new Light Fixtures, Switches and Receptacles throughout.
Electrical work associated with Tenant fit out on the 1st & 2nd Floors. Installation of new Light Fixtures, Switches and Receptacles throughout.
Electrical work associated with Tenant fit out on the 1st Floor. Installation of new Light Fixtures, Switches and Receptacles throughout.
Electrical Fire Alarm Work Associated with Tenant Fit Out. Installation of New Speaker Strobes on the 3rd Floor
Electrical Fire Alarm Work Associated with Tenant Fit Out. Installation of New Speaker Strobes on the 2nd Floor
Electrical Fire Alarm Work Associated with Tenant Fit Out. Installation of New Speaker Strobes on the 1st Floor
installation of new pump drain foe elevator
Install new KS, floor drain and HWH as part of new tenant fit out
Interior non-structural demo ahead of ALT1631647 being issued.. Full project cost reflected under ALT.
Interior non-structural demo ahead of ALT1618077 being issued for the amenities space. Full cost o project reflective under ALT.
Rough Plumbing Underslab work for incoming Bar and restrooms
Hotel, Offices, Retail;Certificate for Offices, Assembly Space and PergolaALT1477993 Issued 5/31/2023 &; A1512978 Issued 9/11/2023
Hotel, Offices, Retail;Temporary for Floors 12-20 - Offices and Assembly Space , adding Floor 21 interior space only - Valid for 90 Days, To Expire 12/3/2024ALT1477993 Issued 5/31/…
New corridor and lobby entrance for 1001 Boylston St. Interior work to include new stairs, electrical, flooring, sprinkler/ fire alarm modifications and lighting.
Interior fitout. Work to include new MEP/FA/FP, lighting, walls and interior finishes for an amenity space.
Job #18456 Lego Floors 6-10 Install AV system.
Change occupancy to include retail space. Demising of retail tenant space (4) and installation of new retail elevator. Work to include the construction on non-structural walls, ele…
Parcel 12, LEGO. Misc. Low Voltage HVAC Control Wiring. AG - 242762
Hotel, Office's, Retail and Parking Garage.Certificate for Hotel, Garage, Future Tenant Spaces for Office and Retail Uses.ERT1037077 Issued 7/2/20,; A1242341 Issued 12/14/21,; A139…
Tel Data work on floors 6 through 10 - Devices: # 1,100
Add Vehicular Guardrail to protect emergency generator. BFD and ISD agreed on plan and require this amendment to ERT1037077eplan
Underslab plumbing work (Cost reflected on ALT1638093), for fitout of a restaurant on the 2nd floor. We need permission to start the underslab plumbing work now, while the ALT is b…
Relocation of exiting water main and vent piping at Retail Space 4. Added floor sinks, and future sanitary and kitchen waste piping and vent connections at Retail Spaces 1, 2, & 3.
Renovation of levels 5 through 10. Furnishing and installing fixtures, equipment, waste pipe, and water pipe.
24 Strand Fiber from MPOE to Customer MDF on 8th Floor
;Hotel, Offices, Retail &; Car Dealership;Certificate for Car DealershipALT1567130 Issued March 27, 2024
Hotel, Offices, Retail and Parking Garage.Temporary Certificate for Office Tower Core and Shell with Ownership Offices, Future Tenant Office Spaces and Parking Garage Phase I, Core…
Demo and clean out of existing space explore utilities and saw cut concrete for future buildout on separate permit
REFERENCE STATE BUILDING PERMIT # BLD20-0338 - RENOVATION OF THE MBTA HYNES STATION PEDESTRIAN TUNNEL AND ASSOCIATED AREAS, INCLUSIVE OF THE PEDESTRIAN TUNNEL LOBBY, MBTA STAIR HEA…
Reference State Building Permit # BLD20-0338 - Renovation of the MBTA Hynes Station Pedestrian Tunnel and associated areas, inclusive of the Pedestrian Tunnel Lobby, MBTA Stair Hea…
Build out package room for tenant space - 1st floor work includes drywall, electrical/fire alarm, sprinkler, mechanical plumbing and finish work.
Pull cable install speaker and displays
Relocation of 6" gas main at Retail Tenant Space 4
Install of new internally illuminated blade sign and internally illuminated fabricated metal channel letters.
Change occupancy to add restaurant/bar,Tenant fit out at penthouse level @ Citizen M Hotel - Bubbel Bar. Work to include; MEP's, sprinkler and fire alarm relocation. Also, finishes…
Job #18329 Lego Floors 6-10 Security Install
LEGO - 6,7,8,9,10th floors buildout of new offices work includes drywall, electrical/FA, sprinkler, plumbing, HVAC, interconnecting structural stair, associated finish work
Electrical Fire Alarm Work Associated With New Tenant Fitout On Floors 6, 7, 8, 9 & 10.
Electrical Work Associated With New Tenant Fitout on Floors 6, 7, 8, 9 & 10.
Lego - 6-10th floor remove existing walls and prepare for new layout for ALT # 1603812
Install and wire 4 thermostats
Tenant fit out of RIVIAN located at retail space #09, Level 1 Podium. Includes wiring for Access Control System and Intrusion Alarm System.
