Building permit intelligence · Boston, MA
465-479 Huntington Av has 195 municipal building permits on file in Ward 4. The latest recorded activity was a short form bldg permit permit dated Jul 13, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 4 mapped permits within 2 km of this address.
Electrical infrastructure work at the MFA - Attic- Basement Levels - West wing. Work to include; electrical power and distribution, new electrical equipment and infill flooring.
Install 2 temporary natural gas heaters for outdoor event tent for the duration of 1 night.
Erect 50x82 and 9x71 tents on 5/12/26, removal on 5/15/26.
ADDING TO EXISTING SYSTEM (10) DEVICES. ADDING NEW CEILING SPEAKER STROBES AND MONITORING MODULES
adding and replacing to existing FA SYSTEM (6) CEILING SMOKE DETECTORS IN 116/117 GALLERY
4 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Huntington Av with municipal permit records in Boston.
This address has 195 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 465-479 Huntington Av is dated Jul 13, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 465-479 Huntington Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Build out of 281-282 galleries. branch circuitry, lighting, power distribution equipment and fire alarm.
MFA Japanese Gallery renovation of existing office and art galleries 281 and 282 approximately 3500 sq ft on the 2nd floor. Scope to include selective demo, drywall, lighting, spri…
Roofing & Skylight Improvements
Exterior restorations and waterproofing to the MFA Huntington Wing 2nd floor East and West. Scope to include; repointing, flashing, waterproofing and drain repairs.
Job# 26-001 MFA Japan Galleries Electrical upgrades
Replace (4) total drains in galleries 116 &117. Temporarily disconnect and re-install under sink sump pump in galleries 116 & 117. Install new cold water piping, vent and sanitary…
Office renovation at the MFA - 116/117 for future use - 3500 sq ft. Work to include; selective demo, drywall, millwork, MEP upgrades, lighting, sprinkler modifications and FA devic…
Linde Wing Room 259-263 Replace VAV controllers QTY 11, reconnect to new VAV controller replace communication trunk with CAT 6. Job#25-6046
Install wiring to (23) photoelectric smoke detectors and (14) ceiling mounted speaker strobes in the first and second floor galleries
Refresh lighting and lighting controls in galleries 145A, 145B, 152, 154, and 268.
Wire humidifier - Power and low voltage (Job#25-6044)
Modern Gallery renovation at the MFA on the 1st and 2nd floor to existing galleries - approximately 9500 sq ft. Galleries 144-146, 152-154, 268. Work to include partitions, finishe…
Erect 10x20 and 20x30 tents on 6/16/25, removal on 6/16/25.
Modification of (8) sprinkler heads in gallery 152. All work and cost in conjunction with SF1732973.
Selective interior demolition for the Modern Galleries 145, 146, 152, 154 and 268 at the MFA.
Relocation of 1 smoke detector and removal of 1 smoke detector.
Relocation of 2nd Floor Electric Room to new 1st Floor Electric Room. Relocate 2 panels, add two new panels, and relocate lighting controls to 1st floor electric room.
Install conduit and wiring for (4) smoke detectors and (1) speaker/strobe.
Removal and Reinstallation of 4 light fixtures, 2 exit signs, 1 camera, 1 motion sensor. Provide circuit to 7 electrical radiant heaters. Install heat trace cable at windows.
Renovation to an existing Gallery 258 on the 2nd floor of the MFA. Work to include architectural finishes, MEP upgrades, millwork and FA/FP modifications as needed.
Remove and relocate recetacles and lighting fitures to change room layouts
Application filed for fire review purposes only. All work and cost in conjunction with ALT1677436
Demolition of the Gallery 258 Electric Room and Overhead Soffit including the rework of the existing Electric Room Power to the First Floor Electric Room .
Renovation to an existing offices at the MFA, Asian Wing, levels 3 and 4. Work to include; selective demo, architectural finishes, mechanical, electrical, sprinkler and fire alarm…
Erect 8x28x32" and 8x28x24" platforms on 9/28/24, removal on 9/28/24.
