Building permit intelligence · Boston, MA
75 Arlington St has 200 municipal building permits on file in Ward 5. The latest recorded activity was a fa permit dated Jun 26, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 9 mapped permits within 500 m of this address.
Fire Alarm
Fire Alarm
Electrical
Electrical
Roofing
Roofing
9 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Arlington St with municipal permit records in Boston.
This address has 200 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 75 Arlington St is dated Jun 26, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 75 Arlington St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fast Track Application
Fast Track Application
Low Voltage
Low Voltage
Low Voltage
Electrical
Special Events
Wire lighting and appliances for showroom display @ 75 Arlington Street
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Fire Alarm
Electrical
Low Voltage
Electrical
Interior/Exterior Work
Interior/Exterior Work
Low Voltage
Fire Alarm
Low Voltage
Low Voltage
Electrical
Interior/Exterior Work
Interior/Exterior Work
Erect mobile hydraulic stage Stageline SL50 16' x 20' for special event on 6/12/2022. Stage will be built on 6/12/2022 and ready for inspection by 12:00PM.
Job# (21-0074-10) WeWork Tel/data 98 devices
Interior selective renovation of the 10th floor office space to provide updated to current tenants. Scope of work includes added electrical, millwork cabinets, plumbing for added s…
Job #15469 WeWork 10th Floor Modifications
Job #15469 WeWork 10th Floor Modifications
Job #15454 WeWork 2nd floor Modifications
Job #15454 WeWork 2nd Floor modifications
Interior selective renovation to the 2nd floor office space to provide updates to the new tenant. Scope of work includes added electrical, data and heat pump to IT Room, added data…
Offices, Retail, Restaurant; Certificate for Core and shell -;floors 4th &; 9th - Only ALT11050604 issued 2/21/20
Offices, Retail, Restaurant; Certificate for;Office and Common;- Lower Level-Only Alt1057812 issued 6/5/20, SF 1059739 issued 3/5/20
Offices, Retail, Restaurant Certificate for Offices;on ;2nd &;10th fl-Only Alt941676 issued 7/31/19, A 1054759 issued 6/12/20;
Interior work. Extension of office partition and creation of new office.
NEW TELEPHONE AND DATA WIRING IN BASEMENT ENGINEERING OFFICE FOR TRINITY CONSTRUCTION.
HVAC control wiring on the Lower Level
Provide 3 120V duplex receptacles on 1st, 10th and Elevator Machine Room
Amendment to ALT941676. Interior office reno to an existing on the 2nd &; 10th floors (45,900 sf). Includes removal/installation of interior non load bearing partitions and finishe…
Build out of Management Office and Common Restrooms in Lower Level. see SF1059739 [ePlan]
Installation of; a 10" x 30" wall plaque for "Wework".; Approved by Landmarks. Installed by the licensed professional Martin Aronovitz CS 081891;;;;;;;;;;;;;;;;;;;;; E - plan
Job #14891 Demo & make safe 4th & 9th floors Install temps
Job #14891 Demo & make safe 4th & 9th floors Install temps
Renovation of existing lower level management space
Concrete trenching for underground plumbing, rough framing, rough electrical, rough plumbing, rough HVAC. Work associated with ALT1057812
Provide power for lighting and device wiring for newly remodeled basement office space @ 75 Arlington Street - Basement Level
Provide fire alarm devices, wiring and testing for newly remodeled basement office space
Removal of interior finishes only on the 4th and 9th floor, FP/FA Fast Track
5th Fl office renovations. Alterations to an existing Fire Alarm System. Adding a few devices to existing system. MJC101
voice and data cabling
Renovation of existing 5th floor pantry space.
HVAC control wiring on the 2nd and 10th floors
Interior renovations of an existing build out on the 5th floor of a 10 story office building with generic tenant build-out. Interior finishes are building standard.
