Building permit intelligence · Boston, MA
55 Fruit St has 220 municipal building permits on file in Ward 3. The latest recorded activity was a electrical low voltage permit dated Jul 30, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 16 mapped permits within 500 m of this address.
MGH Ellison Supplemental Cooling. MISC Low Voltage HVAC Control Wiring FK 264384
Electrical
Plumbing
Plumbing
Plumbing
Electrical
16 mapped permits within 500 m, shown on the intelligence map above.
2 other addresses on Fruit St with municipal permit records in Boston.
This address has 220 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 55 Fruit St is dated Jul 30, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 55 Fruit St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Electrical
Plumbing
Plumbing
Low Voltage
Plumbing
Low Voltage
Plumbing
Plumbing
Low Voltage
Low Voltage
Plumbing
Low Voltage
Low Voltage
Low Voltage
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Fire Alarm
Electrical
Electrical
Fire Alarm
Fast Track Application
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Plumbing
Plumbing
Electrical
Add 1 duct soke detector and 1 monitoring module
Disconnect 208V, 3P, 20-amp power feeding 1 exhaust and 1 supply fan. Reconnect power to new exhaust and supply fans. Fans installed by mechanical contractor.
Selective demo of existing plumbing systems (sanitary, waste, vent & domestic hot & cold water ) & install water closet, lavatory and sink for hospital renovation on level 2 of the…
Update MEPs and finishes of existing nurse station and break room. Project includes new lighting, new sprinkler heads & piping, new flooring, paint, and drywall.
Alteration of the existing addressable Fire Alarm System to serve new Bridge Connection from 4B Building.
MGH Warren Dry Lab MISC Low Voltage HVAC Control Wiring 253400 FK
HospitalCertificate for ED CDU Space on Ground Floor of;the White Building.ALT1555624 Issued February 06, 2024;
Plumbing demo of old fixtures and piping. Install new fixtures and piping.
Level 3 renovation on the dry lab. New power and lighting. (2) new panelboards to support new power needs.
provide 2/ 30 amp 120v circuits for Boston Fire Radio equipment.
MGH White AHU Crossover Misc. Low Voltage HVAC Control Wiring. JG -253281
Updating mechanical AC equipment in Lunder Doghouse. E25018 (No bldg permit tied to project)
45 Fruit Street. MGH Lunder Doghouse Cooling Misc. Low Voltage HVAC Control Wiring FK - 253190
MGH Warren 13 Maintenance project (No Bldg Permit tied to project as it is only electrical scope) Demo of existing electrical equipment. Installation of 75kva xfmr, 400a 480v panel…
Renovation of an existing space. Power for new Kitchen equipment. E24066 MGH Kettles
HospitalCertificate for Exam Room on 2nd floor @ the White Building.ALT 1644053 Issued 10/9/24, SF 1631835 Issued 8/20/24
replace (3) damaged metal wall panels at loading dock.
MGH Low Voltage Data Cabling MGH White 2 CT 24-0176-10
Install a flagmount sign to side of building with arrows for Emergency and Main Entrance
Installation of sanitary waste pipe to replace existing piping. (444900-1)
Basement floor of the White Building. Renovation of small office space for security panic buttons and doors.
Basement floor of the White Building. Renovation of small office space for new, power
Installation of Pre Action System
Installation of Pre Action System
Addition of low voltage sleeves and low voltage wiring on Lunder Building 1st floor.
Renovation of existing Area. 1 Strobe only. E24061 MGH White 2
Installation of Fire Alarm Device
Removal and replacement of existing kitchen equipment. Includes new equipment install, repair and replacement of existing floor drains, tile, and ACT ceiling in the Ellison Basemen…
Installing storage closets. Scope of work includes GWB partitions, shelving, power, and paint.
Renovation of an existing area. E24061 MGH White 2
MGH White 2 Ultrasound. Misc. Low Voltage HVAC Control Wiring. FK - 242790
Renovation of hospital exam room.
Provide generator to power TV truck. Generator will be located at Mass General Hospital next to the Parkman St parking garage. Site plan attached. Generator will be set up on 9/8/2…
Renovation of an existing exam room in the White Building of Massachusetts General Hospital including associated architectural, fire protection, plumbing, HVAC and electrical work.
Installation of water and sanitary waste piping feeding floor drains in kitchen (445100-1)
MGH Blake 2 - Lunder CT Replacement Misc Low Voltage HVAC Control Wiring JG 242412
MGH White 2 Spec CT. Misc. Low Voltage HVAC Control Wiring. FK - 242495
45 Fruit St. MGH Lunder Linac 6 . Misc. Low Voltage HVAC Control Wiring FK - 242594
Installation of new disconnects for replacement dishwasher & conveyor belt. E24022
MGH is adding fixtures to an existing space while under renovation. (442600-1)
White Building 2nd floor - renovation
White Building 2nd floor Renovation - nurse call & security wiring
White Building 2nd floor Renovation of existing CT.Lighting, power,
Renovation or a portion of the 2nd Floor of the MGH White Building. Spaces include SPECT CT Room, Control Room, Shared Office, and Infusion Room. Work includes architectural, mecha…
Installation of new medical gas piping, outlets and controls. Replacement of Lav. Add indirect drain.