Running Category 6 & 6A cabling for phone, internet, & cameras
Install wiring within office cubicles on floors 12-19 for Car Gurus
Change of occupancy to include car dealership for Rivian. THE PROJECT CONSISTS OF ~5,120 SF IN AN EXISTING BUILDING. PROGRAM: ELECTRIC VEHICLE SHOWROOM, RESTROOM, AND ASSOCIATED BA…
New 4" gas line to serve future tenant in Retail Space 13.
Tenant fit out for RIVIAN located at retail space #09, Level 1 Podium. Includes wiring for Lighting, Power and empty conduit systems for Tel, Data, CCTV and Access Control System.
Tenant fit out for RIVIAN located at retail space #09, Level 1 Podium. Includes wiring for fire alarm system devices.
Plumbing for new Rivian tenant-fit up, including (1) washer box, (1) lavatory, (1) undermount sink, (1) water closet, (1) mop sink, (1) garbage disposal, (1) circulation pump, (1)…
Installation of (10) New Eversource Utility Meters For New Tenant Fitout. (8) of (10) Meters Will Be 200A, (1) of (10) Meters Will Be 125A & (1) of (10) Meters Will be 320A
23-0273-10 Cargurus AV
23-0221-20 Security Cargurus
14 story hotel with amenity space on first floor
23-0222-10 CarGurus 12-21 T/D S/M
Installation of Pre Action System
Installation of Pre Action System
Office fit-out of an existing space for floors 11-21. Furnishing and installing new plumbing fixtures, equipment, waste and water pipe.
installation of low voltage automation system @ CarGurus @ Parcel 12
Installation of one 68" high x 51 1/2" wide internally illuminated parking blade sign. Approved by BPDA.eplan
Approval of pergola from BPDA to be built on roof deck on 21st floor under permit ALT1477993, all cost was submitted under original permit cost
Install 2 dedicated 20 amp 120 volt feeds for exterior signage
Installation of Pre-Action System 2 Zones
Installation of Pre Action System 2 Zones
Electrical Work Associates With New Tenant Fitout on Floor 12, 13, 14, 15, 16, 17, 18, 19, 20, & 21
Fire Alarm Work Associates With New Tenant Fitout On Floors 12, 13, 14, 15, 16, 17, 18, 19, 20 and 21
Security cabling for a new 14 story Hotel
Low voltage cabling for 14 story hotel
Install Control wiring in 14 story hotel
car gurus - 12-20th floor - Provide temporary 2 hour rated enclosure for TCO for base building at 10 story interconnecting stairs part of future tenant space. WORK PAID FOR on APPR…
CarGurus - 12 - 21st Floors -; Office Buildout.; Work includes : new assembly space, a warming kitchen and work to an existing roof deck. Work includes: demolition, concrete, steel…
Temporary 800amp generator for temporary power at parcel 12 hotel side of project. For limited use until eversource can turn on permanent power to the building
CarGurus 12-20 Provide temporary 2 hour rated enclosure for TCO for base building at 10 story interconnecting stair (part of future tenant work)
Supply and install a new set of internally illuminated channel letters as per the attached drawings.
Car Gurus - Install structural steel for partial permit work for interior stairway for future tenant work on floors 11-20, Associated finishes to be filed under separate permit COS…
CarGurus - Manufacture and install a new internally illuminated channel letter wall sign as per BPDA approved drawings.
This permit amendment includes documentation in support of a phased occupancy approach. Pursuant to 780 CMR 111.3, a temporary certificate of occupancy will be requested before the…
Amend ERT1037077 for mixed-use air rights project consisting of an office building at the;intersection of Mass Ave and Boylston Street and a Hotel at the;intersection of Mass Ave a…
Installation of 6" gas main for future connection by others.
Provide wiring for temporary 800KW portable diesel generator. The generator will feed a tower crane for construction of a 20 story office tower.
construction of a new 399 room hotel
construction of a new 399 room hotel
14 story hotel with underground electrical work
Parcel 12 Office&Podium, 1001 Boylston St. Misc Low Voltage HVAC Control Wiring - AP - 219343
Network wiring for base building
Installation of new wiring for access control system including card readers, cameras, and intercoms.
Wiring and grounding of temporary 400KW, 480/277V, 3-Phase, 4-Wire Diesel Generator. Utilize portable generator cables to feed temporary service.
New mixed use project consisting of 21 story office building with a plaza and hotel.
Enabling for I90 ramp relocation and median demolition. Installation of new tunnel lighting and controls, cameras, SCADA system, antenna, and fire alarm devices
New construction of 20 story Office Tower with 2-Levels of underground parking and Podium spanning over the Mass Pike. Includes site power, lighting, City of Boston Street lighting…
Temporary service for construction of Parcel 12 Office Tower & Podium. Eversource Work Order #2394019 - Work Order Address: 1081 Boylston Street 3-Phase, 277/480 Volt, 2,500 Amp te…
New Fire Alarm System for 20 Story Office Tower with 2-Levels of underground parking and Podium Area.
New mixed-use project comprising a total gross square foot area of 657,000 square feet consisting of an office building at and over the;intersection of Mass Ave and Boylston Street…