15 Arlington St has 70 municipal building permits on file in Ward 5. The latest recorded activity was a gas permit dated Jul 16, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 13 mapped permits within 500 m of this address.
Gas
Electrical
Other
Other
Electrical
Electrical
13 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Arlington St with municipal permit records in Boston.
This address has 70 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 15 Arlington St is dated Jul 16, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 15 Arlington St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Special Events
Plumbing
Electrical
Signs
Signs
Install a sound attenuation panel on a existing chiller Unit
Renovations - Exterior
Change Occupancy
Low Voltage
Addition
Interior/Exterior Work
Renovations - Interior NSC
Renovations - Interior NSC
Minor modifications of approved drawings as per attached narrative. Amendment to ALT1183445.eplan
Installation of one set of illuminated letters reading "Zegna" 1'-1" x 4'-7 3/4" Approved by Landmarks, installed by the licensed professional Anthony Clayton CS 104861
Plumbing for new utility sink.
Change of use to include retail. Build-out ground floor for men's clothingstore and basement area for storage
Renovation of existing space to Ermenegildo Zegna restaurant
Renovation of existing space to new Ermegildo Zegna restaurant
Renovation of existing space to new Ermenegildo Zegna restaurant
Remove misc. steel and old flag embedment's Repair Stone Façade Wash Stone Façade
Installation of one Blade sign and one Awning for "Contessa" Approved by Landmarks
Amendment to ALT909950. Masonry and drywall enclosures to existing chimneys on floors 16, 17/Roof. Work includes structural work. Capping Chimneys as noted. Reference Bulletin 12 d…
Replace 3/4" backflow preventer Watts Model 909 (s/n 653069) with Watts Model LF909 (s/n 051079). Located in chiller room
Install Jeremias 8" ID/10" OD 316L stainless steel double wall flue extension as required for flue stack to specified height and orientation per Jeremias' specifications. Install K…
Installation of signs for "One Newbury"; 5 planter monograms, 1 address plaque, 3 property plaques, 1 leading hotel plaque, 2 streetbar window graphics, 1 delivery sign, 1 smoking…
Install fire alarm devices for amenity space renovation
Interior fit out of 17th and 18th floor of existing building, including new commercial kitchen/Restaurant per ALT1002714 , MEP's and finishes.; ;-;;;;;;;;; 1st Floor – Dedicated en…
Plumbing renovation at 15 Arlington Street (Newbury Hotel Restaurant)
Plumbing renovation at 15 Arlington Street (Newbury Hotel Restaurant)
Amend ALT909950. Changes to original plans as noted for Taj project.; LPR
REPLACING CAST IRON DRAINS. STARTING OVER BALLROOM, 2ND FLOOR TO 1ST FLOOR. APPROXIMATELY 120 FEET OF PIPING.
TAJ Hotel Rooftop Enclosure - HVAC Control Temp
Taj Hotel-Public Amenities Renovation, tele/data wiring
Disconnect and reconnect both a temp Generator and existing Generator while the Existing permanent Generator is being maintained/rebuild.
Gas rework for kitchen remodel
Install Oil minder pump in elevator pit and pipe to oil water separator on same level
Line (45) Traditional Wood Burning Fireplaces with stainless steel/Smoke chamber repairs/firebox repairs
Renovation of the sidewalk and plaza along Newbury Street and Arlington Street, Boston. Work includes removal of existing sidewalk, installing new water retention tank and repaving…
TAJ Guestrooms Electric baseboard (30) wire in line voltage thermostat Electric wall panel (17) wire in line voltage thermostat (1) baseboard electric heat with line voltage ERA (4…
Taj Hotel -;Rooftop;- 17th Floor -; Renovation to existing Rooftop.; Additional selective demo, masonry restoration, structural steel, roofing, glass &; glazing, drywall, paint, me…
HVAC Temp. Control Public Space
Interior renovation of public spaces; basement through 2nd Floor. Includes demolition of partitions &; MEP-FP's and replacement of new partitions &; MEP-FP's as per documents.;in C…
Hotel public amenities renovation/demo, 2nd floor kitchen, rooftop bar/restaurant and exterior lighting
Remove existing sidewalk, install ground water retention tank, back fill and repave sidewalk.
Plumbing renovation at 15 Arlington Street (Taj Rooftop Enclosure)
Remove plumbing work at 15 Arlington Street - Drop by Others (Taj Amenity Demo)
Install a trailer mounted temporary generator while the existing permanent generator is being repaired/maintained
Remove interior finishes including partitions, millwork and MEP enabling on floors basement, 1st through 3rd floors.
Make safe;removal of plumbing, mechanical and electrical at roof and penthouse levels. Work includes;removal of enclosed horizontal mechanical piping chases, equipment and metal sh…
Rough tele/data cabling for Taj Newbury Street Tower Floors 14 and 15 only
Renovation of 2 buildings including Guestrooms, common areas, elevators and Mech. rooms
Plumbing renovation at 15 Arlington Street (Taj Hotel)
Taj Hotel FCU Replacement, Misc low voltage HVAC control wiring - FGK, 186619
Install new FA master panel, raceways and terminal cabinets. Build new FA cabinets. This scope is Phase 1 of a multi-phased project to upgrade the existing FA equipment while the b…
REPLACE BACK BONE FIRE ALARM SYSTEM, FIRE ALARM SYSTEM IN GUESTROOMS & INSTALL NEW BDA SYSTEM
DEMO/MAKE-SAFE FLOORS 3-16; DISCONNECT/RECONNECT EXISTING FAN-COOL UNITS & WIRE NEW UNITS; REPLACE FIRE ALARM SYSTEM; INSTALL NEW BDA SYSTEM
Guestroom and corridor renovations on floors 3-16. Selective demo on floors 4-13. New finishes, new plumbing, new toilet exhaust and associated HVAC, new sprinkler, electrical and…
ADVANCE TWO (2) BORINGS TO DEPTHS OF 50 AND 20 FEET, RESPECTIVELY, OUTSIDE OF THE EXISTING BUILDING FOOTPRINT.
Non structural removal of walls ceilings and finishes on first floor cafe area, 14th, 15th and 16th floors. Associated mechanicals included. (ALT905945) No structural, egress, and/…
TAJ Hotel Boston. 3rd floor Demolition of Interior non-structural partitions & finishes. Including drywall, plaster, fixtures, furnishings, VWC, wood moldings, flooring, light fixt…
TAJ Hotel model room renovation of 1614. Includes all interior finishes, wall covering, carpet, stone flooring, millwork, lighting and complete bathroom remodel.
TAJ Hotel Boston - Guestroom Fan Coil Replacement project. Remove and dispose of 371 existing FCU's from 293 Guestrooms, storage rooms and corridors on floors 4 through 16. Deliver…