Building permit intelligence · Boston, MA
35 Fruit St has 111 municipal building permits on file in Ward 3. The latest recorded activity was a plumbing permit dated Apr 10, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 18 mapped permits within 500 m of this address.
Plumbing
Plumbing
Plumbing
Plumbing
Electrical
Electrical
18 mapped permits within 500 m, shown on the intelligence map above.
2 other addresses on Fruit St with municipal permit records in Boston.
This address has 111 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 35 Fruit St is dated Apr 10, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 35 Fruit St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Fire Alarm
This project involves re-programming of the buildings fire alarm system to private mode using custom alert messages. Work is fire alarm programming only - no wiring is involved. Pr…
Fire Alarm
Fast Track Application
Electrical
Fast Track Application
Interior/Exterior Work
Interior/Exterior Work
Fast Track Application
Renovations - Interior NSC
Electrical
Low Voltage
Low Voltage
Electrical
Electrical
Low Voltage
Low Voltage
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Electrical
Low Voltage
Electrical
Low Voltage
Fast Track Application
Interior/Exterior Work
Low Voltage
Fast Track Application
Electrical
Fire Alarm
Electrical
Fire Alarm
Low Voltage
Low Voltage
Plumbing
Fast Track Application
Fast Track Application
Plumbing
Renovation of an existing area(E21095 MGH Linac)
;(Job Site: 45 Fruit St 3rd Lower Level);Reno to Lunder LL3 Oncology Greeting Desk (Room # LL363) located within the 400T01 LINAC Waiting Area. Greeting desk will be replaced and a…
Removal & replacement of architectural finishes. Replace existing fuel oil lines to upgrade fuel oil system. The majority of alterations to the existing MEP . A SF permit has been…
MGH Lunder 5 Stroke Recovery. 45 Fruit St. Misc. Low Voltage HVAC Control Wiring FGK-220723
New med gas, waste pipe, and installing new sink for new med room.
Lunder Bldg.,6th floor-Interior Renovation to an existing Stroke unit. Scope of work includes millwork, floor, ceiling, Doors, Fire Protection, Plumbing/Med gas, HVAC, Electrical.
Full cost is in ALT1334126. Scope of work is replace 1 Terminal Box and 2 light fixtures. Relocate lockers out of existing Residents office
SMC Job#280001GGC - MGH Lunder 6 ABSSRU Renovation. Furnish and install fire alarm @ 45 Fruit street
SMC Job#280001GGC - MGH Lunder 6 ABSSRU Renovation. Furnish and install nurse call in existing nurse call: (2) bed stations, (2) dome light,(2)tv controls on existing system.Securi…
SMC Job#280001GGC - MGH Lunder 6 ABSSRU Renovation. Furnish and install lighting, power, @ 45 Fruit street
Installation of patient lifts in Lunder Building floors 2, 3 and 4. Disassemble and reassemble ACT/ceiling tiles for patient lift installation; GWB patching where needed
45 Fruit Street MGH Lunder Linac 1 & 6. Misc Low Voltage HVAC Control Wiring - FGK - 219970
MGH - Lunder Bldg - LL3 -; ;Replacement of (2) LINAC equipment within separate Procedure Rooms for cancer therapy. The Procedure Rooms will receive MEPs to accommodate new equipmen…
Relocating existing plumbing piping to accommodate new equipment (415300)
Renovation of an existing area(E21095 MGH Linac 1&6 Phase 1)
Renovation of existing area (E19076-100 MGH Lunder)
Creating a 2-hour barrier along perimeter of the existing Emergency Department. Scope includes new GWB, Doors &; Frames, fire dampers, paint and ACT [ePlan]
SM#150169FAC Lunder building 1st floor alterations to existing fire alarm system. @ 45 Fruit street
Redesign and rearrange the workstations in the prep and pack area of the existing central sterilization and processing on LL1. the works included MEP and architectural work. the pr…
885346 - Installation of new fixtures for clinic.
MGH Lunder 4 OR 81 & 82. Misc. Low Voltage HVAC Control Wiring - FK - 219675
885343 - Installing new water line to accommodate new HVAC equipment.