Dishwasher Replacement. New Drains and piping. (885652-1)
45 Fruit St. MGH Lunder ED Aii Reno - Phase I Misc. Low Voltage HVAC Control Wiring FK - 242322
Selective demo of existing plumbing systems (misc. lab gases, hot & cold domestic water). installation of new lab sink and fixtures, electric water heater, and medical gas outlet.…
Renovation of an existing area. E22097 MGH ED CDU phase 2B, 2C, 3
renovation of a portion of the Ellison Basement dirty dish room and dish room. The scope includes minor acoustical ceilings and flooring along with MEP trades
MGH Blake & Ellison - Infrastructure Power Supplies. Mic. Low Voltage HVAC Control Wiring. JG - 232140
Renovation of existing Fast Track on the ground floor of the White Building to accommodate for new ED CDU. Trades will include: Misc. Metals, Rough Carpentry, Drywall, Finish Carpe…
HospitalCertificate for ED CDU on Ground Floor of White BuildingALT1398094 Issued 11/25/2022
23-0061-10 MGH ED CDU 23-0061-10
Replacement of domestic, hot/cold water, sanitary/waste, and med-gas piping for renovation of MGH Acute Aii ED Room (45 Fruit Street).
Emergency replacement of existing fire alarm components in White Building to accommodate obsolescent equipment
Miscellaneous concrete repair to the spalled concrete and sealant joint replacement in the Fruit and Parkman garages.
MGH Lunder CSPD Cooling Phase II 45 Fruit St Misc. Low Voltage HVAC Control Wiring FK - 231811
Mass General Hospital - Emergency replacement of Fire Alarm equipment components in the White Building. Replacement parts are no longer available.
Renovation of radiation therapy room
Relocation of existing devices. Phase 1-Rooms 147F & 147G Phase 2-Rooms 100T60, 100T61, 100A34, 100C42
Renovation of existing Operating Room #84 install new lighting, outlets and electrical raceways for equipment @ 45 Fruit Street, Boston, MA 02114
Renovation of existing Operating Room #83 install new lighting, outlets and electrical raceways for equipment @ 45 Fruit Street, Boston, MA 02114
installation of patient lifts in White Building 3rd Floor. Disassemble and reassemble ACT/ceiling tiles for patient lift installation; GWB patching where needed
MGH Blake 2 Echno Admin Suite Relocation. Misc. low Voltage HVAC Control Wiring. JG - 220583
Partial replacement of back-pitched sanitary piping riser, White Building, Sub-basement through 2nd floors
Low Voltage Cabling
Renovation of an existing area. E22097. Phase 1-rooms 160, 147F, 147G. Phase 2-163, 100C64, 145, 160W, 160P, 133, 144B, 144A, 100T60, 162. Phase 3-147A, 160Q, 134, 100A34, 144
HospitalCertificate For ECHO Cardiology Admin Suite - 2nd FloorALT1270248 Issued 1/28/2022
Job# 22-0178-10 MGH L/V cabling White 2 Echo
Renovation of existing Fast Track on the ground floor of the White Building to accommodate for new ED CDU. Trades will include Demolition, Misc. Metals, Rough Carpentry, Finish Car…
MGH White ED Critical Decisoin Unit. Misc. Low Voltage HVAC Control Wiring. FK - 221135
Renovation of a part of the Emergency Department
885502 - Installing water piping to point of irrigation connection.
MGH Blake 2, PET CT Room 2. Low Voltage HVAC Control Wiring. JG - 220602
Elec app. Per BPDA approval 8-4-22 install replacement and new signs E01-E08 for Mass General Hospital/Mass General Brigham.
MGH Blake 9 Room 2. Misc. Low Voltage HVAC Control Wiring. JG - 220923
Demo existing VAVs. Upgrade control for new VAV boxes @ 2 phases /MGH Blake 4th floor - Phase 01B
Removal & replacement of architectural finishes. Replace existing fuel oil lines to upgrade fuel oil system. The majority of alterations to the existing MEP . A SF permit has been…
Removal & replacement of roof at Jackson Building loading dock, 1st floor and 15th floor, Gray Building 5th floor, 6th floor, 9th floor and 10th floor, Bigelow Building 15th Floor.…
150169FAC - White Building 1st fl. Furnish and install branch wiring for small office reno
HospitalCertificate for: Pharmacy Suite 205 and Waiting Room Suite 203 - White Bldg. - 2nd fl.ALT1062685 issued 11/9/20;
SM # 150194FAC - MGH PACU - Lunder 2nd, 3rd, 4th floor install receptacles in existing PACU units @ 45 Fruit St
150183JCC - MGH Fuel Oil renovation- White Basement. Furnish and install power to (1) leak detector
150183JCC - MGH Fuel Oil renovation- White sub-Basement. Furnish and install power to (1) leak detector
SM # 150194FAC - MGH PACU - White 3rd floor install receptacles in existing PACU units
Install wiring within office cubicles on 4th floor for Mass General.
