Building permit intelligence · Boston, MA
25 Shattuck St has 125 municipal building permits on file in Ward 4. The latest recorded activity was a fa permit dated Jun 5, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 16 mapped permits within 500 m of this address.
Fire Alarm
Fire Alarm
Electrical
Electrical
Electrical
Electrical
16 mapped permits within 500 m, shown on the intelligence map above.
3 other addresses on Shattuck St with municipal permit records in Boston.
This address has 125 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 25 Shattuck St is dated Jun 5, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 25 Shattuck St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Other
Other
Other
Other
Electrical
Electrical
Fire Alarm
Low Voltage
Low Voltage
Electrical
Medical School and Labs;Certificate for;Server Room L1 Lower Level @;Gordon Hall.;ALT1414357 Issued 12/16/22
Low Voltage
Interior/Exterior Work
Other
Low Voltage
Low Voltage
Low Voltage
S25-076 Provide Labor and Materials to install the manufacturers electrical jumpers between the added workstations using the provided circuitry.
Low Voltage
Low Voltage
Low Voltage
Install lighting and power for tent
Low Voltage
Other
Electrical
Other
Plumbing
Fire Alarm
Electrical
Plumbing
Fire Alarm
Low Voltage
Electrical
Other
Special Events
Interior/Exterior Work
Fire Alarm
Fire Alarm
Electrical
Other
Low Voltage
Low Voltage
Other
Fire Alarm
Plumbing
Electrical
Electrical
Gordon Hall Server Room Relocation to L1- Work to include the installation of (2) new rooftop units, dry chemical suppression system and connection to FA
Install temporary 80x190 tent to be used for Harvard Medical School event. Installed by 9/27. Removed by 10/7. Event date 9/28/22
Install temporary 80x300, (2) 9x7, 20x80, 20x20, 15x15, 10x25, (3) 10x20 tents to be used for Harvard Medical's White Coats ceremonies. Installed 7/28. Removed 8/8. Event dates 8/1…
Install temporary 80x300, (2) 9x7, 20x80, 20x20, 15x15, 15x20, 10x25 tents to be used for Harvard Medical School's commencement. Installed as early as 5/24/22. Removed by 5/29/22.…
HMS LHRRB Fuel Oil Pump Skid Power. Power wiring for Fuel Oil Pump Skid., 2 motors of 0.33 HP - AP - 220234
HMS LHRRB Controls Fuel Pump Skid. Misc. Low Voltage HVAC Control Wiring - AP - 220229
Install temporary 80x300, 20x20 and 15x20 tent to be used for Harvard Medical School's white coats ceremony. Installed 7/30/21. Removed 8/8/21.
Relocating of domestic water line in the basement
(1) coax antenna cable and (2) speaker zones
Install 80x300, (2) 9x7, 20x80, 20x20, 15x15, 15x20, and 10x25, temp tents and a 16'x32'x24" stage. Installed 8/2-8/6 removed by 8/11, event date 8/9
HMS Goldenson 4th Floor Goodrich Lab, Misc low voltage HVAC control wiring - AP, 197451
Install 10x25 tent. Installed 5/28 removed by 6/2
Annual electrical maintenance by in-house licensed electrical staff
Install 80x300, (2) 9x7, 20x80, 20x20, 15x15, 15x20 temporary tents, and 16'x32'x24" stage. Installed 5/14-5/28, removed by 6/2, event date 5/29-5/31
Gordon Hall Rooftop— Add (4) Audio Visuals for rooftop area notification
Install temporary tents 80x300, (2)9x7, 20x80, 20x20, 15x15, 15x20. Install 16' x 32' x 24" Stage with stairs and handicap ramps and (1) 8' x 8' x 6" riser. Install 8/1/18, Remove…
Repairing the Ramp leading into Gordon Hall
We will be building a new ADA Handicap Ramp to access a new door opening into existing building stairwell - improving building access, egress and ingress. This will not impact or c…
Install 80x300, (2) 9x10, 20x80, 20x20, 15x15 temporary tent and 16'x36'x24", 8'x8'x6" stage for commencement. Installed 5/7-5/20 removed by 6/1, event dates 5/23-5/25
Gordon Hall Mass Notification System/Fire Alarm Integration
Installing 8-lab sinks - 3-emergency showers - 1-kitchen sink - 1-floor drain - 8-emergency eye washes in basement
Erect 82x295, 20x80, 14x14, 20x20 and (2) 9x5 tents beginning on 7/28/17. Removal beginning on 8/8/17.
Temporary power for ramp provisions.
Installation of energy management system on walk-in coolers at Building C-200 Longmeadow Ave
Harvard Medical School - Accessible Ramp "A" renovation. Work to include the replacement of existing stairs with an HANDICAP- accessible ramp on the western most flight of the buil…
ERECT THREE TEMPORARY TENTS, 80X300, 20X80 AND A 20X20 FOR HARVARD MEDICAL SCHOOL 2017 COMMENCEMENT CEREMONIES ON THURSDAY, MAY 25, 2017. INSTALL TO BEGIN ON FRIDAY, MAY 19, 2017 A…
Support work and installation of a mass notification system in building
HMS Gordan Hall DEANS OFFICE, Misc. Low Voltage HVAC Control Wiring
Installing 1-water closet - 1-lavatory - 1-shower - 1-kitchen sink - 1-floor drain
HMS Gordon Hall - JCC Job # 884412 - Roof Drains
Deans office
Removal and replacement of existing roofing system.