MJC101. Job site is 75 Arlington St. 5th Floor Boston 02116 Office renovation, new lighting and power. 250 light fixtures total, 25 receptacles
Voice, Data, Security and AV Cabling for WeWork Space on floor 2 & 10
Renovation of existing building to suit new tenant fit out.
Replacement of existing sanitary stacks on floors 1-10
Job #14406 WeWork Renovation on 2nd & 10th Floors
Job #14406 WeWork Renovation on 2nd & 10th Floors
Basement storage room. Relocate reefed (3) panels. Add receptacles, existing signs & EBU's
Interior renovation of a storage room on the basement level at 75 Arlington Street to include new GWB/paint and minor relocation of HVAC and lighting. No new sprinkler or fire alar…
Replace three sanitary risers in the building with larger diameter piping.
Int. reno to existing office space on 2nd&;10th fl, total sq ft 45,900. Work to include removal and installation of interior non load bearing partitions and related finishes. Modif…
Offices, Retail, Restaurant Certificate for the 7th floor Offices ALT939087 - 4/23/19 &; S918870 - 2/1/19 ; ;
Offices, Retail, Restaurant Temp. Certificate For: Offices - 7th Floor - Valid for;30 Days, Expires;6/31/19 Pending completion of permit Alt939087 - 4/23/19, &; S918870 - 2/1/19 ;…
Installing new fire alarm devices in tenant space. (MacMillan)
bring power to a fire alarm panel
New Pre-action system on the 7th floor of 75 Arlington monitored by the existing building fire alarm system.
install new kitchen sink and install 2 new water heaters
Install low voltage cable, connectivity, and system components associated with an AV system upgrade at 75 Arlington for Vineyard Wind.
MacMillan Learning - 7th Floor -; Cost reflected on;SF918870 (incorrectly filed - to be abandoned);Demolition of existing Offices, construct new Offices, Conference Rooms, etc.;;ne…
31 telecom drops for tenant Macmillan Learning on 7th floor of 75 Arlington St.
Displays for digital signage and conference rooms with connectivity to computers in the following locations (6 total): AV Conference, Boardroom, Flex Room, Huddle, Reception, & Caf…
S19-462, connect jumpers, receptacles and plug in base feeds for office workstations @ 75 Arlington St 7th flr, Tenant Vineyard Wind.
New fire alarm devices being installed to existing system for a fire pump upgrade project at 75 Arlington St.
demo of existing wallsfor new office
Upgrade the Fire Pump room and associated mechanical @ 75 Arlington St
Installation of a fire pump, modifications to the existing standpipe risers and FDC, and fit-out of a new fire pump room at the Basement Level. It should be noted that the existing…
Reuse and relocate existing FA devices on the 10th floor for demo white box project.
10th floor demolition & temporary power & lighting @ 75 Arlington
Removing;and disposing of interior finishes including carpet, ceilings, millwork.
7th floor-Interior renovation of an occupied space including new floor finishes, paint, millwork, &; new power feeds for furniture.
New fire alarm devices being added to the existing system on the lower level of 75 Arlington Street.
New fire alarm devices being added to the existing system on the 10th floor of 75 Arlington.
Offices, Retail,; &; Restaurant Certificate For:; (9) Offices, (1) Conference Room, &; (1) kitchen - 7th Floor - only Alt851775 - 7/30/18, &; Sf794671 - 1/22/18
Demo only - 75 Arlington Street - Basement
10th floor AHU upgrade fit-out
Renovation of existing Waste and Water piping.
Demolition of select area on lower level of 75 Arlington
Lower Level - Scope includes electrical make safe, minor HVAC and drywall demolition
Renovation of 7th floor kitchenette
tel-data cabling
Upgrades to AHU Room on 10th Floor
OME18-053 75 Arlington St 7th Floor Renovation
OME18-053 75 Arlington St 7th Floor Renovation
Construct 9 offices, 1 conference room and 1 kitchen. 7th Floor at 75 Arlington St.