Erect 50x82 and 9x71 tents on 9/26/24, removal on 9/29/24.
MuseumCertificate for Common Areas floors 1st, 2nd and AtticALT 1414345 Issued 11/22/22
Installation of new stairs and additional egress lighting and exit signs.
Roof 8F Roof Replacement. Remove existing PVC membrane and insulation down to existing concrete deck. Install fully adhered vapor barrier to deck, install 2 layers of 2.5" iso to V…
Temporary construction trailer to be placed on private property for up to (1) year at the MFA.
MFA - AHU Install. Misc. Low Voltage HVAC Control Wiring. SM-232052
Install receptacles for case display lighting fixures and install conduits in the Japanese Gallery wall for futute infrastructure projects.
Installation of sanitary piping for cast iron roof drains (885630).
Replacement of existing skylights and roofing material at the MFA Evans Wing Roof.
Interior renovations to the existing Japanese Gallery on the 2nd floor of the MFA, Asian Wing - Room 280. Work to include, selective demo, architectural finishes, electrical upgrad…
Install pipe and wiring to flow/tamper switches per contract drawings
Install new exit lights and hallway lighting
Upgrades to the sprinkler system of the MFA in the Evans Wing and Art of Asia, Oceania and Africa. Work primarily in the ground level, 2nd floor and attic area. Associated fire ala…
Install a carbon monoxide safety valve. Install 1 new appliance- tilting skillet in Museum 465 restaurant.
Temp generator power for film production. (AND ONLY TEMP GENERATOR POWER) Base Camp On Forsyth Way 8-22-2022
A temporary stage will be erected along the Forsyth/Huntington lawn by stage-owned vendor contracted by the Museum. Stage is 10' x 20' and 3.5" tall. The stage will be up from 10:0…
Temp generator power for film production (AND ONLY TEMP GENERATOR POWER) Set " Museum of Fine Arts"
MFA ECM#2 DDC Upgrades. Misc. Low Voltage HVAC Control Wiring - NB - 219614
Complete the FINISH electrical portion from Permit SF1240254 started by Ostero Electric. The FINISH portion consists of 4 receptacle circuits, the installation of a track light sys…
General maintenance and repair of building lighting systems, power distribution systems, fire alarm systems, batteries, motors, motor controllers, transformers and generator system…
Erect 40x60 tent on 12/13/21, removal on 12/17/21.
Temporary natural gas heat for event tent.
Museum;Certificate for: Center for the Netherlands Arts - Evans Wing Basement Level;ALT11611189 issued 3/17/21
Erect 40x60 tent on 10/19/21, removal on 10/21/21.
Erect 50x85 and 6x60 tents plus 16x24x16" high platform on 10/6/21, removal on 10/10/21.
Temporary natural gas heat for event tents.
security cabling
Completion of existing X-ray room work previously permitted under permit #886705. (COO included in attachments). Scope includes rough carpentry, minor duct rework, lighting/wiring,…
Dutch Gallery Renovation - Existing gallery on the 2nd floor. - 242 Work to include; partitions, MEP upgrades and finishes.
Install 6 T-stats & low voltage controls wiring to 6 VAV’s @ MFA, 465 Huntington Ave
Data cabling for Netherlandic arts project at MFA, basement level
Temporary event stage in existing parking lot. Install temporary movie screen
Install (35) fire alarm devices.
Installation of branch devices
Remodel area in Museum of Fine Arts
411900 - MFA Netherlandish Art - Install new fixtures and associated piping for kitchenette and two bathroom.
Museum of Fine Arts;Certificate for 2nd fl.- Galleries # 207,208, 213, 214-OnlyAlt 1020116 issued 11/21/19
Fit out of existing space on the Basement Level of the Evans Wing to provide upgraded MEP's, and architectural finishes for the Center for the Netherlands Arts. Included in this sc…
Plumbing demo work for The Center for Netherlandish Art
Install temporary fire alarm heat detectors
Demolish approx 5,000 sq feet of Museum office and storage space on the basement level
Temp generator power for film production. (AND ONLY TEMP GENERATOR POWER) Set 12-10-20
Make safe of electrical and plumbing. Demo all architectural finishes
Erect 50x85 and 9x60 tents on 4/23/20. Removal on 4/26/20.
