Building permit intelligence · Boston, MA
151-153 Beacon St has 13 municipal building permits on file in Ward 5. The latest recorded activity was a electrical permit permit dated Jul 22, 2026. Permits at this address represent $500K–$1MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
- Verify all life safety systems are able to be re energized after sprinkler head burst.
Remove carpets and install new HW Flooring in three rooms, Remove and Install two new vanities. Install new trim and applied molding. Painting and wallcovering. Unit 4
Creation will fabricate an exterior window bar, inspired by the design seen on image #1 on the approved quote. After applying primer, the bars will receive a fresh coat of paint fo…
Snaking (1) 20a 120v feed to a wine fridge.
new kitchen, master bedroom/ bath , general upgrades to unit , replace panel
1 mapped permit within 500 m, shown on the intelligence map above.
12 other addresses on Beacon St with municipal permit records in Boston.
This address has 13 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 151-153 Beacon St is dated Jul 22, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 151-153 Beacon St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
First floor kitchen Remodel and Basement bathroom remodel
First floor kitchen Remodel and Basement bathroom remodel
Gut renovate kitchen and primary bathroom. Installation of millwork, interior doors, and built in’s. Refinish Hardwood floors.
Replace garden curve stones; Remove stones; Reset cast stones
replace existing kitchen appliances, switches, oulets and undercabinet lights. work to be done in unit 2
kitchen faucet dishwasher disposal and ice maker
gas cooktop hookup
Unit 2 (First floor of building) Supply and install new cabinetry and counters in same location. Install new appliances Tiled back splash and painting. Walls, floors, ceilings to r…