Building permit intelligence · Boston, MA
108 Arlington St has 15 municipal building permits on file in Ward 5. The latest recorded activity was a electrical permit dated May 20, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 10 mapped permits within 500 m of this address.
Electrical
Electrical
Signs
Interior/Exterior Work
Five Residential Units;&;; garage;(4) Parking Spaces;; Alt 649070 issued 4/25/19 ;
Check existing gas/for finish inspection. Rough inspection was done but permit expired
10 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Arlington St with municipal permit records in Boston.
This address has 15 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 108 Arlington St is dated May 20, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 108 Arlington St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Finish work only. Roughs have been completed
1) Air Sealing 2) Attic blow in cellulose to achieve R-38 3) Blow in dense pack cellulose inside walls
Change;occupancy;from hotel &; restaurant to five residential units use existing curb cut and garage door to make four parking spaces.FP and FA ; ;
New Service upgrade from 400A to 800A. 5 new meters. Electrical system Installation per plans.
Install Fire alarm system per plans for basement floor through the fifth floor.
Install intercom system and telecom system per plans.
Renovation of existing 5 story building. Gas Fireplaces, gas boilers and water heater
Renovation of plumbing waste, vent, water piping and fixtures.
Change occupancy from;Offices, Chapel, Food Distribution,English classes for Immigrants 2 times a month: both programs operated by Church;to Hotel and Restaurant#36A/#37. Renovatio…
Electrical Permit · ELECTRICAL · Jul 21, 2026