Building permit intelligence · Boston, MA
960 Massachusetts Av has 110 municipal building permits on file in Ward 8. The latest recorded activity was a other permit dated Jun 16, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Other
Other
Other
Other
Other
Other
1 mapped permit within 500 m, shown on the intelligence map above.
12 other addresses on Massachusetts Av with municipal permit records in Boston.
This address has 110 permit records in PropertyLabs' public history and is located in Ward 8. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 960 Massachusetts Av is dated Jun 16, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 960 Massachusetts Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Electrical
Electrical
Electrical
Electrical
Fire Alarm
Interior offices, conference area, kitchen, bathrooms Renovation
Low Voltage
Electrical
Plumbing
Renovations - Interior NSC
Renovations - Exterior
Build a new solar canopy over the existing deck system.eplan
Electrical
Renovations - Exterior
Electrical
Interior/Exterior Work
Change Occupancy
Other
Fire Alarm
Low Voltage
Interior/Exterior Work
Electrical
Interior/Exterior Work
Plumbing
Solar Panels
Solar Panels
Demolition - Interior
Renovations - Interior NSC
Other
Low Voltage
Low Voltage
Low Voltage
Renovations - Interior NSC
Plumbing
Electrical
Fire Alarm
Boston Medical Center- begin construction, demolition, rough framing, electrical, mechanical and plumbing pending issuance of ALT 1297870 . All work will be in full compliance with…
Subdivision Combining Lot
Commercial Parking
Gas
Plumbing
Electrical renovations throughout the Building.
Fire Alarm
T-Mobile to utilize existing equiment romm, re4place existign telecommunications equipment, replace existing antennas adding one antenna per sector (3 total), replace existing RRU'…
Phase 2 -; Installation of new HVAC for vacant spaces, construction of bathrooms, floor leveling, lobby finishes, replacement of three storefronts and sidewalk repairs. Adding 4 sp…
Installation of 2 Exterior Signs.
Warehouse, Wholesale, Food Processing, Office, Wireless Comm., Facility, Non-Profit Recording; Studio Certificate for Non Profit Recording Studio-Only Alt 1026555 issued 12/23/19 ;
Installation of CAT 6 cabling , jacks and patch panels for network system. Installation of audio cabling from Studios and Sound Booths to respective Control Rooms.
Installation of 5 security cameras and 2 intercoms.
Install of one roof top unit.
Wiring seven exterior combination lights and wiring four temporary wiring of four 30 kw heaters, two 15 kw heaters, and three 3kw heaters.
replacing old fire alarm wiring & devices
1st Floor Low Voltage Control Wiring for (15) VRF Split units and (1) ERU
Per approval BPDA 3-3-20, install 3 signs: A. on corner of existing canopy, ill numerals and letters to read "960" / "mass ave". B. on West elev, parallel illum sign cabinet @20 sf…
Plumbing fit out work.
Installation of heat detector loop and monitor module to allow for the impairment of spinkler system
Extend existing fire alarm system to include installation of (1) Power NAC Booster, (2) Pull Stations, (1) Smoke Detector, (1) Duct Smoke Detector, (35) Horn Strobes, (6) Strobes,…
Wiring of new recording studio, to include installation of (2) panelboards, (2) transformers and feeders. new receptacles, switches, lighting controls and light fixtures. Wiring fo…
Fit out space for new tenant. fp/fa Add new finishes.; LPR ;
installation of roof drains, Sanitary waste and vent future stubs and future water service
4 future services, bringing gas line from basement to roof 4 times
Relocate a Sprint wireless shelter to a new room on the third floor. Relocate a 200 amp 1 phase 208 volt load center
Temp relocation of existing 200 amp service
Renovation of an existing multi-tenant commercial building with associated electrical work.
Complete;demo of exterior loading dock and canopy, removal of transformer shed,;removal of roof penthouse structures and roofing,;removal of misc. interior finishes and topping sla…
Partial renovation and demolition of existing building at 960 Ma. The current building consists of three levels above grade and partial basement. In addition to the renovation of t…
Removal of ballast on roof Removal of roof membrane down to concrete Removal of roof top penthouse Removal of non structural interior partitions Ref Cranshaw Construction permit #A…
Install gas fired unit heaters
Eight (8) subsurface exploratory test boring to approximately 20 feet below ground surface
Up to 10 exploratory soil borings to approximately 30 feet below ground surface
Existing Sprint Rooftop Site: Sprint proposes to replace six (6) existing antennas with six (6) new LTE models; replace three (3) existing RRH (radios) with twelve (12) RRHs. Insta…
Make Safe Repairs (Removing/Rebuilding Areas of Brick Masonry) @ areas of displaced masonry (Single wythe brick) Miscellaneous Repointing Installation of Control Joints
4 geoprobes in parking lot at corner of 960 MA Ave, and Theodore Glynn Way
gas piping for stove
test borings to assess subsurface conditions NOTE: Engineer's stamp is included on Attachment A
park;food truck for lunch business on;side of building as indicated on plot plan.
Fifteen (15) Addressable Pull Stations Forty Seven (47) ADA Ceiling Horn/Strobes One (1) Explosion Proof Strobe in Spray Booth Nine (9) Wall Mount Horn/Strobes Eighteen (18) ADA St…
To Park a Food Truck('The Fresh Stop');as ISD Health approved, to Sell Food on side of building facing Theodore Glynn Way. (ALT225207/2013; Warehouse, Wholesale Food Processing, Of…
Warehouse, wholesale, food processing, office, wireless communication facility, catering business C/O-For;Catering;Business - 2ND.FL. ALT 156223, ISSUED 10/18/2012, A221941, ISSUED…
Installation of a base fire alarm per drawings by JB Engineering
Reduced Scope as per plans.Wicked Kitchen;eliminate employee room and storage room from original permit/plans.Fire alarm and sprinkler per base buil;ding plans submitted for review…
Interior non-structural remodeling for office and studio space,the record company. Addition of new secondary egress: 1st floor to grade. Per Plan. Fire alarm and sprinkler per base…
rewire 2400 sq. ft of commercial space add 70 amp subpanel
demolition of the 1st floor only
replace sprinkler heads and add sprinklers. as per plans also hood system
Steam Boiler Replacement
Replacement Steam Gas Boiler
elec work in catering facility
Change Occupancy to include a Catering Business and install neccessary equipment as per plan. Amendment for Fire Protection;to be;filed and issued before final inspection.
We will make an addition to the exterior stairs of the building. An additional stairs from the first floor to the roof will be added for maintnance on the roof.
Would like to Change occupany from warehouse,wholesale food processing office,wireless communications to; include "Non-profit Recording Studio". Last occupancy of our space conclud…
installing a 18 inch x 36 inch vent at the elevator
Installation Of Split Ac Units. 5 Indoor fan units and 2 Outdoor AC Condensors. Totaling 5.5 Tons
Wire green zone lighting display. 4 flrescent fixtures, 5 led fixtures.
Replace lighting with energy efficient fixtures at 960A Mass. Ave. - Rugcraft Serv. Corp.
Install 23 light fixtures, wire up-to-code outlets and switches
REMOVE OLD SINK AND REPLACE WITH NEW KITCHEN SINK
frame 265 lf of walls, 420sf of drop ceiling, 80 sheets of sheet rock, and install kitchen cabinets
TO PLACE HOT DOG CART ON LAND ADJANCENT TO NEW MARKET SQUARE