Work performed in galleries 207, 208, 213 & 214 demo, makes safe, install new panels, outlets, lights, devices & low voltage raceways
Remove fa devices, relocate devices and install new devices in galleries 207, 208, 213 & 214
MFA Art of the Ancient World; low voltage HVAC control wiring 208250 NPB
Museum Certificate for;Common Areas-Bsmt &; Offices;Levels 3 &; 4 of the White Wing-Only Alt 886705 issued 12/04/18 ;
Erect 16x24x24" high platform with stairs on 12/3/19. Removal on 12/3/19.
Museum of Fine Arts - Interior renovation of four existing galleries within the MFA Behrakis Wing for the Art of Ancient World. Galleries included are 207,208, 213 and 214. Work to…
Temp generator power for film production Set 9-17-19
Erect 50x85 tent on 9/5/19. Removal on 9/8/19.
Control wiring for HVAC Equipment on 3rd and 4th floor
museum replacing 5 light fix with 2 new fix
Interior finish upgrades including millwork, flooring, and paint in the Bravo Restaurant located in the Museum of FIne Arts, Boston. No changes to fire alarm or sprinklers.
329 cables for data, 155 cables for security
MFA Asiatic Wing AHU Upgrades, Misc low voltage HVAC control wiring - NPB, 175149
Renovation of the Museum of Fine Arts Conservation Center Area in the basement and levels 3 &; 4 of the White Wing. The scope includes demolition and replacement of interior partit…
Erect 20x24x24" high stage and 8x8x24" high stage on 12/3/18. Removal on 12/3/18.
Installing plumbing fixtures &; associated piping at the MFA Conservation Center
Installing gas piping to equipment at the MFA Conservation Center
Mechanical Makesafe, Partition/finish Demo and abatement on levels 2,3,4 and roof of Museum of Fine Arts White Wing.
electrical renovation for conservation denter located in basement 3rd 4th floor and roof
3rd and 4th floor
Erect 50x85 tent and 12x16x16" high platform on 10/5/18. Removal on 10/7/18.
Furnish wiring for Automatic Temperature Controls @ 465 Huntington Ave
the Museum is has 5 galleries being converted into office space, room 217, 116, 151, 154 &145/ 146. security is cabling only no terminations
MFA is constructing a Temporary Paintings and Objects Conservation studio to allow for a future renovation. Adding a sink, emergency eye wash, and a deionized water system to the s…
MFA is constructing a temporary Research Lab to allow for a future renovation. Demo and replace 1 sink. Add an emergency eye wash station, 2 compressed air turrets, a reverse osmos…
Renovation of existing space on the first floor for new research and conservation engineering space.
Renovation of existing space on the first floor for new research and conservation engineering space.
Renovation of existing space on the second floor for new paintings and conservation space.
Renovation of existing space on the second floor for new paintings and conservation space.
MFA is moving an office area to enabel a future renovation. Adding a sink to the new office are to accomidate tennant needs
Renovation of 3 existing spaces to provide new offices. Install new devices connected to existing circuits.
Renovation of 3 existing spaces to provide new offices.
Temp. conversion of 2nd floor an existing gallery space to Museum conservation studio. minor demo, MEP modifications, new rof penetrations for exhaust ducts.
Renovation of 3 existing spaces to provide new offices, research and engineering. Install new devices connected to existing circuits.
Renovation of 4 existing spaces to provide new offices, research and engineering.
Alter and existing space on 1st floor , work includes interior demo of walls and MEP's. New work upgrades to MEP's, FA/FP.
Museum of Fine Arts -; 1st Floor -; Interior renovations of 3 Galleries to convert these spaces to Administrative Offices.; Modify existing HVAC, MEP's, FA &; FP systems
Renovate kitchen cafe' space
Erect 40x75 tent on 9/29/17. Removal on 10/1/17.
