Building permit intelligence · Boston, MA
380 Huntington Av has 60 municipal building permits on file in Ward 4. The latest recorded activity was a lvolt permit dated Jul 23, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 2 km of this address.
Low Voltage
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Gas
4 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Huntington Av with municipal permit records in Boston.
This address has 60 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 380 Huntington Av is dated Jul 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 380 Huntington Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Renovations and repairs to Churchill Hall – Modern Market and Starbucks, the work will include selective demolition, millwork, miscellaneous metals, lighting, flooring, and kitchen…
Electrical
Demolition - Interior
Plumbing
Electrical
Low Voltage
Fire Alarm
Interior/Exterior Work
selective demo, removal of ceilings and lights
Electrical
Low Voltage
Electrical
Interior/Exterior Work
Plumbing
This work will include installation of catenary lighting over an outdoor seating and pedestrian landscaped area.
Replacement of walk in refrigeration package on the 4th floor Church Hill Kitchen. evaporator and condenser are on the ground.
Classrooms, Laboratory, Auditorium and Offices ; Temporary Certificate for the;2nd &; 3rd;floor Restrooms.;;Certificate valid for 90 days; 12/11/19;pending completion of permit.; A…
Classrooms, Laboratory, Auditorium and Offices; Certificate for: Restrooms;2nd, 3rd;and Ground Floor ALT826362 - 5/8/18
Classrooms, Laboratory, Auditorium and Offices; Certificate for Classrooms and Offices 4th floor only ALT951235 Issued May 16, 2019
installation of low voltage automation system at NEU Churchill
Relocate three light poles
Lighting in tenant space 4th floor, 380 Huntington Ave Boston
380 Huntington Ave Preaction system 4th floor 20 devices 15k value.
Northeastern University - 4th Floor: Demolition of select interior partitions, ceilings, and finishes to support renovation of fourth floor west suite. Work includes new partitions…
Install 14 new V/D locations.
Demolition of select interior partitions, ceilings, and finishes to support renovation of fourth floor west suite.
Install 2 V/D locations
tenant fit out of bathroom space
HVAC Controls - Exhaust Fans and CAV
renovation of three bathrooms
384500 - NU Churchill Hall - Renovations to existing restrooms in Churchill Hall
Renovations of 2nd floor restroom and creating a new ground floor and 3rd floor restroom. The two main stairwells will receive new carpet and paint. Additionally, an existing compr…
Lighting , power, A/V System and Installation of Lectern System
Install 21 New Tel/Data locations on the 4th floor.
Classroom, Laboratory Auditorium and Offices Certificate for;Bathrooms;located on the first (2);and fourth floors (3), Classrooms 101 &; 103 ALT697439 issued: 6/7/17 &; ALT697426 i…
Install 4 new Dual Data locations and reuse 4 existing locations
NEU Churchill - Classroom Reno, Misc. Low Voltage HVAC Control Wiring - AP, 174641
floors 1-2-4
floos 1-2-4
Audio Visual System in Churhill 101 and 103. Installation of video projection system along with audio.
These ;Additional bathrooms are being renovated in order to satisfy plumbing code requirements on alt697426. These bathrooms are to be located on the first and fourth floors.
The project includes complete renovation of the auditoriums in Churchill Hall: classrooms 101 and 103. The following finishes and scope included are replacing and improving: floori…
Replace cook stove
Churchill Hall: Install Hvac controls for one air handling unit and six va boxes.
University Uses, Classrooms, Labs, Offices, and Food Services/Cafeteria. C/O;for Cafeteria. Permit# alt75020-6/14/11
WIRE NEW CABINETS FOR CAFETERIA, INSTALL LIGHTS
Installing of voice and data locations
interior preliminary demolition for work on ALT84973 of rm 446 in Dana hall
relocate 1 - speaker strobe, add 3 - new speaker strobes and 1 - new duct smoke detector.
perform tenant fit up for rebeccas cafe at northeastern univ, furnish and install new lighting, general power and kitchen wiring, adding 1 new 225 amp panel off of main distributio…
Complete gas piping per plans.
Complete plumbing work per plans.
Renovate existing cafeteria in the basement of Churchill Hall, Northeastern University. The work includes, demolition of ceiling, fixtures, HVAC, millwork, etc.. New work includes,…