Building permit intelligence · Boston, MA
300 Harrison Av has 64 municipal building permits on file in Ward 3. The latest recorded activity was a gas permit dated May 12, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 7 mapped permits within 2 km of this address.
Gas
Gas
Gas
Plumbing
Fire Alarm
Plumbing
7 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Harrison Av with municipal permit records in Boston.
This address has 64 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 300 Harrison Av is dated May 12, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 300 Harrison Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Electrical
Renovations - Interior NSC
Electrical
Outside Seating
Generators
Re-install kitchen sinks and dishwashers to support cabinet replacement in the following units: 245, 344, 345, 444, 445, 544, 545.
Install new light fixture and track light at units 244, 245, 247, 344, 345, 346, 347, sconce light in front unit 444, 445, 446, 447, and 545
Repairs due to water damage. Replace insulation and drywall, Reinstall Kitchen cabinets and finish flooring in Apartments 544, 545, 547, 546, 444, 445, 446, 447, 344, 345, 346, 347…
Emergency call for lost power @ 300 Harrison Ave Boston
Retrofit (1232) existing lighting fixtures to LED.
Installation of Outdoor Ventless Fireplace
This application seeks to subdivide a portion of the lot at 300 Harrison Avenue and then combine it with the lot at 217 Albany Street to create a new 36,070 square foot lot (LOT4);…
Installation of new Tesla car charger for tenant at Ink Block parking garage. Install new charger, main breaker and check meter.
Modify existing "Capital One" Letterset to include new letters, "Cafe". Reposition to center of storefront. Also (1) internally illuminated lightbox in window, with stencil cut fac…
to amend to permit alt493222. No changes to size, height, length, width, see previous approval. structural, materials changes only. (the first plan has two additional support arms…
Install (1) double-sided, non-illuminated blade sign, 30"x23". Sign to be installed using a 12"x8"x1/4" plate lagged to wall. Sign has a digitally printed background with: 3/8" thi…
Install LED light in molding, relocate 2 switches and install one lighting fixture
installation of a new electrical system for a restaurant on the first floor
installation of 1 smoke detector, 3 CO detectors, 1 pull station, 3 strobe only, 4 speaker strobes and 1 exterior beacon.
install signs as per plan
Replace existing Digital Communicator with an AES Central Station Radio Transmitter
Add dry bar Add soffit/ crown detail around perimeter ceiling Remove pocket door/ add barn door Remove closet walls, make smaller closet
INK BLOCK BLD 3 LEVEL 1 ADD ELECTRICAL WIRING FOR (2) PULL STATIONS AND (2) A/V DEVICES
BUILDING 3 Added Electrical work for Future retail tenants on Level 1 of Building 3. Misc branch circuit changes. Add Misc Fixtures and duplex receptacles
Inspect electric service
Legal Occupancy:; 91 Residential Units, Offices/Common Areas &; Aminity Space Temporary Certificate of Occupancy for Building #1;;91 residential units; floors 2-8.; Leasing &; mana…
Legal Occupancy: Bldg. #1-; 91 Residential Units, Offices/Common Areas &; Aminity Space ERT140557, issued: 6/18/13 - SF214017, issued: 1/28/13 - SF248007, issued: 5/28/13 ; ;
Install (1) 34"x31.625" internally illuminated Peet's sign - to hang behind the window, the bottom to be 4' above the ground. Install (1) 15'-10.5"x3' fabricated illuminated letter…
Installation of plumbing for a coffee café ,
Ink Block SEPIA, Building 4 - Misc. Low Voltage HVAC Control Wiring SGG 141789
BEGIN LAYOUT AND FRAMING OF TENANT RETAIL SPACE "CAPITAL ONE/ PEETS COFFEE" ALL FEE'S AND WORK COVERED UNDER ALT 439147 --FAST TRACK UNDER REVIEW. ALL WORK WILL BE IN FULL COMPLIAN…
Retail Tenant fit out for Capital One 360 Café in existing vacant space.
Retail Tenant fit out for Capital One 360 Café in existing vacant space
To Amend the previously approved subdivision plan under Permit No. ALT307417 to correct a clerical error on the approved subdivision plan. The subdivision plan will created 2 Lots:…
Ink Block, Buildings 1, 2 & 3 - Misc. Low Voltage HVAC Control Wiring SGG 130726
INK BLOCK BUILDING # 1 300 HARRISON AVE (8) STORY HIGH RISE. FURNISH AND INSTALL A NEW SECURITY SYSTEM AND DOOR ACCESS ENTRY SYSTEM
INK BLOCK BUILDING 1 (8) STORY HIGH RISE FURNISH AND INSTALL A NEW FIRE ALARM SYSTEM. 1ST FLOOR COMMERCIAL/AMENITY SPACE 2ND -8TH FLOOR RESIDENTIAL SPACE. THIS BUILDING IS ATTACHED…
1 frist floor
Install signage, "WHOLE FOOD",;an internally lit channel letter wall sign. 37.8" H x 46' 11.8"W Install an internally lit channel letter wall sign. 34" H x 42'3.5"W; to be installe…
This application is for approval of a subdivision plan only. It is related to permit no. ERT140557 which was issued on 6/18/13. A subdivision plan dated November 7, 2013 drawn by B…
INK BLOCK PROJECT BUILDING 3, SELF STANDING ADJACENT TO BUILDING 1 & 2. New 8 story high rise building with 90 residential units on floors 2 through 8 and commercial space on the 1…
PROJECT NAME INK BLOCK COMPLETE NEW ELECTRICAL WIRING SYSTEM FOR BUILDING 1 # BUILDING 2 (BLD'S aTTACHED) CONSISTING 90 RESIDENTIAL UNITS IN BUILDING 1 AND 130 RESIDENTIAL UNITS IN…
NEW TEMPORARY SERVICE NSTAR WO NUMBER 1955358, 800A 3 PHASDE 480V
NEW 800A 480 3 PHASE TEMPORARY SERVICE, SEE NSTAR WO NUMBER 1947247 THIS IS FOR THE SOUTH END OF THE PROPERTY, THIS IS ONE OF (2) TEMP SERVICES ON THIS PROPERTY
New construction of a 9 story steel frame apartment building. Work includes new plumbing / gas work
New construction of a steel framed 9 story apartment building ( Building 1 of 4 ). Work includes new plumbing systems.
Certificate of Occupancy not to be issued until PIC approval Construction of a new steel frame, 9-story, Apartment building (Group R - 2).(91 Residential units)(Bldg I);This Propos…
stand by during demolition in case live power is encountered
Erect 35x45 tent on 4/10/13. Removal on 4/12/13.
Removal and demolition of non bearing walls/partitions/ceiling tiles/duct work/floor coverings to access and facilitate the removal of ACMS throughout the building
INK BLOCK DEMO-300 HARRISON-DEMO-CUT-CAP-MAKE SAFE-GAS PIPING.
INK BLOCK DEMO-300 HARRISON AVE.-CUT-CAP MAKE SAFE EXISTING PLUMBING-WASTE-WATER-VENT
Four temporary theatre sets and one temporary loading ramp for moving equipment. Everything to be removed by October 1, 2012. - Please insurance submitted with permit #SF152618
Temp genny power for film production Set
Three geotechnical borings will be performed at the above-metioned site. The work will be performed by New Hampshire Boring. This work will cost $15,000.
Seven test borings are to be installed in the parking lots surrounding the property.
Boston Herald building improvements. Including guardrails &; siding.
Electrical Low Voltage · LVOLT · Jul 20, 2026