Building permit intelligence · Boston, MA
2400 Beacon St has 58 municipal building permits on file in Ward 21. The latest recorded activity was a gas permit dated Jul 21, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Gas
Plumbing
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
1 mapped permit within 2 km, shown on the intelligence map above.
12 other addresses on Beacon St with municipal permit records in Boston.
This address has 58 permit records in PropertyLabs' public history and is located in Ward 21. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 2400 Beacon St is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 2400 Beacon St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Renovations - Interior NSC
Plumbing
Other
bathroom remodel
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Plumbing
Renovations - Interior NSC
Plumbing
Electrical
Renovations - Interior NSC
Electrical
replace 1st floor shower, toilet and lab sink. cap off and remove soaking tub
Install light fixture inside of closet.
REPLACE 2.5 BATHROOM FIXTURE AND KITCHEN FAUCET. UNIT 103
Unit#103, Two full bathrooms and one half bathroom remodeling , paint entire unit, Install new hardwood at two bedrooms, sand , stain.
Unit 201 remove and replace fixtures repipe shower drain and new shower valve
replace shower valve, remove tub, cap lines and extend the shower to a double shower; UNIT 201
Remodel to condo secondary bathroom. No structural work. Existing bathroom footprint to remain the same. NO UNIT NUMBER;
Renovate bathroom and kitchen
install 26 recess lights in condo
Painting, Re-finishing Floor, Adding Recess Lights, Bathroom Remodeling - work in Unit#108
Kitchen under cabinet lighting
Gas Line for Boilers
Wire 2 bathrooms, replace panel , 3 envi wall heaters , 2 underfloor heating mats. work to be done in unit 606
Installation of (2) toilets, (2) lav sinks, (2) showers, and 1 laundry sink
Disconnect and cap gas stove
unit 606 at 2400 beacon street replace all existing existing fixtures in two bathrooms paint unit install new carpet
New Security System
All work will be done in unit 303. Install (32) 5 inch led recessed Wire new kitchen applainces and install (2) closet lights
renovations of kitchen, master bath, guest bath, 1/2 bath Unit 303
gas stove swap: Unit 303
renovation of bathrooms with no square footage changes or moving of any plumbing fixture locations, new kitchen countertops
Installation of Electric Heat Controls. Replace Qty. 12 - Metal Halide wall pack style fixtures with equivalent LED fixtures. Replace Qty. 10 - Linear Fluorescent fixtures with equ…
Remove old sheet rock ceilings, install new sheet rock ceilings in 5 Units of a condominium building.
Install tv's in living room and bedroom. Run circuit for Jacuzzi tub. Install light fixtures throught unit
Install lighting fixtures and bathroom lighting fixtures. Re wire kitchen appliances in existing location. Disconnect/re connect. Install new devices on countertop.
Replace 2000 amp bus duct riser. Common area lighting and power. Units that were affected from flood. Units 605, 501, 502, 506, 507, 508, 509, 514. Misc repairs lighting and power.
gas work to change fireplace - floor 6 unit 603
install electrical finish
Install Security System
Wiring for bathroom to;living room;renovation. Unit 106
remove one shower valve. Cut and cap the hot and cold water and plug the drain at the stack
remove shower and cap off,remove surrounding wall,add 4' wall &; finish.Some electrical as needed,finish paint.Work to be done in unit#106
Install Security System
Install Recessed lights and switching for unit. also install Outlets and light fixtures per customer.
Converting tub/shower into shower only
unit #114: replace master bath TUB/Shower with a shower stall (remove tub &; retile)
replace gas fired water heaters with indirect water heaters off existing boilers