Renovation of existing office suite to include new millwork, hard wood flooring, electrical, plumbing & painting. Work to be performed on the 1st floor.
Remove redundant /obsolete exterior egress fire stair for exterior of Gordon Hall harvard medical School
ERECT THREE TEMPORARY TENTS, 80 X 300, 20 X 80 & 20 X 20, FOR HARVARD MEDICAL SCHOOL WHITE COAT CEREMONY ON FRIDAY, AUGUST 5, 2016. INSTALL STARTING ON JULY 29, 2016 REMOVAL STARTI…
Temporary wiring for masonry work
HIM 10th Floor, Misc. Low Voltage HVAC Control Wiring - PAG, 163488
Erect three (3) temporary tents, 80 x 300, 20 x 80, and 20 x 20 for Harvard Medical School Class Day to be used on Thursday, May 26, 2016. Install on Friday, May 20, 2016 Remove on…
Floor 3, (15) Communication Jacks
Repair and repoint exterior façade and masonry at Gordon Hall
Replace existing windows and perform some exterior cleaning and repairs to LHRRB Building.
Upgrades to existing network room to include new electric, HVAC and finish carpentry.
Add (4) audio visuals for roof area notification
Exterior enabling work for future work at Gordon Hall. Work to include; stone removal and temporary protection.
gordon hall IT closet upgrade
audio visual install projector and screen
renovation for new conferance room 2nd floor
Modifications to (2) rooms to accommodate new microscopes. Cut in new 4' door. Remove closet. Replace flooring with VCT. Install new light fixtures. Rework power receptacles to mee…
Renovation of existing office space to include new millwork, electrical, ceiling tiles, HVAC, electrical, carpet and finish carpentry.
Erect four (4) temporary tents 80x300x15, 20x80x15, 20x20x12 & 14x14x12 for Harvard Medical School Class Day to be used on Thursday, May 28, 2015. Install on Friday, May 22, 2015 a…
Alumni Conference Room-renovation of existing conference room to include new electrical, HVAC, ACT ceilings, carpet, millwork. No fire alarm , no sprinkler
seminar room
office
Remodel of existing conference room to include rough and finish carpentry, electrical, HVAC, millwork and ACT ceilings. Work to be performed on the 1st floor.
Replacement of 15KV vault style switches at Harvard Medical School at builings LHRRB, E Building, C Building and Goldenson. The work being performed is replacement of 15KV oil swit…
INSTALLING 1 WATER HEATER- 6 FLOOR DRAINS-2 EMERGENCY EYE WASH- 1 BACK FLOW PREVENTER-4 GLASS WASHING MACHINES-2 SINKS
INSTALLING NEW SINK AND WATER HEATER
Erect four (4) temporary tents, 80x300, 20x80, 20x20 & 14x14, in the Harvard Medical School Courtyard to be used for Harvard Medical School Class Day on Thursday, May 29, 2014. Ins…
Proposed Work: Relocate two walls and open doorway, Last Action: READY TO ISSUE
Cut and repoint existing chimney on roof to match existing. Replace existing flagpole with new fiberglass flagpole - Gordon Hall - Harvard Medical School.
Erect two (2) temporary tents, 80x300 & 20x20, in the Harvard Medical School Courtyard to be used for Brigham & Women's Employee Appreciation Day, Thursday, July 18, 2013. Install…
Erect two (2) temporary tents in the Harvard Medical School Courtyard, an 80x300 and a 20x80, to be used for Beth Israel Hospital's Cancer Survivor Day on Sunday, June 2, 2013. Ins…
Erect a four (4) temporary tents, 80x300, 20x80, 20x20 & 14x14, in the Harvard Medical School Courtyard to be used for Harvard Med School Class Day on Thursday, May 30, 2013. Insta…
Temporary power for staging - 10 outlets, 20 lights, 2 switches
Demo of existing VAV boxes, Install of new VAV boxes, Demolition of ACT ceilings,Install of new ceilings, Paint as needed
Sash replacement and window repair at 100 existing window openings and painting. Interior work to include: minor demo and patching associatied with the new installation of windows.
Erect four (4) temporary tents in the Harvard Medical School Courtyard, an 80x300, a 20x80, a 20x20 & a 14x14, to be used for Beth Israel Hospital Cancer Survivor Day, Sunday, May…
Gordon Hall - Misc. Low Voltage HVAC Control Wiring SGG 129361
Window repairs at Gordon Hall. Work to include; glass, frame and trim.
add 9 strobe only units at the request of the building inspector
Harvard Medical School commencement temporary electrical plug into building electric for lighting and entertainment
Erect four (4) temporary tents in the Harvard Medical School Courtyard, an 80x300, a 20x80, a 20x20 and a 14x14 to be used for Beth Israel Hospital Cancer Survivor Day, Sunday May…
Electrical Permit · ELECTRICAL · Jul 23, 2026