Building permit intelligence · Boston, MA
20 Shattuck St has 99 municipal building permits on file in Ward 4. The latest recorded activity was a fsttrk permit dated Jun 4, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 16 mapped permits within 500 m of this address.
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Renovations - Interior NSC
16 mapped permits within 500 m, shown on the intelligence map above.
3 other addresses on Shattuck St with municipal permit records in Boston.
This address has 99 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 20 Shattuck St is dated Jun 4, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 20 Shattuck St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Electrical
Electrical
Plumbing
Plumbing
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Fast Track Application
Fast Track Application
Plumbing
Plumbing
Fire Alarm
Electrical
complete the installation of new exhaust fan and associated ductwork to serve existing bathrooms. (1) Sprinkler branch line to be relocated to accommodate exhaust fan and ductwork…
BWH - Thorn 2 Restrooms - Public Restrooms along the main hallway of main campus - Renovated to be modern. Full gut, all MEPs to be new and updated, including modern lights and sin…
Thorn 1512 Renovation consists of upgrades to the sink, countertop, lighting and paint within this space.
E23032 BWH 16th fl Vivarium electrical renovations.
Replace existing cage wash with new
The project consists of a minor architectural renovation of Rooms TH 1623 and 1629 which will necessitate MEP/FP system modifications to support the new equipment. In addition, two…
Offices and Research Labs Certificate for:;Offices 11th.fl.; &; Labs -only Alt405651 -10/2/14 ;
Offices and Research Labs. Certificate for: Offices 14th Floor South Side - only. ALT984484 Issued August 21, 2019
SMC Job#110138PHC.Thorn Bldg Rm TH-509 @ 20 Shattuck ST
Disconnect and reconnect the permanent generator.
Interior non-structural renovation of existing finishes, flooring, and millwork.
Offices and Research Labs Certificate for:;Offices;7th floor- BWH Thorn Research Bldg. ALT936999 - 4/12/19
Renovation of lab space into office space
Brigham &; Women's Hospital - Thorn;Building - 14th Floor -; Interior Office renovations (4,000 square feet) of the south side of the 14th floor.; Work includes;:; demo existing pa…
Offices and Research labs Certificate For: Offices - 11th fl. (Thorn Building) Alt931044 - 3/25/19
Demolition of exiting Lab space to become office space
Provide power and lighting for renovation on the seventh floor, Thorn Bldg. BWH.
Install 2 A/V units to an existing FA system.
Renovation of existing lab space into employee lounge
Brigham &; Women's Hospital - Thorn Research Bldg - 7th Floor -; 2,000 square foot non-structural interior renovation converting wet labs to dry office space.; Work includes :; dem…
Non-structural lab and office space interior renovation of approximately 2,000 square feet.
Power and lighting for the renovation of the 11th floor, Thorn Bldg, BWH.
Add FA devices to an existing FA system on the 11th floor, Thorn Bldg, BWH.
Offices and Research Labs Certificate for Office and laboratory;13th floor - Only ALT808785 issued: 3/22/18
Renovation 2-100 amp panels 1st floor 8- 2HP Fans 8- 6KW unit heaters
Replacing Devices and panels throughout the Thorn Building @ 20 Shattuck St Boston
Interior Renovation - Upgrades to the Thorn Building fire alarm system and stairwell pressurization
Offices and Research Labs Certificate for Common Areas on Level 2 - only ALT634844 issued: 11/22/16
Installing plumbing fixtures & associated piping in BWH Thorn 13
Interior non-structural renovation of office and laboratory space, approximately 10,000 SF.
Renovation of office space
Renovation of office space (3) detection devices (3) Notification devices
Lighting and power renovations to 1st + 2nd floor Pike corridor (segment 3)
Modify existing system. adding 1 Control module, upgrading 3 AV wall devices
Renovation of corridor and office space. New flooring, ceiling, and wall finishes. Sprinkler and fire alarm modifcations to be made as required for architectural layout.
Offices and Research Labs Doc# 3415/1982; Certificate of Occupancy for the offices &; research labs on the 8th &; 9th floors of the Thorn Bldg. @ Brigham &; Woman's ALT450048, issu…
B&W Hospital Thorn Bldg MUA Mockup, Misc. Low Voltage HVAC Control Wiring - SGG, 163590
Renovate office suite on 14th floor, BWH.
Renovate existing FA system for an office suite on the 14th floor, BWH.
Removal and replacement of (1) pair of exterior storefront doors and (1) pair of interior storefront doors. Minor electrical wire for new automatic operators. Installation of new e…
Renovate 7 & 9 floors for the Thorn Building.
Renovate the FA system on the 8 & 9 floors of the Thorn Building.
Interior renovation of the 8th &; 9th floor of the Thorn Building on the BWH campus. Renovation includes new drywall, finishes, and minor MEP upgrades.
Ronovate Thorn 11 BWH
Remodel fire alarm BWH Thorn 11th floor.
Interior lab renovation. Scope includes new flooring, painting and ACT. Scope also includes HVAC, sprinkler, plumbing and electrical upgrades. No exterior work. No structural work.…
Installation of drinking water filtration system and inst-hot water heater in the staff lounge
Installing drinking water filtration system in the waiting room
Erect three (3) temporary tents in the Harvard Medical School Courtyard, an 80 x 300, a 20 x 80 and a 20 x 20 to be used for Class Day & Alumni Day at Harvard Medical School. Insta…
Electrical Permit · ELECTRICAL · Jul 23, 2026