MGH Blake 2 PET MRI Suite. Misc. Low Voltage HVAC Control Wiring. JG - 220443
Job# 21-0217-10 MGH-EP Lab Reno, multi phased
Job# 21-0259-10 MGH Low voltage cabling for T/D
HospitalCertificate for;MGH - White Building New Emergency Room;Ground Fl-OnlyAlt 1244786 issued 10/13/21
HospitalCertificate for;MGH - White Bldg. - Pathology Labs - 5th.fl.;;Alt 1185154 issued 5/18/21, Alt 1224390 issued 8/17/21
Demo existing VAVs. Upgrade control for new VAV boxes @ MGH Blake 4th floor
MGH White 2 ECHO. 55 Fruit Street. Misc. Low Voltage HVAC Control Wiring - FGK - 220341
HospitalCertificate for;MGH - White Bldg - Pathology Lab 550- 5th.fl.-;Phase I;; ;;Alt 1185154 issued 5/18/21, Alt 1224390 issued 8/17/21*Temporary certificate-expires 2/28/22-pend…
Renovate existing portion of 2nd floor of the White building at MGH for new ECHO cardiology admin suite-New Mechanical, Electrical, plumbing, sprinkler, and fire protection. Additi…
Demo existing fuel oil day tank control panel and associated valves and alarms. Install new fuel oil day tank and associated valves and alarms in 12 locations @ 55 Fruit St
Renovation of an existing area (E21121 MGH Echo)
Renovation of an existing area(E21121 MGH Echo)
885402 - Installing new floor drain for mechanical equipment.
Renovation of existing area(MGH White 2 Pharm-Phase 2)
adding a kitchen sink to renovations to Echo admin suite
MGH White/Ellison Med Air. Misc. Low Voltage HVAC Control Wiring - FGK - 220105
MGH - White Building: Renovate portion of the ground floor to accommodate a new ED suite for behavioral house patients. [ePlan]
Emergency Repair of an existing 4" Sanitary Stack in the basement.
Opening the existing wall to replace damaged waste line. Patch back wall.
MGH ED Fast Track Reno. Misc. Low Voltage HVAC Control Wiring - FGK - 219960
Installing plumbing futures & associated piping
Renovation of existing area(E21091 MGH ED Fast Track)
Renovation of an existing area(E21091 MGH ED Fast Track)
HospitalCertificate for MGH White 14th Floor, South Wing- Biomed Department; &; Staff Room-OnlyAlt 1163950 issued 3/18/21
885352 - Renovation of existing patient space with new plumbing fixture
MGH - White Bldg - 5th Floor - Lopez Cell Therapy Lab -; Partial renovation of Lopez Cell Therapy Lab. Phase 2.; Work to include new framing/finishes/MEPS and fire alarm/sprinkler;…
Mass General Hospital - White Bldg - 10th Floor - Interior renovations of an existing workroom and staff lounge for MGH’s PT/OT staff. Work includes selective demolition, new Archi…
Install new Emergency Feeds for Lunder Chillers
SM#150170FAC.White Building 10th Floor. Furnish and install lighting, power (1)60A 3ph/4W 120/208V Panel boards. @ 55 Fruit Street
SM#150169FAC White building 1st floor alterations to existing fire alarm system.
SM#150170FAC.White Building 10th Floor. Furnish and install security 1 security doors @ 55 Fruit Street
SM#150170FAC.White Building 10th Floor. Furnish and install fire alarm @ 55 Fruit Street
MGH Parking Garage, add a new Chain Link Fence, Bollards and Bike Racks to Store Bicycles in the Garage. Trades Include, Carpentry, Security, Concrete. Contract is for 2 separate B…
SM#150162FAC.White Building 5th Floor.phase 1 - Lopez Lab Reno. Furnish and install lighting, power
SM#150162FAC.White Building 5th Floor.phase 1 - Lopez Lab Reno Furnish and install fire alarm
SM#150162FAC.White Building 5th Floor.phase 1 - Lopez Lab Ren Furnish and install security/ 1 security doors
Installing (1) new emergency eyewash with using existing domestic water, waste and vent piping
Fruit Street Garage: Conduit & Backbox provisions only for (4) security cameras & (1) card reader. Devices and wiring by others.