Museum COO for Greek Gallery (212) Alt671331 issued 2/17/2017
Low voltage data cabling in new Greek gallery
MFA Greek Art Gallery, Misc. Low Voltage HVAC Control Wiring - NPB, 174216
Install new lights, panelboard, receptacles, misc low voltage raceways, lighting control wiring, display case wiring, temp wiring, makesafe
Remove and relocate fire alarm devices as well as install new devices off of an existing fire alarm system. The work being performed is associated with the "Daily Life of Ancient G…
Upgrades to an existing storage space and gallery, this work includes MEP upgrades, finish upgrades and (2) new interior glazing entries to gallery 212.
wire & install 2 duplex recpt and feed 1-office partition
Add new interior glazing and door for office space, new paint, patch drywall, balance space, add new outlets and furniture feeds.
Erect 30x75 tent on 12/9/16. Removal on 12/10/16. Occupancy < 150 people.
Erect 30x75 tent on 11/4/16. Removal on 11/5/16.
Erect 20x30 tent on 10/13/16. Removal on 10/15/16
install new pendant on existing wiring supply 3 outlets old work
Addition of a new wet automatic sprinkler system in Gallery 217 at the Museum of Fine Arts.
Annual Electrical Maintenance Permit
Install 100LFT PVC conduit for future temporary art installation on Huntington lawn. Run time April - September 2016 Proposed trench and fill Tuesday, Feb 2nd.
Erect 20'x24'x 24" high stage on 11/12/15. Removal on 11/12/15.
This work consists of adding fire protection in areas, BW005, BW02, BW01, BW01A and G75 per the Design Drawings of AHA.
Erect 16x20x32"high platform on 12/20/14. Removal on 12/20/14
Kitchen sink faucet.
Annual Electrical Maintenance Permit for Museum of Fine Arts, Boston
temporary gas for tent
Temporary power for event inside the Museum of Fine Arts on October 11th of 2014.
Legal Occupancy:; Museum Certificate of Use and Occupancy for the;Gallery/Second Floor ;(Ancient Greek Gallery) ALT317953 issued: 1/17/14, A360634 issued: 5/29/14
Erect 60x58 and 15x15 tents and 60x60x16" high platform on 9/1/14. Removal on 9/8/14
Erect 46x60 and 10x10 tents on 7/24/14. Removal on 7/24/14
Museum COO for Impressionist Gallery Alt295597 issued 11/22/2013
Selective interior changes to level 2 at the MFA.Work to include structural platform to hold new air handler, and additional sprinkler head in attic space.;All changes in conjuncti…
Removal of existing corrugated fiberglass skylight and infill of steel deck and miscellaneous steel framing. Area to be covered with EPDM roofing assembly and associated flashing's…
Installation of Bench Spray Booth for use for Aerosal 11 oz cans hand spray only. In the furniture conservation area at the Museum of Fine Arts, Boston.
MFA Ancient Greek Gallery (JME Job #14-1125~NPB) Install Low Voltage Control System.
data cabling
Gallery renovation: Demo old lighting track and install 192 linear feet of new track using existing circuits. Approximately 100 LED fixtures will be used. Install 60A Lutron CCP li…
Erect 16'x 20'x 30" high platform on 3/22/14. Removal on 3/22/14.
Fire alarm fitout of new gallery at 465 Huntington Ave. (GEC #14007).
Fit out of new gallery at 465 Huntington Ave. (GEC #14007).
Install (1) 15' x 50' temporary tent on 3/4/14 and remove by 3/5/14
Install conduit and 3P/30A breaker to existing panel and maintenance disconnect switch for spray booth.
Connection of existing fire alarm system to supervise dry chemical suppression system of new spray booth. Additional audible/visual device to be added.