New and relocated fire alarm device being tied into the existing system on the 2nd and 4th floor of 75 Arlington Street.
Remove non bearing interior partitions, acoustical ceiling and flooring. Work to be in compliance with 241.
5 security devices for tenant Holland & Knight on the 10th floor of 75 Arlington / 10 St. James (corrects wrong address on permit # ELV792655) J# JV-176964
Plumbing Reno - 75 Arlington Street
Electrical make safe/ Demolition/ White Box to existing vacant tenant space on 2nd/4th Floor
Demo/Removal of existing Air Handler and replace with new in same location on the 10th floor, plumbing, new HVAC equipment and fire alarm work
Demo existing offices on the 2nd floor and build new room to house replacement Air Handler, includes selective demo, new drywall partitions, new sprinkler, new HVAC equipment and n…
demo and renovations to office space on the 2nd &; 4th floors, demo all existing finishes,make safe electrical of all electrical wiring, ductwork and kitchen sinks, turn up existin…
new work and old work
Offices, Retail &; Restaurant Certificate for Offices (Third Floor) ALT680437 issued: 2/28/2017
Infill existing floor openings from 7th to 8th floor as per structural engineers drawing and narrative (part of alt587164) already issued
floors 7@8
Install low voltage cabling and Audio Visual system components at 75 Arlington Street for The Boston Foundation.
renovate bathrooms and new pantry sinks
3rd floor
3rd floor office
3fd fire
190 telecom drops on the 3rd floor of 75 Arlington St for tenant Boston Foundation
build out of office space for tenant on the 3rd floor. Work to include all new offices, conference rooms, storage area, server room, employee kitchen area, new partitions, all new…
S16-1068, connect jumpers, install receptacles and plug in based feeds for office workstations.
CBRE - 3rd floor demo of existing tenant space
Offices, Retail, Restaurant ALT198640/2012; Certificate for Liberty Mutual - 6th floor offices ALT556487 issued: 2/9/16
Audio Video wireing 7th and 8th floor MacMillian company
minor prep demo for new tenant - 3rd floor
364800- Macmillan 75 Arlington St.
low voltage wiring for voice and date
Demolition of existing partitions and flooring finishes to refresh current occupied space on floors 7 and 8 for the current tenant. Acquiring additional space on the current floor,…
8th floor
8 floor
Provide wiring of access control for 8 doors and 8 cctv cameras
Replace existing devices with new
remove one existing HVAC unit replace w new HVAC unit, Install new mechanical room and
New fire alarm devices being tied into an existing Fa System on the 6th floor of 75 Arlington for tenant Liberty Mutual.
3rd-remove one existing hvac unit
3rd floor AHU replacement
Power & lighting on the 6th floor
3rd floor HVAC control wiring for the AHU replacement
Install ( 150) wiring devices & HVAC control wiring on the 6th floor
new sink & heater
Liberty Mutual - -6th floor tenant fit for new offices include drywall partition, electric, sprinkler, plumbing , HVAC and finish work
Liberty Mutual - 6th floor preparatory demo for new renovations
Replace lighting with energy efficient fixtures at Martin's News Shops, 631-549-4592.
Provide power & lighting in north & south Mech. room
HVAC low voltage control wiring on the 4th floor for 2 AHU's
Fire Alarm wiring in 4th floor mechanical rooms
replacement of 2 HVAC units on 4th floor
Remove closet and shelving and counters. Repair drywall and ceiling. Touch up paint. F&;I casework in kitchen area. work performed on 10th fl , office
Install new locations for voice and data.
Installation of a new Emergency Generator on Roof.; Work;to include construction of a new steel support structure for Generator.; Installation / integration of all;emergency circui…
Removal of four existing air handling units within seventh floor mechanical rooms (north and south). Install two new air handling units within the same mechanical rooms. Rooms to b…
Removal of existing Fire alarm ductsmoke and smoke detectors for (2) airhandler replacements
Demoltion of existing electrical to airhandler units on the 7th floor and installation of new wiring to (2) new replacement airhandling unts.
restaurant fit-out
Installation of 250kw generator, associated ATS and feeds for distribution
Replace gas fixture.
