Building permit intelligence · Boston, MA
9 Hawthorne Pl has 138 municipal building permits on file in Ward 3. The latest recorded activity was a fa permit dated Oct 21, 2025. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 10 mapped permits within 500 m of this address.
Fire Alarm
Electrical
Interior/Exterior Work
Gas
Plumbing
Kitchen Remodel, new sub panel, Wiring of new dishwasher, countertop 1, countertop 2, new bathroom circuit. Recessed lighting in bathroom and kitchen.
10 mapped permits within 500 m, shown on the intelligence map above.
1 other address on Hawthorne Pl with municipal permit records in Boston.
This address has 138 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 9 Hawthorne Pl is dated Oct 21, 2025. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 9 Hawthorne Pl in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Gas
Plumbing
Renovations - Interior NSC
Electrical
Plumbing
Other
Gas
Plumbing
Electrical
Renovations - Interior NSC
Renovations - Exterior
Other
Electrical
Electrical
Electrical
Plumbing
Unit 12K - Renovate bathroom. demo existing, install new plumbing and electrical, install tiling, med cab, vanity, and paint
Electrical
Replacing 38 windows in condominium.
installing of new convector
Replace existing tub/shower valve with a new tub/shower valve
Wiring up a small bathroom
guest bathroom replacement of toilet, sink, and shower valve.
Bathroom Renovation
install stove
Installation of new Light Pole & handhole in sidewalk at 9 Hawthorne Place, Boston. (corner of Blossom) Replace exist light pole. Disconnect exist light pole, reconnect new light p…
Wire up kitchen/ update small electrical panel to a bigger one
kitchen remodeling
Kitchen update with new cabinets and flooring
kitchen sink install dishwasher install ice maker install
Kitchen Renovation
Unit ;6J-Renovate kitchen,change floors, cabinets, counter top, update electric and plumbing
change electric panel, update kitchen, change outlets and switches in bedroom and living room
Change Gas stove
Remodeling Kitchen Sink, toilet
Remodel of a master bathroom consisting of new toilet, vanity, shower pan and shower valve.
Rewire bathroom
Bathroom renovation
Replacement of a dishwasher
APARTMENT 6A Replace electric panel and update kitchen circuit breakers to AFCI/GFCI
Replace existing windows and sliding glass doors in (14) units. Unit numbers: 8G, 7P, 6R, 4K, 4E, 3M, 3L, 3J, 16K, 15N, 14R, 12N, 11R, AND 11C
Full Apartment Remodel
remove stove and install new stove
Bathroom and kitchen remodel
Bathroom and kitchen remodel in Unit #14H. Cost includes upgrades to electrical &; plumbing
Replace Dishwasher in the Kitchen
replaced toilet, vanity kitchen sink, disposal in Unit 3K
replaced stove 3 floor in Unit 3K.
kitchen renovation
main panel change
Complete demolition of kitchen, install new cabinets, backslpash, wall tile, floor tile. Bathroom: remove shower vinyl wall. remove existing vanity, install new tiles on the shower…
Replace Dishwasher in the Kitchen
Replace 5 @ 100 Amp single phase panels.
Installation of (2) 4" schedule 40 approx. 150ft from Hawthorne St; building to Staniford St. garage. Work to be done in the basketball Court
Remove existing PVC roof system down to concrete deck and install new. New roof system to include, self adhered vapor barrier, 4.5" minimum insulation set in adhesive, 1/2" gypsum…
replace 2 outlets with water damage
replace stove
replace bathtub, lavatory and toilet
New wiring of kitchen and bathroom renovation.
Renovate existing bathroom. Revise existing kitchen cabinet layout. New wood flooring and painting throughout unit.; Work in unit #3J.
rough and finiish plumbing for kit and bath. unit 17
Install Lighting, exit signs and receptacles.
demolish and replace entire bathroom and kitchen; unit 17A
Install new kitchen finish including dishwasher and disposal
Install new stove on finish
Re test gas riser for N riser
Move gas stove
work being done in UNIT 5 I am doing a make safe on the kitchen and bathroom sink, installing new lav on finish and kitchen sink with faucet garbage disposal.
minor demo of non bearing partitions, new kitchen cabinets, new floor, paint entire unit.
