Building permit intelligence · Boston, MA
2 Hawthorne Pl has 145 municipal building permits on file in Ward 3. The latest recorded activity was a plumbing permit permit dated Jul 29, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 11 mapped permits within 500 m of this address.
Replace shower valve and bathroom fixtures re-pipe kitchen sink
Electrical
Renovations - Interior NSC
Electrical
Plumbing
Renovations - Interior NSC
11 mapped permits within 500 m, shown on the intelligence map above.
1 other address on Hawthorne Pl with municipal permit records in Boston.
This address has 145 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 2 Hawthorne Pl is dated Jul 29, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 2 Hawthorne Pl in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Low Voltage
Electrical
Plumbing
Unit 106N. Renovate existing 700 sq ft medical offices. Add accessible washroom. Replace suspended ceiling. Remove carpet and install vinyl floor. Painting interior. [ePlan]
Fire Alarm
Demolition - Interior
Interior/Exterior Work
Electrical
Plumbing
Renovations - Interior NSC
Signs
Low Voltage
Plumbing
Plumbing
Electrical
Wire remodel areas for lights, receptacles, switches, appliances and CATV…replace apt. electrical panel with 16 circuit to access new circuits Apt. 2a
Gas
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Other
Renovations - Exterior
Plumbing
Plumbing
Electrical
Replacing 13 windows in condominium.
Work to be done in unit 8R. Bathrom gut of walls and fixtures. Keeping tub. Install new wallboard/plaster, tile, paint, fixtures, vanity.
replace/install/repair exit signs
Kitchen and bathroom renovations
Kitchen renovation
Install/rework wiring in remodeled kitchen
Replace existing tub/shower valve with a new tub/shower vavle
Kitchen renovation with removing partial wall and adding a wall. This will include new cabinets, countertops, flooring, etc
Rewire kitchen. install new lighting in bedroom and bathroom, new bath receptacles.
Install 3 120v battery back uu smoke detectors
rolocate stove
replace toilet lavatory bathtub and kitchen sink
Renovate kitchen and bathroom in Unit #10-R. Upgrade electrical panel and install recessed lighting. New wood floors.
Waterproofing and Thru-wall Flashing
Replace existing windows and sliding glass doors in (9) units. Unit numbers: 9D, 7J, 5R, 5C, 5B, 17P, 17O, 17D, AND 15G
Remove Existing Illegal Passage Door/Frame Connecting Unit 10-O to Adjacent Unit 10-N and lose in Opening. Frame, Drywall and Finish
replace tub, toilet, kitchen sink and lavatory
replace gas stove
Rewire kitchen and replace breaker panel. Add bathroom outlets and lights. Rewire and replace smoke detectors
10th floor Unit-O Renovate Kitchen and Bathroom, Paint entire unit.
Remove existing valve & replace with a new valve.
Replacement of freestanding range
Install new customer supplied lighting fixtures, disposal, dishwasher
Relocate 100 a service. Install 9 quad receptacles , 4 luminaires, 18 receptacle outlets and 1 emergency exit sign.
1st floor-Remove partition walls and build one partition wall. Paint and carpet and move electrical outlets as needed. ALT 826353 filed 5/2/18.
Replace Gas Range in the Kitchen
Bathroom upgrade
Two new lav sinks New shower New toilet Washing machine - work in unit #9-J
Bathroom renovation, new fixtures, vanity, shower &; floor tile unit 9J
remodel of bathroom and replace switches and outlets in kitchen
Install fixtures, exits signs and receptacles.
replacing gas cookstove w/ new
replacing kitchen sink, dw, and 2 lav sinks with new
Replace 2 toilets
new wiring for kitchen 20 new fixture
Wire renovated kitchen to code
Remove and replace kitchen cabinets, create pass through from kitchen to dining room. New tile flooring. Paint unit upon completion. Unit 5B
Sheetrock ceiling, add moldings, change kitchen cabinets, new floorcoverings, install interior door between living room and office work in Unit#9D.
239 Residential Units &; Offices Certificate for combined units 14P &; 14R - ONLY ALT573837 issued: 11/4/15
kitchen replacement
Kitchen remodel. Wire new office. Unit 15M
REMODEL WORK AT UNIT #: 15M- REMODEL KITCHEN, INSTALL NEW HW FLOOR, CONSTRUCT A ROOM USED AS OFFICE, INCLUDE PLUMBING & ELECTRICAL WORK.
Replace bath fixtures and new kitchen faucet and dishwasher.
Replace existing windows and sliding glass doors in 4 units. Same scope as previously issued permit SF265039.
Kitchen renovation. Finishes only
upgrade panel to new style - complete rewire of apartment which will include kitchen, livingroom, bedroom & bathroom.