New power and lighting for two Operating Room renovations on the 4th floor of the Lunder Building. Rooms 81 &; 82.Install conduit for Siemens medical equipment. Install (2) 175A pa…
MGH - Lunder Bldg - 4th Floor OR 81 &; 82 -; ;Existing Radiology OR equipment is being replaced with new. Site prep for new equipment includes structural support, revised HVAC and…
46 Fruit Street-MGH Lunder Burr Proton Coil Replacement- Misc. Low Voltage HVAC Control Wiring - FGK - 219473
150156TUR MGH LL3 Temp Pediatric Recovery Bays nurse call in recovery Bays
150156TUR MGH LL3 Temp Pediatric Recovery Bays Lighting, power and nurse call in recovery Bays
Renovation of LINAC Simulator Room LL317 and Control Room LL317A in the Lunder Building Lower Level 3 Floor. This LINAC Simulator Room will be converted into a Temporary Pediatric…
Construction of 10 (ten) exam rooms with no ceilings for the MGH Lunder COVID
Addition of (10) temp, patient exam rooms in existing floor space ( 45 Fruit St - Lunder Building)
MGH - Lunder Bldg - Underground Level LL1 -; Mechanical, Electrical Upgrades to provide infrastructure for added Code Cart Wash in MGH Lunder Building Central Sterile Processing &;…
Renovation of an existing area. (MGH Lunder LL1 CSPS Renovation)
Renovation of an existing area. (MGH Lunder LL1 CSPS Renovation)
New exhaust fan and duct work for the Lunder Building basement at Mass General Hospital
MGH Lunder SPD Exhaust Fan, Misc low voltage HVAC control wiring - FGK, 185704
Hospital C/O For:; Lunder Lower Level 3 proton - Patient Treatment Alt391864 issued - 8/26/14, sf 435899 issued 12/18/14
Building a closet to house the heat exchanger for a new LINAC machine. Trades include new walls, flooring patching, HVAC, electrical and the addition of 1 sprinkler head.
Install of a 4ft strip light and toggle switch
Re-configuration of existing MRI equipment in basement in basement of the Lunder Building
Mass General Hospital - LL3 - Lunder Building -; Removing the existing LINAC machine because it is outdated and replacing with a new LINAC machine. Trades include millwork, floorin…
874357 - MGH Lunder Proton - Adding plumbing fixtures
Painting, installing new carpet and light fixtures.We will also be installing new plumbing fixtures. We are also installing a new reception desk.
We will be installing new LEDS throughout the building
MGH - Lunder Linac, Misc. Low Voltage HVAC Control Wiring - FGK, 163834
Extension and installation of new Pneumatic Tube system for Blood Transfers from Lunder Building 2nd floor blood bank to yawkey building 10th floor existing infrastructure. (alt 60…
Lunder building basement Level Disconnect Existing Hot Water Boiler reconnect New Hot Water Boiler
1st floor: installation of( 3) duplex receptacles. (1) Light Switch and relocation of existing fixture (3)
Loading dock 2" race way installation for low voltage cable install by others
Split room 265 on second floor of lunder building into two office spaces from 1 initial office.
RENOVATE TWO EXISTING OFFICES IN LUNDER BUILDING to add waste monitoring station to existing sterile processing department system
MGH Bulk Oxygen 45 Fruit St Misc Low Voltage HVAC Control Wiring RAC-163061
Construction of new walls, door and ceiling for new Oxygen storage room and installation of new Oxygen lines in Lunder Building.
Renovation of oxygen room on Lunder 5M. Tie in two Gas Panels
Renovation of oxygen room on Lunder 5M. Tie in two Gas Panels
Build out Space with medical equipment. Level LL3 Lunder Building. Medical Equipment hook ups, 1-100AMP 120/208 Panel, 1-30KVA Transformer
Build out Space with medical equipment.
Construction of room for proton equipment installation including; sheilding, fire protection, electrical and drywall.
**Filtered Water Cooler**
Proposed Work: Change swing-type patient room doors to sliding-type on floors 6-10 , Last Action: READY TO ISSUE
Add lights, devices and switches. Also install 5 data devices.
Electrical Permit · ELECTRICAL · Jul 27, 2026