Building permit intelligence · Boston, MA
133 Beacon St has 16 municipal building permits on file in Ward 5. The latest recorded activity was a gas permit dated Jul 13, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 9 mapped permits within 2 km of this address.
Gas
Gas
Gas
Extend legal occupancy of the building as a dormitory beyond the current expiration date of 6/30/19, as set by previous Board of Appeal proviso. No work to be done. *BOA Proviso De…
-Replace existing fire alarm system with new addressable system. -Add low frequency sounders in sleeping areas. -Change all alarm devices to addressable type. -Add CO detector in B…
9 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Beacon St with municipal permit records in Boston.
This address has 16 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 133 Beacon St is dated Jul 13, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 133 Beacon St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fisher College Dorm -Replace existing fire alarm system panel and alarm devices with new addressable type. -Install low frequency audible devices in rooms. -Replace A/V Devices. -R…
Replacing old control door wiring for new wiring for the main entrance/Rear Entrance/ A wiring for hatch up on the roof/Card Reader/Rex/Dps/ Update new control box and new power fo…
removing existing rooftop unit and replacing with new unit - all work not visible from any public way - in rear alley
This application seeks to extend the legal occupancy of the building as a dormitory beyond the June 30, 2009, deadling imposed as a proviso as a past decision of the Zoning Board o…
New data wiring
Removing and replacing with same one roop top unit
4th floor dorm damage ceiling to be replaced. skimcoat and painted.
Water damaged 2 rooms replacing on 4th floor all electrical wiring 5th floor 2 rooms with wet wiring to be replaced
NEW BATHROOM
plumbing - 1/2 bth in basement - rmdl 4thfl bthrm - chnge brass waterpipe
install walls for 1/2 bath inbasement; no exterior work
Electrical Low Voltage · LVOLT · Jul 20, 2026