Building permit intelligence · Boston, MA
211 Congress St has 118 municipal building permits on file in Ward 3. The latest recorded activity was a intren permit dated Jul 13, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 23 mapped permits within 500 m of this address.
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Electrical
Electrical
23 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Congress St with municipal permit records in Boston.
This address has 118 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 211 Congress St is dated Jul 13, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 211 Congress St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fast Track Application
Electrical
Renovations - Interior NSC
Low Voltage
6th floor renovation to include MEP make safe, demo of finishes, new non structural partitions, new finishes (flooring, millwork, ceilings) new and modify existing MEPS to accommod…
Electrical
Low Voltage
Fire Alarm
Plumbing
Renovations - Interior NSC
Electrical
Electrical
Removal of non-structural partitions and architectural finishes. Renovations to common areas along 1st floor to include new exterior glazing system, main lobby finishes and MEP upg…
Plumbing
Electrical
Fire Alarm
Fast Track Application
Fast Track Application
Renovations - Interior NSC
Low Voltage
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Electrical
Electrical
Fire Alarm
Fire Alarm
Fast Track Application
Renovations - Interior NSC
Fast Track Application
Plumbing
Plumbing
Plumbing
Plumbing
Fast Track Application
Fire Alarm
Electrical
Low Voltage
Renovations - Interior NSC
Fast Track Application
Low Voltage
Fast Track Application
Low Voltage
Fire Alarm
Fire Alarm
Installation of Plumbing for a kitchen sink on the 6th floor,
Installation of Plumbing for a kitchen sink on the 6th floor,
Additions and alterations to electrical in an existing space.
Offices, Stores, Restaurant, Tailor Shop, and BakeryCertificate For Offices 9th fl.-OnlyAlt1353215 issued 8/16/22
Project 9610 RMF 211 Congress - install (30) dual communication outlets.
Partial 6th Floor - demo of existing finishes and MEPS, renovation to include non structural partitions, new finishes (flooring, millwork and paint) new and rework existing MEPS.
partial 6th Suite 602 -demo of existing finishes and make safe MEPS, new finishes (walls, flooring, millwork) and new and reworked MEPS **different buildout than ALT 1387616 on sam…
Renovation of the 8th fl
Additions and alterations to electrical in an existing space.
Wire data and TV cable for an office.
selective removal of architectural finishes. Install new high end finishes (flooring, millwork, glass, ceilings, walls) and new and reworked MEPS on the 9th floor. E[plans]
Selective removal of non-load bearing partitions and architectural finishes. New architectural finishes to include: drywall, flooring, ceiling, and painting. Rework of MEPs.
Tenant fit-out, including new light fixtures, and general power outlets on existing distribution @ 211 Congress St. 9th Fl.
Install -(1) new smoke detector, and (2) new indicating devices.
Installation of Plumbing for a kitchen sink on the 9th floor,
Low voltage building automation and controls @ 1st floor
Minor Removal of select architectural finishes. on 9th Floor // ALT1353215
suite renovation on 6th floor
Replace Lighting Only
Electrical make safe of branch power and lighting on the 11th floor
Offices, Stores, Restaurant, Tailor Shop, and Bakery;Certificate for: Offices 3rd &; 4th fl. - onlyALT1281556 issued 1/26/22;
interior renovation to 3000 SF suite
Install wiring within office cubicles on 3rd floor for Comlink Data
Renovation to 3rd and 4th floor tenant spaces which includes installation of (9) horn strobes, (12) strobe onlys, (3) ceiling mounted horn strobes, (3) RAI, (3) smoke detectors, ET…
11th floor renovation - minor demo, minor new drywall, new ceilings, flooring and paint and new light fixtures throughout and rework hvac
Low Voltage Wiring permit for ComLink Data at 211 Congress St 3rd & 4th Floors
Plumbing piping and fixtures at ComLink Data, 3rd & 4th floors
Renovation to 3rd and 4th floor tenant space to include installation of lighting, power, fire alarm and subpanel.
3rd and 4th floors - new high end finishes (flooring, millwork, glass, ceilings, walls) and new and reworked MEPS
Elec app. Per approval BPDA install internally illum parallel wall sign at 33" x 119" @ 27.27 sf. To read: logo/Better Bagels.
3rd & 4th Floors - MEP make safe and demolition of interior finishes and non structural partitions
Remove existing countertops and install new. Build 5ft long half wall and install two outlets.
Replace existing kitchen cabinets and sink. Repair ceiling and wall. 4th floor Moveri Suite
panel to panel connections
Install new millwork, flooring, selective demolition to interior non structural office partitions. 10th Floor Manning Suite.
Change out finishes in existing men's and women's bathroom on the 6th floor.
Offices, Stores, Restaurant, Tailor Shop and Bakery. Certificate for 2nd Floor Offices. ALT1070916 Issued June 2, 2020
32 workstations install jumpers and receptacles/4 infeeds (not hard wired)
47 telecom drops on the 2nd floor of 211 Congress St for tenant Solum Partners (MA207920)
The installation of a card access control system on the 2nd floor at 211 Congress Street, Boston, MA for Solum Partners.
remodel of Starbucks coffee shop consisting of new lighting and outlets at front and back counters
Installation of plumbing for a ADA Half bath and a kitchen sink on the 2nd Floor,
Install all necessary plumbing for a store remodel
renovation to the 2nd floor Solum space
renovation to the 2nd floor Solum Space
New tenant suite construction on the 2nd floor to include new offices, meeting rooms, pantry/kitchen area, new finishes, MEP modifications, sprinkler and fire alarm work.EPLAN
REMODEL OF EXISTING STARBUCKS. PROPOSED INTERIOR SCOPE INCLUDES NEW FLOOR AND WALL FINISHES IN THE CAFE AND RESTROOMS; NEW MILLWORK, EQUIPMENT SHIFTING, ARTWORK, CEILING FINISHES A…
remove 4 old windows, create large masonry openings and install 2 new windows
Using a temporary generator provide power to commercial being filmed at this location
Offices, Stores, Restaurant, Tailor Shop and Bakery Certificate for Offices on the 8th floor - only ALT938028 issued 4/16/19
Demo/Make safe of all Electrical in 2nd floor tenant space. Install Temp lighting and power in 2nd floor tenant space.
Install wiring within office cubicles on 8th floor for LA Fuess
Installation of a key switch access control system on the 8th floor main entrance to the new offices of LA Fuess Partners at 211 Congress Street.
LA Fuess, Misc low voltage HVAC control wiring - AP, 197187
211 Congress St., 3rd & 4th Floors - Replace tenant ACLU office entry and interior doors with new for added security. New door openings in place, new doors, frames, and more secure…
KITCHENNETTE
Installation/modification of fire alarm for tenant space
New Tennant fit up on 8th Floor.
Interior office renovation on the 8th Floor for tenant LA Fuess. Selective demolition of existing office space and build-out of new office space. Non-structural interior partitions…
tie work stations together
Installation of 2 smokes, 2 strobes, 10 speaker/strobes
Fit-up of office space
kitchen sink and water heater replacement
Installing Voice & Data Cable for the office
Demo/Make safe of electrical in 5th floor tenant space to be renovated. Install temp lighting and power in tenant space. Remove all branch circuits back to panel.
Card Access on the front door of the 2nd floor suite.
Plumbing Permit · PLUMBING · Jul 30, 2026