Partially remove tile in damaged area only (about 3x6 area), fix wall. Clean whole bathroom's tile. Reinstall tile and regrout.
wiring for water valve, add 7 exit signs.
Build out existing office space to accommodate a bathroom and two examination rooms in existing space
kitchen renovations Unit number 15-N
Replace existing windows and sliding glass doors in 7 units. Same scope as previously issued permit SF265040.
Apt 9M: Replace dishwasher.
Replace existing tub with new acrylic shower base. Replace existing tub/shower valve. Replace existing vanity with new cust supp vanity.
Replace existing windows and sliding glass doors in 10 units. Same scope as previously issued permit #SF265040
replace three valves on domestic water main
Replace dishwasher
replace dishwasher in kitchen
Installation of300kw/375kva pad mounted generator and transfer switch,distribution panel, wiring and conduits to existing fire pump controls, and associated electrical distribution…
Replace existing windows and sliding glass doors in 10 units. Same scope as previously issued permit #SF344029.
replace recessed 14 lights and 3 2x4 lights
Rewire replaced fire pump controller and jockey pump controller
Install new dining room light and switch. Replace light in kitchen
Replace dishwasher.
replace recept sw rangehood and panel
Replace dishwasher in kitchen.
replace existing windows and sliding glass doors in 8 units. same scope as previously issued permit #SF265040
new kit cabs up grade elec no plumbing
Replace tub w.c. sink
rewire bathroom as needed
Renovate bathroom
stove replacement
bathroom and kitchen remodel
Electrical Renovation in; entire Unit #3f incl kitchen,bath common areas
Install cook stove.
demo and make 6 existing boilers and wire 6 new boilers
Replace exisitng windows and sliding glass doors in 29 units.
Kitchen and bath remodeling. Plumbing and electrical upgrade (unit 3F)
Proposed Work: Enclose balcony-unit 5, Last Action: READY TO ISSUE
Unit 3E 9 Hawthorne Place
Condominium complex. Wiring for two remodeled bathrooms and three line voltage smoke alarms.
Unit 3-E, Bathroom renovations and finishes
interior non baering metal stud partitions, electrical, cabinetry,drywall, paint tile, Unit 104
Replace cook stove.
Kitchen renovation and additinal outlets living room
remove existing cabinets and replace with new new wood work and moulding
remodel kitchen and bathrooms
UNIT:7E Replace existing panel with new. Re-wire Kitchen and Bathroom.
Unit 7E-Renovation of two bathrooms, installation of kitchen cabinets, install new prefinished flooring, paint
new bathroom
ADDING OUTLETS AND LIGHTS. Unit #11c
new kitchen
new stove
Rewire kitchen; 2counter,dishwasher,disposal,micro,fridge and dining light.
bumping out/ framing kitchen wall to accommodate new cabinet layout. Install cabinets
remodel and update kitchen and bathroom
change occupancy from 240 apartments &; offices to 237 apartments &; offices - combine units 17K,17L,17M,17N AS PER EXISTING ASBUILT
Rewire outlets and lights. wire kitchen and bathrooms. Replace existing electrical panels using existing main feeders -;install smokes/CO's throughout unit;- install cable;unit #3A
Rewire outlets and lights. wire kitchen and bathrooms. Replace existing electrical panels using existing main feeders -;install smokes/CO's throughout unit;- unit #3A
Rewire outlets and lights. wire kitchen and bathrooms. Replace existing electrical panels using existing main feeders - unit #3A
kitchen, two bath remodel
relocste gas for new stove
Renovate 2 bathrooms, 1 Kitchen, Various interior updates
replace stove in unit #2R
Renovation of existing apartment
Create entertainmant unit update decking, install new slider to deck misc. repairs throughout unit. repair to floors and various lighting fixture to be changed.Interior partition w…
change gas stove
change plumbing fixtures
To remove and replace cabinets and counter tops, tile in 1 bath, paint, and finish floors - unit #4N
Long Form/Alteration Permit · INTEXT · Jul 29, 2026