Change occupancy from; 240 Residential units &;;offices.;To 239 Residential units, offices. ;;renovate 1 kithchen and bath
Replace kitchen sink, dishwasher and vanity
Kitchen Renovation. remove 1 existing wall, Replace closet doors. painting. no structural work.
new kitchen and bath
gas stove
replace kitchen cabinets, bathroom vanity and carpet
Mount and Install an emergency Back-up generator
Replace existing windows and sliding glass doors in 4 units. Same scope as previously issued permit #SF265039
Form a pad for a generator.
Misc concrete repair, sealing joints and waterproofing.
Bathroom and kitchen remodel consisting of a new WC, Lavatory, shower pan and valve, kitchen sink, disposal and dishwasher
Plumb the kitchen sink
Kitchen remodeling, rewiring all all appliances,stove ,hood,garbage disposal, dishwasher, etc, minor repairs and panel replacement if needed.
Remove and replace tile floor counter tops and cabinets.
Labor to remove existing kitchen cabinets, install new cabinets/sink fawcet.
renovate existing kitchen and bathroom, lights and outlet.install lights in the bedroom.
Remove existing roof and insulation and replace with new insulation and PVC roof system
Renovate existing kitchen, bathroom, add hardwood floor, closet, cabinet, ceiling moulding, wall paper, create office/study area in unit#17C
install (2) new toilets, install (2) new sink traps, install (2) new tub&shower valves.
Bathroom Renovation Toilet, Lavatory, Shower Stall
Replacing existing windows and sliding doors in 7 units. Same scope as previously issued permit #SF344025.
Rewire replaced fire pump controller and jockey pump controller
bathroom remoldal, new tile, paint,and wall tile unit 17 H
replacing existing windows and sliding doors in 8 units. same scope as previously issued permit #SF265039
lower 18 existing sprinklers down through existing ceiling in the basement office.
Mount 3 existing fire devices on to new ceiling tiles
replace existing toilet and sink in Dr. office. Dishwasher, instant hot, and icemaker.Kitchen sink is already on permit PL259406
Gas piping to new boilers,
Replace dishwasher in kitchen.
Replace dishwasher.
Replace gas fixture.
Replacing existing windows and sliding glass doors in 20 units.
Wire in doctors office suite 211. Wire in small kitchen, bathroom, recess lighting and receptacles. Building Permit SF253300
Relocate sink two feet from existing location.
Renovations to the existing Professional office Suite 112N to include relocation of walls, new ceiling grids and tiles, new ceramic tile flooring, new counters, tops, desks and she…
Unit 6N: Replace dishwasher in kitchen.
replace circuit breaker panel and receptacles
dental office suit 102. remove and replace
replace dry system pipe,upper and lower garage
remove old bath tub and install new one
install new dedicated 20 amp circuit for tub
Interior work in office space;will consist of swapping out cabinets, two new doors, new partition wall in kitchenette, replacing ceiling tiles, new carpet and paint.
Electrical demolition, replace electrical panel. Install new electrical receptacles and light.
new kitchen cab + appliances wired + change devices. Unit 12J
new kitchen sink ,dishwasher and garbage desposal replacements
replce gas stove
Renovate kitchen: Install new cbinets, counters and appliances. Install new trim in kitchen and livingroom. Paint kitchen and living 12j
replace stove
fixetr replacment
Kitchen: appliances connection,GFCI, Receptacles new. Track lights fixing, Sub panel change, Bathroom: GFCI, Recessed lights (2,Receptacles new
Remove existing kitchen,bathroom, existing interior doors and baseboard Replace with new kitchen cabinets, new bathroom tile and vanitys, new interior doors baseboard and paint wor…
Replace kitchen sink, DW & disposal
Replace range
repair existing 125 volt 20 amp duplex receptacles and 2' x 4' drop in light fixture. Install GFCI receptacle.
INSTALL 130 FEET OF 4 AND 6 FOOT HIGH BLACK ALUMINUM FENCE ALONG STREET
fixture replacement in two bathrooms
Replacement dishwasher
Relocate 50a sub panel, Rewire entire unit. New recess lights 16 total, new dedicated circuits for bath, makeup counter, bedrroom and hallway
Remodeling kitchen cabinets and appliances. Remodeling bathrooms Removing some interior partitons (non-structural)to enlarge kitchen and bath. Adding closet space
Kitchen and Bath remodels. Replacing fixture and appliances. Install new shower valve and copper pan. Install kitchen sink, disposal and faucet. Install vanity sinks and faucets In…
Re-routing gas pipe for stove's new location to the opposite wall of the kitchen.
installation of plumbing for new tub and valve,replace toilet, replace vanity sink and faucet.
remodel bathroom in unit #15C
Remove and replace glass sliders and 2 double hung windows
Replace range in unit #8L.
re conect gas stove
change shower valve vanity kitchen sink
Install cabinetry, granite counters and tile floor; change out electrical devices; tile bathroom tub surround; change out shower valves; install kitchen appliances. Work in unit #9…
Electrical Low Voltage · LVOLT · Jul 30, 2026