The scope of the project is to gain access to the existing 1-Hour barrier along the Emergency Department of Mass General Hospital and upgrade the existing barrier to a 2-hour. Work…
HospitalCertificate for;MGH - White Bldg - 2nd Floor- Nuclear Pharmacy-OnlyAlt 1062657 issued 11/9/20
MGH - White Bldg - 5th Floor -; Renovations to a portion of the Lopez Cell Therapy Lab section.; Work includes new Architectural finishes and supporting MEP, Fire Alarm and Sprinkl…
Job# 21-0057-10 MGH White 14 Biomed Workspace Low voltage T/D cabling
21-0090-10 MGH Blake 9 Cath Lab Rm#1 Low voltage T/D cabling
PHASE 2SM#150162FAC.White Building 5th Floor. Lopez Lab Reno Furnish and install lighting, power
PHASE 2SM#150162FAC.White Building 5th Floor. Lopez Lab Reno Furnish and install fire alarm
;PHASE 2SM#150162FAC.White Building 5th Floor. Lopez Lab Reno Furnish and install security 2 security doors
Boston Lyric Opera will install a temporary trailer on site to serve as their 'Street Stage' for artists to perform for socially distanced audiences. No actual construction tasks a…
electrical testing and maintenance of the utility line 212
411300 - Renovation of existing lab with new fixtures and associated piping at MGH White 5 Lopez.
Electrical testing and maintenance of switchgear off line 211 from Eversource.
Renovation to MGH White 14th Floor, south wing, in preparation for Biomed Department to move in. Includes minimal wall layout modifications and new finishes along with new MEPs to…
410500 - MGH White 124 Biomed. Install new hand sinks and eyewashes with associated water and sanitary waste and vent piping.
MGH Whitehead 14 Biomed, 55 Fruit St. Misc. Low Voltage HVAC Conntrol Wiring - FK - 219380
We will be doing a lighting retrofit throughout the Lunder Building.
New power and lighting for the renovation of the biomed workspace on the 14th floor of the White Building.
New fire alarm devices for the renovation of the biomed workspace on the 14th floor of the White Building.
Emergency Response to make repairs to the main switches after a incoming utility line fault.
Renovation of an existing area. MGH White 2 Nuclear Pharmacy-E20043 Phase 1-Rooms 226 & 228 Phase 2 Rooms 203B, 203A, 203C, 203 & 205
Renovation of an existing area. E20043 MGH White 2 Nuclear Pharmacy
Installation of (1) new single station scrub sink.
Installation of (1) new hand wash sink and (1) new med gas outlet.
Scope includes add fume snorkel to soiled utility room and relocate power outlet.
Demolition and abatement of old lab/office space to leave in shell condition. ALT to be filed at a later date E-FILE
MGH - White Bldg - 2nd Floor - Phase 2 -; Renovation of existing Hospital Pharmacy rooms and under slab structural support. Work consists of: demolition of existing partitons, relo…
MGH - White Bldg - 2nd Floor -; Renovate existing space for new Check in &; Consult / Injection room in the Nuclear Pharmacy.; ;Work includes Replace existing MEPs, and new interio…
20-0286-10 Low Voltage cabling for T/D & A/V-MGH GRJ-1 ED APS Expansion
MGH ER Acute Psychiatry, 55 Fruit Street, Boston, MA. Misc. Low Voltage HVAC Control Wiring - FGK - 208997
403000 - MGH - Emergency Department APS Reno Installation of Med Gas piping to existing risers and patient bathrooms on Level 01. Relocation of sanitary piping on the floor below (…
MGH Lunder Conf Rm OCC & CO2 Sensors, low voltage HVAC control wiring 208604 FGK
Renovation of an existing space in the White-2 Nuclear Pharmacy, MGH.
Install 5 A/V units in an existing FA system for renovations of White-2 Nuclear Pharmacy, MGH.
Installation of new plumbing fixtures along with 1 new med gas outlet.
Installation of new plumbing fixtures along with 1 new med gas outlet.
Install low voltage cable and system components associated with an AV system upgrade at 55 Fruit St for Mass General Wang
Relocate Lavatory for ADA Requirements
Job# 19-0606-10 MGH-Lunder LLI Reno workroom-Low Voltage T/D cabling-LLI
Control wiring of HVAC equipment @ MGH Blake Building
We will be doing a lighting retrofit throughout the 7th floor of the Bigelow building.
Remove existing roof and install new roof.
MGH Warren Exhaust Phase 1, low voltage HVAC control wiring - FK, 197587
Installation of new lab waste neutralization system in the basement of the MGH White Building. Relocate existing compressor and associated devices.
MGH White Lab Waste Project
Electrical Low Voltage · LVOLT · Jul 30, 2026