Replace plumbing fixture.
Rewire replacement dishwasher.
8th floor Replace 4 existing Air Handlers with 2 new Trane units repair all penetrations associated sprinkler and fire alarm work and paint WORK PAID FOR ON SF # 189050
8th floor - Replace 4 existing air handlers w 2 new Trane units After replacement is fiunished any penetration will be filled to the deck and mechanical rooms will be repainted
Removal and replacement of fire alarm devices for (2) area's located on the 8th floor for AHU replacement
Renovation of (2) AHU units and assocatied rooms, upgrade lighting and power located on the 8th floor
Rework of exisitng tenant feeders, house feeders and Nstar metering to new bus duct riser (Done on a previous project) Work to take place on each floor of the building and requires…
Minor interior renovations to; New England School of Art and Design. selective non-structural interior demolition, new finishes to include new carpet, paint, millwork, ceilings. Mi…
Exterior masonry restoration
offices, reatil, and restaurant C/O-For Common Areas- Fls 1-10; -only alt90257, issued 10/11/2011;
elec work in one family kitchen
replace fire alarm control panel display - first floor
remodel kitchen - remove wall in middle of kitchen, remove ceiling and sheetrock,install insulation on exterior wall, new kitchen cabinets and countertops, patch vinyl siding at th…
Installation of (13) smoke detectors for new electrical closets
Relocation of (1) 400amp CT (WO# 1879401) and (1) 200amp meter (WO# 1879387) located at 75 Arlintong Street for renovation
Sediment Carbon Water Filtration System **Please note there is no APT, just 75 Arlington St, floor 7, Boston, MA 02116**
Demolition of kitchen
Installation of (2) busdcut risers and electrical rooms for future tenant and building power distribution
Provide wiring for new office and new storage room being built.
Build two offices in previously open office space.
Removal of (3)existing HVAC units on the 9th floor and installation of wiring for (2) new units to replace the existing
Removal and replacement of exisitng fire alarm devices for HVAC renovation on the 9th floor
Converting an abandoned elevator shaft (10 stories) into electrical closets on each floor for a new building Bus Duct.Sprinkler amd devices
repair cracks, patch holes and masonry work
Sediment Carbon water filtration system ***Please note that building is located at 75 Arlington Street, Boston, MA 02116***
Furnish &; Install new HVAC units, ductwork, piping and Electrical work on 9th Floor for CBRE.
Selective demolition of walls for new busduct. Basement Level. please see Alt90257
offices, retail and Resaurant C/O-For Offices 7-(B) -ONLY ALT 80917, ISSUED 6/16/2011 ;
Low voltage wiring to add electric door strike.
low voltage work for PB World 9th floor, relocating cat5e cables
fire alarm 3th floor
fire alarm 7th floor
Low voltage tel data work - 7th floor
renovation of existing interior office: demo misc walls, ceilings, carpet. frame walls and finish, install new ceilings, lighting, relocate sprinkler heads, fire alarms, new carpet
Renovations to existing space
Renovations of existing office space on the 4th &; 9th Floors for Parsons Brinckerhoff. Work includes Demolition, Drywall, Flooring, Paint, Acoustical Ceilings, HVAC, PLumbing, Ele…
New lighting, power and misc relocates, demo
Construction of (2) offices, (1) Conference Room and open office space on the 10th Floor for Parsons Brinkerhoff. Work includes demolition, drywall, carpet, patching and painting.…
NESAD 4th floor convert 3 offices into one remove drywall partition, new drywall, shelving, electrical, associated HVAc and finishes
electrical
work on lobby level of 10 st. james
Demo of existing AHU and replace with new. tenth floor work.
Electrical Permit · ELECTRICAL · Jul 21, 2026