Remove the existing water wash draft hood that protects two fryers and replace it with a Type I Exhaust hood. The duct will connect to the existing 12" x 12" duct at a point just a…
Interior renovation to the 2nd floor gallery at the Museum of Fine Arts. Work to include; selective demo, HVAC, sprinkler, electrical and FA. Basement and attic minor miscellaneous…
800Amp 120/208 Lighting/Power Distribution Panel Replacement - PDP. Scheduled for Jan. 28, 2014
800Amp Lighting Distribution Panel Replacement - LPD
800 AMP, 120/208V, Distribution Panel Replacement scheduled for Jan. 7, 2014 or Jan. 14, 2014.
Gallery Expansion: Addition of 12 surface mounted lighting tracks. 4 fixture Emergency lighting expansion. Relocation of existing smoke detector and horn/strobe. Relocation of 2 co…
Install bench type spray booth with ductwork and accessories
Museum of Fine Arts - Impressionist Gallery -; New casework, hanging rail, painting, new wall covering, new light track/fixtures and controls, upgrade power distribution, new autom…
Construct new partitions with new moldings, cut/patch ceilings for new electrical, lighting, and six (6) new sprinkler heads. Add new hanging rail, install new lighting controls. R…
install temporary generators for the movie the Forger at the Museum of Fine Arts Boston. Dave Norcott is the electrician 508-631-0666 Cell
Legal Occupancy:; Museum COO for the Brock Gallery Sf188442, Issued: 10/3/12 &; Alt188882, Issued: 11/15/12
Supply and install 8 well lights. Connect to existing fixture circuit
Museum Alt76506 issued 6/27/2011 COO for 2 Art Storage Rooms
Install 8 security cameras and 2 speakers to existing gallery 171
Museum C/O-For Gallery- Newland Room- 2nd.fl. -only Alt 87829, issued 10/17/11
Museum Alt192784 issued 1/4/2013 COO for Museum - Second Floor Evans Wing "Dutch Galleries" ONLY
Museum Alt149888 issued 7/6/2012 COO for Korean Gallery ONLY
MFA-465 HUNTINGTON AVE., 2ND FLOOR REMODEL OF BENIN GALLERY (GEC#13019)
MFA-465 HUNTINGTON, 2ND FLR-REMODEL OF BENIN GALLERY - FA (GEC#13019)
Installation of 24" wide x 120" high internally illuminated MFA Garage projecting sign per plans as BRA approved.
JME Job #13-0360. Museum of Fine Arts. Benin Gallery Renovations.
Installation of two pedestals for sculptures at the Fenway side of the Museum. Granite-clad metal frames with lighting. To be installed on existing granite pavers. Approximately 5'…
Renovation to existing exhibit hall at the MFA, 1st floor. Work to include; lighting, install (4) non-load bearing walls, 1 door, 6 sprinkler heads, carpet, paint and finishes.
Replace Existing Skylights (Evans Wing)
power/ lighting wiring for renovation of gallery
Install track lighting in gallery
Installation of (4) well lights to illuminate a sculpture; utilizing existing feed.
1st floor gallery
Remove existing caulking and install new caulking from exterior windows.
Install new exerior granite sculpture pad.
Cut/patch for sprinkler installation; Install automatic sprinkler system; replace light track and light fixtures
Renovation of gallery space. Extent of work includes window in-fill, millwork, Sprinklers, fire alarm and electrical. as per plans
Renovation
Install 2 temporary gas fired heaters in the Calderwood Courtyard.
Erect 50x58, 20x30, 10x10 and 9x20 tents on 10/11/12. Removal on 10/18/12.
Demolition and enabling located in gallery in the museum in preparation for renovation under;permit ALT188882.
Museum of Fine Arts, remove existing electrical panels & replace with new.
Museum C/O For Coin Gallery- 2ndl.fl. -Only ALT 115501, ISSUED 1/27/2012
data and cat 6 cabling for video cameras
HVAC low voltage for schneider-electric JME job # 12-9671 / 138 (PAG).
Korean Gallery; Demolition of existing casework; Cut/patch for sprinkler installation; new drywall and one interior window; Paint; Replace light track and fixtures; install automat…
Erect 9x30 and 9x17 tents on 6/20/12. Removal on 6/20/12.
2 floor
2 floor;;;;;;;;;;